1132
|
Tuesday, November 24, 2015, 14:03 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | | Ta#46 |
Ta#46 has been removed from TM4. |
1133
|
Wednesday, November 25, 2015, 11:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#46 | Module moved |
Yesterday TM#4 with Ta#46 was moved from the east station to the south hot cell. |
1135
|
Wednesday, November 25, 2015, 14:13 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UC#14 | UCx#14 |
UCx#14 installed onto TM4. High current fasteners torqued to 130 in lbs. |
1136
|
Wednesday, November 25, 2015, 14:16 |
chad fisher | South Hot-Cell | Repair | | | Cell Decon |
Cell (table) was systematically cleaned with a swiffer and resulting piles of contaminated waste placed in pail with spent Ta target. |
Attachment 1: 20151125_100512.jpg
|
|
Attachment 2: 20151125_101620.jpg
|
|
1147
|
Wednesday, December 02, 2015, 10:41 |
chad fisher | South Hot-Cell | Repair | | | Drum Clean-up #2 |
Another drum of waste was removed from the south hot cell this morning. This drum contained one 5 gal steel pail (damaged), two sodium light bulbs, airlines, and tank suits. Upon removal the drum was/is 1.5 mSv/h on contact. there was 200 counts of contamination found on the lid...easily removed. It will be moved to the north hot cell at 11am. |
1151
|
Friday, January 08, 2016, 09:29 |
chad fisher | South Hot-Cell | Repair | | | Window Decon |
Entered the hot cell to perform final decon on the window. Initial swipes this morning were 11000 c.p.m. on 44-2. After decon approximately 100 counts. |
1153
|
Friday, January 22, 2016, 14:24 |
David Wang | South Hot-Cell | Standard Operation | | | 2016 Winter Shut Down Target Hall Schedule (sketch) |
Post a sketch of 2016 winter shut down target hall schedule. see attachment 1,2
UPDATE THE SCHEDULE ACCORDING TO CYCLOTRON SIDE JOB. SEE ATTACHMENTS 3,4 |
Attachment 1: 2016_winter_shut_down__target_hall_schedule.pdf
|
|
Attachment 2: 2016_winter_shut_down__target_hall_schedule.mpp
|
Attachment 3: 2016_winter_shut_down__target_hall_schedule.pdf
|
|
Attachment 4: 2016_winter_shut_down__target_hall_schedule.mpp
|
1167
|
Wednesday, March 16, 2016, 14:23 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | SiC#32 | SiC#32 removal Target Module Inspection |
SiC#32 has been removed from TM2. Quick inspection shows some troubling discoloration on the water cooled connection blocks of C and D as well as the left target heater A.
As for the target, both legs are broken and is has the normal "charge up" marks on the 9 pin connector. |
Attachment 1: 20160316_141127.jpg
|
|
Attachment 2: 20160316_141146.jpg
|
|
1168
|
Thursday, March 17, 2016, 14:57 |
David Wang | South Hot-Cell | Repair | TM2 | | TM2 first round leak check in SHC |
Chad and I finished the first round check on Tm2 water lines. The lines and spots checked are: Target oven + and - (front side braze joints) , Tube heater+and -(front side braze joints and water blocks), coil2 and coil 1(front side braze joints and area close to water blocks),. No leak has been found on all above of them. The last, we checked the GE which has the biggest leak so far. The leak detector base leak rate only can get to 4XE-9 atm.cc/sec. Chad sprayed helium very close to GE water block, and I got a quick response on leak detector. The leak rate climbed from 4Xe-9 atm.cc/sec to 1.4 atm.cc/sec. We confirmed the GE is leaking now. The exact location need to be pinpointed later once the containment box is out after the module is back to SHC. The module will be moved to TCS tomorrow morning and pressurized again there. Anders will use RGA to monitor the helium response during the check. |
1172
|
Friday, March 18, 2016, 11:43 |
chad fisher | South Hot-Cell | Standard Operation | | | SiC#32 dissection |
SiC#32 has been open for inspection. |
Attachment 1: 20160318_105519_1.jpg
|
|
Attachment 2: 20160318_105311.jpg
|
|
Attachment 3: 20160318_105248.jpg
|
|
Attachment 4: 20160318_105428.jpg
|
|
1178
|
Wednesday, March 23, 2016, 11:00 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module moved |
TM#2 was moved into the south hot cell by 08:30. |
1179
|
Wednesday, March 23, 2016, 11:32 |
David Wang | South Hot-Cell | Repair | TM2 | | TM2 Helium spray leak check on GE and MSP lines at SHC |
Chad and I did the helium spray leak check on TM2 GE and MSP water lines at SHC this morning. We confirmed the GE leak on water blocks. We can not found the MSP leak by using the helium spray since its leak rate in TCS is much smaller than GE leak. The leak check process are as below:
Leak detector are calibrated before the check.
