ID Date Authordown Category Type Module Target/Number Subject
  1141   Thursday, November 26, 2015, 08:52 Travis CaveSpent Target VaultStandard Operation Ta#46Spent Target move

Ta#46 was placed in the ISAC spent target vault yesterday. See attached PDF for details.

Attachment 1: Vault_Storage_November_26_2015.pdf
Vault_Storage_November_26_2015.pdf Vault_Storage_November_26_2015.pdf Vault_Storage_November_26_2015.pdf Vault_Storage_November_26_2015.pdf
  1144   Tuesday, December 01, 2015, 11:26 Travis CaveITE/ITW CoolingStandard OperationTM4UC#14Module moved

TM#4 with UC#14 has been moved from the conditioning station to the east target station.

  1152   Wednesday, January 13, 2016, 09:57 Travis CaveSpent Target VaultStandard Operation Ta#35, Ta#39, SiC#27, UC#12, ThO#1Spent targets moved to mini storage.

Five spent targets have been moved from the Spent Target Vault to Mini Storage in preparation for transfer to F-308s in February. The following targets were moved Ta#35, Ta#39, SiC#27, UC#12, ThO#1

  1166   Wednesday, March 16, 2016, 09:20 Travis CaveITEStandard OperationTM2SiC#32module moved

TM#2 with SiC#32 has been moved from the west station to the south hot cell.

  1169   Friday, March 18, 2016, 08:34 Travis CaveConditioning StationStandard OperationTM2no targetmodule moved

TM#2 with no target has been moved to the conditioning station from the south hot cell.

  1173   Friday, March 18, 2016, 13:13 Travis CaveConditioning StationStandard OperationTM2SiC#32Electrical Check

Electrical checks of the TM#2 with the old SiC#32 and without the target. See attached PDFs.

Attachment 1: TM2_SiC32_postbeam.PDF
TM2_SiC32_postbeam.PDF
Attachment 2: TM2_elec_chk_notgt_CS.PDF
TM2_elec_chk_notgt_CS.PDF
  1177   Tuesday, March 22, 2016, 10:27 Travis CaveSpent Target VaultStandard Operation SiC#32Spent Target move

SiC#32 has been moved from the south hot cell to the spent target storage. See attached PDF for details.

Attachment 1: Vault_Storage_March_22_2016.pdf
Vault_Storage_March_22_2016.pdf Vault_Storage_March_22_2016.pdf Vault_Storage_March_22_2016.pdf Vault_Storage_March_22_2016.pdf
  1178   Wednesday, March 23, 2016, 11:00 Travis CaveSouth Hot-CellStandard OperationTM2no targetmodule moved

TM#2 was moved into the south hot cell by 08:30.

  1181   Thursday, March 24, 2016, 13:55 Travis CaveConditioning StationStandard OperationTM1no targetmodule moved

TM#2 has been moved from the south hot cell to the south west silo and TM#1 was moved from the north east silo to the conditioning station. All done by 10AM.

  1184   Wednesday, March 30, 2016, 11:00 Travis CaveConditioning StationStandard OperationTM1no targetElectrical Check

The results of the TM#1 electrical check from the 29th of March 2016

Attachment 1: TM1_elec_chk_notgt.PDF
TM1_elec_chk_notgt.PDF
  1186   Friday, April 01, 2016, 11:41 Travis CaveSouth Hot-CellStandard OperationTM1UC#15Electrical Check

Electrical check of the target on TM#1, target in question is UC#15. See PDF for details.

Attachment 1: TM1_elec_chk_UC#15_SHC.PDF
TM1_elec_chk_UC#15_SHC.PDF
  1187   Friday, April 01, 2016, 13:58 Travis CaveConditioning StationStandard OperationTM1UC#15module moved

TM#1 has been moved from the conditioning station to the south hot cell, had UC#15 installed and then moved back to the conditioning station.

  1191   Tuesday, April 05, 2016, 09:33 Travis CaveITWStandard OperationTM1UC#15module moved

TM#1 with UC#15 have been moved from the conditioning station to the west target station.

  1194   Wednesday, April 06, 2016, 09:37 Travis CaveSouth Hot-CellStandard OperationTM4UC#14module moved

TM#4 with UC#14 has been moved from the east target station to the south hot cell.

  1196   Wednesday, April 06, 2016, 14:52 Travis CaveSouth Hot-CellStandard OperationTM4UC#14, No Target, Ta#47Electrical Check

Various electrical checks done on TM#4, one of post beam UC#14, of no target and with Ta#47. See PDFs for details.

Attachment 1: TM4_elec_chk_notgt_SHC.PDF
TM4_elec_chk_notgt_SHC.PDF
Attachment 2: TM4_elec_chk_Ta47_SHC.PDF
TM4_elec_chk_Ta47_SHC.PDF
Attachment 3: TM4_elec_chk_UC14_SHC_postbeam.PDF
TM4_elec_chk_UC14_SHC_postbeam.PDF
  1197   Thursday, April 07, 2016, 09:24 Travis CaveConditioning StationMaintenanceTM4Ta#47module moved

TM#4 has been moved from the south hot cell to the conditioning station.

  1204   Monday, April 11, 2016, 10:07 Travis CaveSpent Target VaultStandard Operation UC#14Spent Target move

The spent UC#14 target has been moved into the ISAC spent target vault. See the attached PDF for the details.

Attachment 1: Vault_Storage_April_11_2016.pdf
Vault_Storage_April_11_2016.pdf Vault_Storage_April_11_2016.pdf Vault_Storage_April_11_2016.pdf Vault_Storage_April_11_2016.pdf
  1206   Tuesday, April 12, 2016, 09:08 Travis CaveITEStandard OperationTM4Ta#47module moved

TM#4 with Ta#47 has been moved from the conditioning station to the east target station.

  1208   Wednesday, April 13, 2016, 10:14 Travis CaveConditioning StationStandard OperationTM2no targetmodule moved

TM#2 has been moved from the south west silo to the conditioning station.

  1220   Monday, May 02, 2016, 11:33 Travis CaveConditioning StationStandard OperationTM2no targetmodule moved

TM#2 was moved to the SW Silo from the Conditioning Station. TM#3 was from from the NW Silo to the Conditioning Station.