Entry  Wednesday, May 22, 2024, 12:32, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#45, TM4 has been moved from SHC to TCS. 
Entry  Wednesday, May 22, 2024, 12:43, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#45, electrical check and leak check were done on TM4 UCx#45 target at SHC. Scanned_from_a_Xerox_Multifunction_Printer.pdf
Entry  Friday, May 24, 2024, 08:10, chad fisher, South Hot-Cell, Standard Operation, TM4, UCx#45, UCx#45 Installation 
Entry  Tuesday, May 28, 2024, 07:45, David Wang, Conditioning Station, Standard Operation, TM4, UCx#45, TCS was argon vented this morning between 6:00 and 7:30am.  
Entry  Tuesday, May 28, 2024, 10:13, David Wang, ITW, Standard Operation, TM4, UCx#45, Tm4 has been moved from TCS to ITW.  
Entry  Tuesday, May 28, 2024, 13:49, Frank Song, ITW, Standard Operation, TM4, UCx#45, Module Connection TM4_with_UCx#45_connection_in_ITW_20240528.pdf
Entry  Monday, June 10, 2024, 11:02, Frank Song, ITW, Standard Operation, TM4, UCx#45, shielding blocks transfer 
Entry  Friday, June 14, 2024, 16:04, Carla Babcock, ITW, Repair, TM4, UC#45, Replaced and reinstalled electronics in ITW cage 
Entry  Thursday, July 04, 2024, 11:45, Frank Song, ITW, Standard Operation, TM4, UCx#45, module disconnection TM4_with_Spent_Target_UCx#45_disconnection_in_ITW_2024-07-04.pdf
Entry  Thursday, July 04, 2024, 13:23, David Wang, South Hot-Cell, Standard Operation, TM4, UCx#45, electrical check on TM4 UCx#45 target at SHC after operation.  Tm4_UCx_46_at_SHC_after_operatiom.pdf
Entry  Friday, July 05, 2024, 12:50, David Wang, South Hot-Cell, Standard Operation, TM4, TiC#7, TM4 and TiC#7 target electrical check and HS leak check at SHC after target installation . 
Entry  Monday, July 08, 2024, 10:40, David Wang, Conditioning Station, Standard Operation, TM4, TiC#7, TM4 has been moved from SHC to TCS. 
Entry  Tuesday, July 16, 2024, 11:15, David Wang, ITW, Standard Operation, TM4, TiC #7 febiad. , TM4 has been moved from TCS to ITW.  
Entry  Tuesday, July 16, 2024, 11:15, David Wang, ITW, Standard Operation, TM4, TiC #7 febiad. , TM4 has been moved from TCS to ITW.  
Entry  Tuesday, July 16, 2024, 13:14, Frank Song, ITW, Standard Operation, TM4, TiC#7, Module Connection TM4_with_new_target_TiC#7_connection_in_ITW_2024-07-16.pdfMicrosoftTeams-image_(65).png
Entry  Friday, August 09, 2024, 08:11, Frank Song, ITW, Standard Operation, TM4, TiC#7, module disconnection TM4_with_spent_TiC#7_disconnection_in_ITW_20240809.pdf
Entry  Friday, August 09, 2024, 18:18, David Wang, ITW, Standard Operation, TM4, TiC#7, Tm4 has been moved from ITW to SMP. 
Entry  Friday, August 16, 2024, 09:50, David Wang, South Hot-Cell, Standard Operation, TM4, TiC #7 febiad., TM4 has been moved from SMP to SHC. 
Entry  Friday, August 16, 2024, 13:29, Frank Song, South Hot-Cell, Standard Operation, TM4, Ta#68, electrical check/leak check TM4_with_Ta#68_electric_and_leak_check_on_SHC_2028-08-16.pdf
Entry  Friday, August 16, 2024, 15:28, Aaron Tam, South Hot-Cell, Standard Operation, TM4, TiC#7 HP-FEBIAD , TiC#7 Target Removed from TM4 TiC-7_normal_exposure.jfifTiC-7_ettr.jfifTiC-7_Panel.jfifTiC-7_extraction_electrode.jfif