Entry  Monday, August 24, 2020, 10:11, Adam Newsome, ITW, Standard Operation, , , Entrance Module to ITW 

Entrance Module was moved from South Hot Cell to ITW Station.

Note: weight of entrance module, as shown via overhead crane's load cell, is 14,900 lbs.

Entry  Wednesday, August 19, 2020, 10:17, Adam Newsome, South Hot-Cell, Standard Operation, , , ITW Entrance Module moved to SHC 

ITW Entrance Module was moved from west station to South Hot Cell.

Entry  Tuesday, August 18, 2020, 09:57, Adam Newsome, Conditioning Station, Standard Operation, TM2, , TM2 Moved to Conditioning Station 

TM2 was moved from ITW to the Conditioning Station.

Entry  Tuesday, August 18, 2020, 09:06, David Wang, ITW, Standard Operation, TM2, , TM2 and ITW entrance module have been disconnected in ITW 

Tm2 and itw entrance module have been disconnected in ITW. I will attach disconnection checklist later.

Entry  Thursday, August 06, 2020, 14:33, Adam Newsome, Spent Target Vault, Development, , , Safety Group Relay Interface Installation IMG_20200806_091438.jpg

A relay contact-based interface module was installed in between Safety Group's storage vault door enable junction box and Remote Handling's control module for the vault door.

The purpose of this module, which contains a diode bridge and relay, is to isolate the safety system from the control module to prevent back-voltage on the safety system which can damage the PLC's power supply.

In the new configuration, rather than receiving a 24 VDC signal from the safety PLC, this signal activates the relay, whose normally closed contacts supply 24 VDC (from internal) to the safety relay inside the control module. Wiring was modified inside the control module to account for this change.

In investing how to achieve the same functionality as before this change, it was determined that the control module's electrical schematic was not correct and did not reflect the actual wiring. A new schematic was created for this based on the actual wiring, including new changes.

The system was tested by locking out the target hall, and verifying that:
- No failure occurred on the power supply for the safety PLC
- This new relay actuated when the target hall was locked out (i.e. received signal from PLC)
- This new relay correctly supplied 24 VDC to the safety relay within the control module, allowing for the Opto-22 control unit to output control signals to the motors

 

Note: currently the soft limit switches for the vault door close/open have been bypassed. This is not a safety issue; the door can still be fully opened and closed remotely (but the open override and close override buttons are rendered useless). The bypass will be rectified in the coming weeks and this e-log will be updated accordingly.

Edit (Aug. 13, 2020): the issue regarding the limit switches has been resolved. The entire system is functioning as it was prior to the safety interface installation.

Entry  Thursday, July 30, 2020, 09:57, Travis Cave, ITW, Standard Operation, TM2, Graphite #1, Module move 

 TM#2 with Graphite #1 has been moved back to the west target station from the conditioning station.

Entry  Wednesday, July 29, 2020, 09:20, Travis Cave, ITW, Maintenance, , , Entrance module move 

 The West Entrance module has been moved from the south hot cell back to the West Target Station.

Entry  Tuesday, July 28, 2020, 09:26, chad fisher, South Hot-Cell, Repair, , , Entrance Module Wire Scanner 

Entrance module wire scanner has been replaced. Pictures to follow.

Entry  Monday, July 27, 2020, 10:00, Travis Cave, South Hot-Cell, Maintenance, , , Entrance module move 

 The West Entrance module has been moved from the west target station to the south hot cell for repairs.

Entry  Friday, July 24, 2020, 09:43, Travis Cave, Conditioning Station, Maintenance, TM2, Graphite #1, Module move 

 TM#2 has been moved from the west station to the conditioning station. ITW entrance module moved will take place on Monday morning. 

Entry  Tuesday, July 21, 2020, 14:22, Adam Newsome, Spent Target Vault, Standard Operation, , , Emergency Close Mechanism Test 

The emergency close mechanism for the Storage Vault door was tested by Adam Newsome and Travis Cave. The door was opened to its fully open limit, then closed with the emergency system.

The test was successful.

Entry  Thursday, July 16, 2020, 10:20, Adam Newsome, Safe Module Parking, Maintenance, , , SMP: Annual Electrical Inspection 

An electrical systems check was performed on the SMP by Adam Newsome and Travis Cave. Overall, there were no issues to note. The following is a summary of the inspection (Work Permit I2020-07-16-1):

- Checked condition of wiring for physical/radiation/UV damage
- Checked for cable tray debris or damage
- Checked inside control panel: components and wiring, labeling
- Verified camera views
- Checked connectors for damage
- Checked pendant for damage and verified labeling intact
- Checked limit switch wiring and condition

Entry  Monday, July 13, 2020, 10:01, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move 

 TM#3 has been moved from the conditioning station to the silo.

 

Entry  Tuesday, July 07, 2020, 17:43, Carla Babcock, ITE, Development, TM4, , RF tests on new IG-LIS wiring 

Tested RF from RF driver into new IGLIS wires at ITE. Used 5V, 1MHz (2MHz setting because of internal halving issue).

As expected there was a very slight mismatch visible (original cable ~ 68 Ohms, new cable ~ 53 Ohms).

The matching resistor will be changed and it will be retested.

Entry  Tuesday, July 07, 2020, 09:16, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move 

 TM#3 has been moved from the silo to the conditioning station, where David and Frank will start on the gutting of the module.

Entry  Monday, July 06, 2020, 12:20, David Wang, ITW, Standard Operation, TM2, C#1, Five shielding blocks to ITW 

Five shielding blocks are transferred to ITW

Entry  Monday, July 06, 2020, 07:54, David Wang, ITE, Standard Operation, TM4, UCx 30, TM4 has been connected in ITE connection  Tm4_UCx_30_connection_checklist.pdf

TM4 has been connected in ITE. Vacuum pumping down is good so far.

Entry  Friday, July 03, 2020, 14:08, Travis Cave, ITE, Standard Operation, TM4, UC#30, Module move 

 TM#4 with UC#30 has been moved from the south hot cell to the east target station.

Entry  Friday, July 03, 2020, 13:23, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#30, TM4 UCx#30 Electrical check and HS leak check TM4_UCx30_elctrical_and_leak_check_at_SHC..pdf

Electrical and leak check are good. See attachment.

Entry  Friday, July 03, 2020, 08:46, chad fisher, South Hot-Cell, Standard Operation, TM4, UcX#30, UCx#30 installed onto tm4 

UCx#30 has been installed onto TM4 with new high current fasteners torqued to 130 in lbs.