1141
|
Thursday, November 26, 2015, 08:52 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#46 | Spent Target move |
Ta#46 was placed in the ISAC spent target vault yesterday. See attached PDF for details. |
Attachment 1: Vault_Storage_November_26_2015.pdf
|
|
1144
|
Tuesday, December 01, 2015, 11:26 |
Travis Cave | ITE/ITW Cooling | Standard Operation | TM4 | UC#14 | Module moved |
TM#4 with UC#14 has been moved from the conditioning station to the east target station. |
1152
|
Wednesday, January 13, 2016, 09:57 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#35, Ta#39, SiC#27, UC#12, ThO#1 | Spent targets moved to mini storage. |
Five spent targets have been moved from the Spent Target Vault to Mini Storage in preparation for transfer to F-308s in February. The following targets were moved Ta#35, Ta#39, SiC#27, UC#12, ThO#1 |
1166
|
Wednesday, March 16, 2016, 09:20 |
Travis Cave | ITE | Standard Operation | TM2 | SiC#32 | module moved |
TM#2 with SiC#32 has been moved from the west station to the south hot cell. |
1169
|
Friday, March 18, 2016, 08:34 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module moved |
TM#2 with no target has been moved to the conditioning station from the south hot cell. |
1173
|
Friday, March 18, 2016, 13:13 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | SiC#32 | Electrical Check |
Electrical checks of the TM#2 with the old SiC#32 and without the target. See attached PDFs. |
Attachment 1: TM2_SiC32_postbeam.PDF
|
|
Attachment 2: TM2_elec_chk_notgt_CS.PDF
|
|
1177
|
Tuesday, March 22, 2016, 10:27 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#32 | Spent Target move |
SiC#32 has been moved from the south hot cell to the spent target storage. See attached PDF for details. |
Attachment 1: Vault_Storage_March_22_2016.pdf
|
|
1178
|
Wednesday, March 23, 2016, 11:00 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module moved |
TM#2 was moved into the south hot cell by 08:30. |
1181
|
Thursday, March 24, 2016, 13:55 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | module moved |
TM#2 has been moved from the south hot cell to the south west silo and TM#1 was moved from the north east silo to the conditioning station. All done by 10AM. |
1184
|
Wednesday, March 30, 2016, 11:00 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | no target | Electrical Check |
The results of the TM#1 electrical check from the 29th of March 2016 |
Attachment 1: TM1_elec_chk_notgt.PDF
|
|
1186
|
Friday, April 01, 2016, 11:41 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#15 | Electrical Check |
Electrical check of the target on TM#1, target in question is UC#15. See PDF for details. |
Attachment 1: TM1_elec_chk_UC#15_SHC.PDF
|
|
1187
|
Friday, April 01, 2016, 13:58 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | UC#15 | module moved |
TM#1 has been moved from the conditioning station to the south hot cell, had UC#15 installed and then moved back to the conditioning station. |
1191
|
Tuesday, April 05, 2016, 09:33 |
Travis Cave | ITW | Standard Operation | TM1 | UC#15 | module moved |
TM#1 with UC#15 have been moved from the conditioning station to the west target station. |
1194
|
Wednesday, April 06, 2016, 09:37 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#14 | module moved |
TM#4 with UC#14 has been moved from the east target station to the south hot cell. |
1196
|
Wednesday, April 06, 2016, 14:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#14, No Target, Ta#47 | Electrical Check |
Various electrical checks done on TM#4, one of post beam UC#14, of no target and with Ta#47. See PDFs for details. |
Attachment 1: TM4_elec_chk_notgt_SHC.PDF
|
|
Attachment 2: TM4_elec_chk_Ta47_SHC.PDF
|
|
Attachment 3: TM4_elec_chk_UC14_SHC_postbeam.PDF
|
|
1197
|
Thursday, April 07, 2016, 09:24 |
Travis Cave | Conditioning Station | Maintenance | TM4 | Ta#47 | module moved |
TM#4 has been moved from the south hot cell to the conditioning station. |
1204
|
Monday, April 11, 2016, 10:07 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#14 | Spent Target move |
The spent UC#14 target has been moved into the ISAC spent target vault. See the attached PDF for the details. |
Attachment 1: Vault_Storage_April_11_2016.pdf
|
|
1206
|
Tuesday, April 12, 2016, 09:08 |
Travis Cave | ITE | Standard Operation | TM4 | Ta#47 | module moved |
TM#4 with Ta#47 has been moved from the conditioning station to the east target station. |
1208
|
Wednesday, April 13, 2016, 10:14 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module moved |
TM#2 has been moved from the south west silo to the conditioning station. |
1220
|
Monday, May 02, 2016, 11:33 |
Travis Cave | Conditioning Station | Standard Operation | TM2 | no target | module moved |
TM#2 was moved to the SW Silo from the Conditioning Station. TM#3 was from from the NW Silo to the Conditioning Station. |