Entry  Monday, August 24, 2020, 10:11, Adam Newsome, ITW, Standard Operation, , , Entrance Module to ITW 
Entrance Module was moved from South Hot Cell to ITW Station.
Note: weight of entrance module, as shown via overhead crane's load cell, is 14,900 lbs. 
Entry  Wednesday, August 19, 2020, 10:17, Adam Newsome, South Hot-Cell, Standard Operation, , , ITW Entrance Module moved to SHC 
ITW Entrance Module was moved from west station to South Hot Cell.
Entry  Tuesday, August 18, 2020, 09:57, Adam Newsome, Conditioning Station, Standard Operation, TM2, , TM2 Moved to Conditioning Station 
TM2 was moved from ITW to the Conditioning Station. 
Entry  Tuesday, August 18, 2020, 09:06, David Wang, ITW, Standard Operation, TM2, , TM2 and ITW entrance module have been disconnected in ITW 
Tm2 and itw entrance module have been disconnected in ITW. I will attach disconnection checklist later. 
Entry  Thursday, August 06, 2020, 14:33, Adam Newsome, Spent Target Vault, Development, , , Safety Group Relay Interface Installation IMG_20200806_091438.jpg
A relay contact-based interface module was installed in between Safety Group's storage vault door enable junction box and Remote Handling's control module
for the vault door. 
Entry  Thursday, July 30, 2020, 09:57, Travis Cave, ITW, Standard Operation, TM2, Graphite #1, Module move 
 TM#2 with Graphite #1 has been moved back to the west target station from the conditioning station.
Entry  Wednesday, July 29, 2020, 09:20, Travis Cave, ITW, Maintenance, , , Entrance module move 
 The West Entrance module has been moved from the south hot cell back to the West Target Station.
Entry  Tuesday, July 28, 2020, 09:26, chad fisher, South Hot-Cell, Repair, , , Entrance Module Wire Scanner 
Entrance module wire scanner has been replaced. Pictures to follow.
Entry  Monday, July 27, 2020, 10:00, Travis Cave, South Hot-Cell, Maintenance, , , Entrance module move 
 The West Entrance module has been moved from the west target station to the south hot cell for repairs.
Entry  Friday, July 24, 2020, 09:43, Travis Cave, Conditioning Station, Maintenance, TM2, Graphite #1, Module move 
 TM#2 has been moved from the west station to the conditioning station. ITW entrance module moved will take place on Monday morning. 
Entry  Tuesday, July 21, 2020, 14:22, Adam Newsome, Spent Target Vault, Standard Operation, , , Emergency Close Mechanism Test 
The emergency close mechanism for the Storage Vault door was tested by Adam Newsome and Travis Cave. The door was opened to its fully open limit, then
closed with the emergency system. 
The test was successful. 
Entry  Thursday, July 16, 2020, 10:20, Adam Newsome, Safe Module Parking, Maintenance, , , SMP: Annual Electrical Inspection 
An electrical systems check was performed on the SMP by Adam Newsome and Travis Cave. Overall, there were no issues to note. The following
is a summary of the inspection (Work Permit I2020-07-16-1):
- Checked condition of wiring for physical/radiation/UV damage 
Entry  Monday, July 13, 2020, 10:01, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move 
 TM#3 has been moved from the conditioning station to the silo.
 
Entry  Tuesday, July 07, 2020, 17:43, Carla Babcock, ITE, Development, TM4, , RF tests on new IG-LIS wiring 
Tested RF from RF driver into new IGLIS wires at ITE. Used 5V, 1MHz (2MHz setting because of internal halving issue).
As expected there was a very slight mismatch visible (original cable ~ 68 Ohms, new cable ~ 53 Ohms).
The matching resistor will be changed and it will be retested.
Entry  Tuesday, July 07, 2020, 09:16, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, Module move 
 TM#3 has been moved from the silo to the conditioning station, where David and Frank will start on the gutting of the module.
Entry  Monday, July 06, 2020, 12:20, David Wang, ITW, Standard Operation, TM2, C#1, Five shielding blocks to ITW 
Five shielding blocks are transferred to ITW
Entry  Monday, July 06, 2020, 07:54, David Wang, ITE, Standard Operation, TM4, UCx 30, TM4 has been connected in ITE connection  Tm4_UCx_30_connection_checklist.pdf
TM4 has been connected in ITE. Vacuum pumping down is good so far.
Entry  Friday, July 03, 2020, 14:08, Travis Cave, ITE, Standard Operation, TM4, UC#30, Module move 
 TM#4 with UC#30 has been moved from the south hot cell to the east target station.
Entry  Friday, July 03, 2020, 13:23, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#30, TM4 UCx#30 Electrical check and HS leak check TM4_UCx30_elctrical_and_leak_check_at_SHC..pdf
Electrical and leak check are good. See attachment. 
Entry  Friday, July 03, 2020, 08:46, chad fisher, South Hot-Cell, Standard Operation, TM4, UcX#30, UCx#30 installed onto tm4 
UCx#30 has been installed onto TM4 with new high current fasteners torqued to 130 in lbs.