ID Date Author Category Type Module Target/Number Subjectdown Text Attachments
  1569   Tuesday, June 27, 2017, 14:34 David WangConditioning StationStandard OperationTM4 TM4 vacuum has been connected at TCSTurbo -pumps are started . The vacuum looks
good so far.
  
  2181   Monday, January 25, 2021, 10:57 David WangSouth Hot-CellRepairTM4 TM4 steers short investigation.Cables were disconnected for steers in
containment box. The Megga measurement (500V)
result from the top of the module: 
  
  1801   Tuesday, October 09, 2018, 12:32 David WangConditioning StationRepairTM4 TM4 steers 4 pin feedthrough CF flangeTM4 Steers 4 pin feedthrough CF flange
is replaced due an inside feed through insulator
broken. CF 25 cooper seal is replaced with
  
  2149   Tuesday, September 29, 2020, 12:12 David WangITERepairTM4 TM4 steerers staus after" left " grounding issue, and first stage investigation
Left (short) is switched with bottom. So
on module:
  
  2214   Friday, April 30, 2021, 14:09 Luca EgoritiITE/ITWDevelopmentTM4 TM4 resistance measurements for P2N Friday, April 30, 2021, 14:06
Anders and Luca
Resistance measurements on each electrical
  
  2213   Monday, April 26, 2021, 13:02 David WangSouth Hot-CellRepairTM4 TM4 new steerer cable installation.New steerer cables are installed in TM4.
Cables are properly routed in containment
box and service cap top. After job, TP2 is
  
  1945   Friday, June 21, 2019, 07:16 David WangSouth Hot-CellDevelopmentTM4 TM4 new source tray leak check at SHC.New source tray was installed on TM4 yesterday.
LD was used to pump down all water lines.
Tube heater +D circuit has a big leak 
  
  222   Wednesday, December 05, 2012, 13:26 Grant MinorSouth Hot-CellStandard OperationTM4N/ATM4 moved from SHC to South West SiloTM4 was successfully moved from the South
Hot Cell to the South-West Silo remotely
by Grant Minor, with help from David Wang
  
  2064   Thursday, February 06, 2020, 13:32 Adam NewsomeSouth Hot-CellMaintenanceTM4 TM4 moved from Conditioning Station to South Hot Cell TM4 was moved from conditioning station
to south hot cell in preparation for wiring
replacement. No target.
  
  1953   Friday, July 26, 2019, 11:28 David WangSouth Hot-CellStandard OperationTM4 TM4 move from SHC to TCS.Tm4 has been moved from SHc to TCS without
containment box. It is a new source tray
on TM4.  A layer of plastic sheet was
  
  46   Tuesday, November 01, 2011, 11:50 David WangConditioning StationStandard OperationTM4 TM4 leak test on conditioning station I did a leak check again on TM4 today.
This time, the leak detector pump to the
bottom on both base pressure(0.0xE-4 torr)
  
  1302   Wednesday, August 03, 2016, 09:49 David WangConditioning StationStandard OperationTM4 TM4 is ready for conditioing at TCS.I started TCS water system and installed
HV cover onto TM4.  The TM4 containment
box is supplied with water also. TM4 is ready
  
  1967   Friday, August 16, 2019, 08:52 David WangConditioning StationStandard OperationTM4 TM4 is moved from TCS to SW silo.TM4 is moved from TCS to SW silo this morning.
The move is good. 
  
  732   Monday, August 11, 2014, 14:30 David WangITEStandard OperationTM4UCx #10TM4 is connected in ITE.TM4 is connected in ITE. All ITE 
turbo pumps are started. I will check the
pumping down process tomorrow morning. Everything
  
  797   Thursday, November 20, 2014, 14:12 David WangITEStandard OperationTM4UCx11TM4 is connected in ITE.TM4 has been connected connect in ITE.
Water is supplied to TM4 module only.
  
  727   Thursday, August 07, 2014, 17:07 David WangConditioning StationStandard OperationTM4UCx #10TM4 is connected in CS.TM4 is connected at CS. All turbo pumps
are started. The pumping down is good so
far.
  
  876   Friday, March 27, 2015, 11:29 David WangConditioning StationStandard OperationTM4Ta#45TM4 is connected at CSTM4 has been connected at CS which includes
high current cables, water lines, EE cable,
and Enizel lens cable. The HV cover has been 
 010.JPG013.JPG012.JPG 
  932   Wednesday, June 03, 2015, 13:51 David WangConditioning StationStandard OperationTM4SiC #31TM4 is connected at CSTM4 has been connected at CS. CS HV cover
is installed.I made a pair of new cooling
lines for TM window cooling at CS. The TM4
 007.JPG009.JPG008.JPG010.JPG 
  112   Tuesday, May 22, 2012, 15:19 David WangITEStandard OperationTM4sic 27TM4 in ITE under pumping

Normal
0





  
  196   Tuesday, October 16, 2012, 07:14 David WangConditioning StationStandard OperationTM4UCX#5TM4 heat shield helium pressure test and electrical check at CSTM4 heat shield helium pressure test and
electrical check were done  at CS 
last week. The results are good. NO leak
  