213
|
Tuesday, November 13, 2012, 10:55 |
Travis Cave | ITW | Standard Operation | TM1 | TiC#3 | module move |
TM#1 with TiC #3 moved from the conditioning station to the west target station, move went well. |
227
|
Tuesday, January 08, 2013, 08:48 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | TiC#3 | Electrical check |
TM#1 with TiC #3 post beam. See attached PDF for results. |
Attachment 1: TiC#3_Elec_Check_Post_beam.PDF
|
|
232
|
Tuesday, January 15, 2013, 14:37 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#3 | Spent target move |
TiC #3 was moved from the south hot cell in to the vault storage today, it was placed in slot 4B and was in pail #104, it had a reading of 98.7mSv/hr upon removal from the south hot cell. See attached PDF for vault details. |
Attachment 1: Vault_Storage_January_15_2013.pdf
|
|
2689
|
Monday, September 23, 2024, 11:35 |
David Wang | ITW | Standard Operation | TM4 | TiC #9. | vacuum leak check on TM4 service cap in ITW. |
vacuum leak check on TM4 service cap in ITW was done this morning. leak detector leak rate 0.0XE-9 atm.cc/sec. No leak on TM4 service cap module top. |
2640
|
Tuesday, July 16, 2024, 11:15 |
David Wang | ITW | Standard Operation | TM4 | TiC #7 febiad. | TM4 has been moved from TCS to ITW. |
TM4 has been moved from TCS to ITW. the move is smooth. |
2641
|
Tuesday, July 16, 2024, 11:15 |
David Wang | ITW | Standard Operation | TM4 | TiC #7 febiad. | TM4 has been moved from TCS to ITW. |
TM4 has been moved from TCS to ITW. the move is smooth. |
2661
|
Friday, August 16, 2024, 09:50 |
David Wang | South Hot-Cell | Standard Operation | TM4 | TiC #7 febiad. | TM4 has been moved from SMP to SHC. |
TM4 has been moved from SMP to SHC. The move is smooth.
|
209
|
Thursday, November 08, 2012, 08:42 |
David Wang | Conditioning Station | Standard Operation | TM1 | TiC #3 | TM1 TiC #3 target heat shield helium pressure check is done. |
TM1 TiC #3 target heat shield helium pressure check is done at conditioning station. Applied 80 psi helium to HS circuit for 5 minutes . There is no response had been found on leak detector. The leak detector base LR 0.0x E-9 atm.cc/sec, and BP 0.0xE-4 torr. CS and TM1 vacuum are at low E-6 torr range. The HS circuit is leak tight. |
208
|
Wednesday, November 07, 2012, 11:09 |
David Wang | South Hot-Cell | Standard Operation | TM1 | TiC | TM1 heat shield circuit leak check with TiC target at hot cell |
Chad and i did a leak check on TM1(Lp-TiC) heat shield water circuit at south hot cell. There is no leak had been found on it. The circuit is leak tight at present. I will do helium pressure check on this circuit at conditioning station once the vacuum is good enough. |
776
|
Monday, November 03, 2014, 11:16 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | ThO#1 | ThO#1 Installed |
ThO#1 has been installed onto TM1 and is ready for leak and electrical checking. High current fasteners torqued to 130 in lbs. |
777
|
Monday, November 03, 2014, 13:47 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ThO#1 | Electrical check |
TM#1 with ThO#1 electrical check see attatched PDF for details. |
Attachment 1: TM1_elec_check_ThO1_SHC.PDF
|
|
778
|
Tuesday, November 04, 2014, 11:05 |
David Wang | South Hot-Cell | Standard Operation | TM1 | ThO#1 | Leak check on TM1 HS water line withThO#1 installed. |
Chad and I leak checked HS line on TM1 with ThO#1 target installed. The LD pumped down to base leak rate 0.0xE-9 atm.cc/sec, base leak rate 0.0xE-4 torr. The pumping down process is normal. Chad sprayed helium on both VCR joints (each for 2 seconds) , and he did a flush spray around the target for 5 seconds. No any response had been found on LD during and after the spray( 40seconds waiting time). The target is leak tight. |
779
|
Tuesday, November 04, 2014, 13:17 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | ThO#1 | TM1 w/ ThO#1 ready |
Tm1 with ThO#1 is buttoned up and ready for transport. |
780
|
Wednesday, November 05, 2014, 10:20 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ThO#1 | module move |
TM#1 with ThO#1 has been moved from the south hot cell to the west target station. |
782
|
Thursday, November 06, 2014, 08:07 |
David Wang | ITW | Standard Operation | TM1 | ThO#1 | TM1 has been connected in ITW. |
TM1 has been connected in ITW. All turbo pumps are started. The pumping down on ITW is good so far. The water is supplied to TM1 for HV conditioning. |
783
|
Thursday, November 06, 2014, 08:55 |
David Wang | ITW | Repair | TM1 | ThO#1 | primary vacuum back up pressureITH CG1 ,CG2,CG4A were high. |
I found primary vacuum back up pressure ITH CG1, CG2, and CG4A were unusually high this morning. They should be about 10 -20 mtorr after one night pumping, but all of thier reading were 340-350-mtorr. Thease cause the current draw on primary turbo pumps were all over 2.0A(should be about 1.0A). I let Paul closed all BVs on primary side . The pressure dropped quickly to normal range after all BVs were closed. This shows the back up line are good. The problem are from one of the connections on primary BVs. I let Paul opened the BVs one by one,but the problem did not show again. Now ,the current draw on the turbo pumps are back to normal also.
I will keep monitoring the system and take a look on all KF25 clamps on BVs once I have a chance to access to ITW. |
785
|
Thursday, November 13, 2014, 13:52 |
David Wang | ITW | Standard Operation | TM1 | ThO#1 | 5 Shielding blocks have been transferred from ITE to ITW. |
Dan and I transferred 5 shielding blocks from ITE to ITW. The ITW is configured to take proton beam. |
856
|
Monday, March 09, 2015, 14:01 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | ThO#1 | ThO#1 removed |
ThO#1 has been removed from TM1 and placed into the plastic dissection box.
Containment box cover has been reinstalled as per usual. |
857
|
Tuesday, March 10, 2015, 09:01 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ThO#1 | Module move |
TM#1 has been moved from the west station to the south hot cell had the ThO#1 target removed and then the modules was moved from the south hot cell to the south west silo. Also an electrical check was done on the target before it was removed. |
Attachment 1: TM1_THO_elec_chk_postbeamSHC.PDF
|
|
860
|
Thursday, March 12, 2015, 13:33 |
Anders Mjos | South Hot-Cell | Standard Operation | TM1 | ThO#1 | Target inspection |
Chad, Anders and Alex inspected the target this morning. The target had no significant visible damage to the container. Some material was deposited on the Extraction Electrode.