GE lines : Base leak rate 0.0 X E-9 atm.cc/sec, base pressure 0.0 XE-4 torr.
Chad sprayed 5 psi helium to GE lines soldering joints for 5 second, no response on leak detector.
Chad sprayed 5 psi helium to GE lines water blocks( between blocks seal surface) for 5 seconds, Leak detector response to 8 XE-9 atm.cc/sec right away.
Chad sprayed 5 psi helium to GE lines soldering joints for 5 seconds again, No response on leak detector.
Chad sprayed 5 psi helium around the source tray and to vacuum duct for 5 seconds more, No response on leak detector.
MSP lines: Base leak rate 0.0X E-9 atm.cc/sec, base pressure 0.0 X E-4 torr. Chad did same thing as he did on GE lines. no response on LD. Chad repeated the test and prolonged the spray time to 10 seconds, No response.
The conclusion: It is pretty clear we have a leak on GE line water blocks seal. MSP lines leak could not be found by helium spray in SHC since it is a small leak.
|
1186
|
Friday, April 01, 2016, 11:41 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#15 | Electrical Check |
Electrical check of the target on TM#1, target in question is UC#15. See PDF for details. |
Attachment 1: TM1_elec_chk_UC#15_SHC.PDF
|
|
1194
|
Wednesday, April 06, 2016, 09:37 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#14 | module moved |
TM#4 with UC#14 has been moved from the east target station to the south hot cell. |
1195
|
Wednesday, April 06, 2016, 14:03 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#47 | UCx#14 removed Ta#47 installed |
UCx#14 has been removed from TM4 and Ta#47 installed. No marks on 9 pin connector on UCx#14. |
1196
|
Wednesday, April 06, 2016, 14:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#14, No Target, Ta#47 | Electrical Check |
Various electrical checks done on TM#4, one of post beam UC#14, of no target and with Ta#47. See PDFs for details. |
Attachment 1: TM4_elec_chk_notgt_SHC.PDF
|
|
Attachment 2: TM4_elec_chk_Ta47_SHC.PDF
|
|
Attachment 3: TM4_elec_chk_UC14_SHC_postbeam.PDF
|
|
1224
|
Monday, May 09, 2016, 10:13 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module moved |
TM#3 was moved from the conditioning station to the NE Silo. TM#2 was moved from the SW Silo to the South hot cell. |
1225
|
Tuesday, May 10, 2016, 13:37 |
chad fisher | South Hot-Cell | Standard Operation | TM2 | Ta#48 | Ta#48 Installation |
Ta#48 has been installed onto TM2. Also new window gaskets were installed.
High current fasteners were torqued to 130 in lbs. Shutter side of the containment box recieved new fasteners. |
1226
|
Tuesday, May 10, 2016, 13:54 |
David Wang | South Hot-Cell | Standard Operation | TM2 | | SHC, TM2 leak check on window line and HS line. |
Chad and I leak checked the TM2 HS and window lines after new target installation. The window line was very easy pumped down on LD. But, The HS line only could pumped to 2-3 torr at first. Chad changed the VCR gaskets on HS line(target). It solved the problem. The LD could pumped both of Window and HS lines to the bottom scale. Chad sprayed lots helium around the VCR joints. No leak has been found. WE will do helium pressurizing test on them at TCS. |
1227
|
Tuesday, May 10, 2016, 14:27 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | Ta#48 | Electrical Check |
Electrical check of TM#2 with Ta#48 attached. See the attached PDF for details. |
Attachment 1: TM2_elec_chk_Ta48_SHC.PDF
|
|