  2088   Tuesday, March 17, 2020, 14:59 David WangITEDevelopmentTM4P2NITE turbopumps are started.

They work fine. Current draw on all pumps are normal. I asked operator to switch on IG1 , IG1S and PNG4.

  2087   Tuesday, March 17, 2020, 12:58 David WangSouth Hot-CellDevelopmentTM4 P2N target electrical check and leak check at SHC.

See attachment. Everything looks good.

Attachment 1: P2N_target_electrical_chek_at_SHC.pdf
P2N_target_electrical_chek_at_SHC.pdf
  2086   Tuesday, March 17, 2020, 11:42 Travis CaveITEStandard OperationTM4P to N targetModule move

 TM#4 with the P to N target has been moved from the south hot cell to the east target station.

  2085   Monday, March 16, 2020, 09:25 Travis CaveSouth Hot-CellStandard OperationTM4no targetModule move

 TM#4 has been moved from the silo to the south hot cell.

  2084   Friday, March 13, 2020, 09:24 Travis CaveITEStandard Operation  Entrance module move

 The east entrance module has been moved from the south hot cell back to the east target station.

  2083   Thursday, March 12, 2020, 13:48 David WangITERepair  Entrance module TP1S broken piesces clean up.

The broken pieces in ITE entrance vacuum pit are vacuumed out.  At SHC, There are 4 pieces on module collimator block top,  wiring scanner top. Chad removed them out at SHC. Electrical check at module top is done by diagnostics group. Everything works fine.

  2082   Thursday, March 12, 2020, 13:42 David WangITE/ITWDevelopment  New ITE IGLIS cables installation

New IGLIS cables installation is done. Two bundle of new cables are pulled from ITE to electrical room. They are in one PVC conduit. The old cables are not removed yet. I will pull old cables out when new cables are installed onto device in ITE Faraday cage.

  2081   Wednesday, March 11, 2020, 10:39 Travis CaveITEMaintenance  Entrance module move

 The entrance module has been moved to the east station to the south hot cell for inspection from the turbo pump explosion.

  2080   Monday, March 09, 2020, 14:31 David WangITE/ITWStandard Operation  TH emergency exit test.

Frank and I did the test.  The emergency exit hatch on roof was opened and closed twice. Everything works fine.

  2079   Friday, March 06, 2020, 09:51 David WangSouth Hot-CellStandard OperationTM2 TM2 was moved from SHC to SMP yesterday.

TM2 was moved from SHC to SMP yesterday.  The move is successful. TM2 is located at SMP. There is no hot target on module so SMP vacuum is not started.

  2078   Friday, March 06, 2020, 09:35 David WangSpent Target VaultStandard Operation SiC #39Spent target SiC#39 removal from SHC to storage vault.

Spent target SiC#39 is removed from SHC to storage vault at 4C in pail #227.The move is successful.  Note:The small aluminum block holding wire on pail lid could be contaminated by SHC manipulator during the lid installation in SHC.

  2077   Thursday, March 05, 2020, 07:16 David WangSouth Hot-CellStandard OperationTM2SiC #39TM2 SiC #39 post run electrical checklist

 Electrical check result is fine.  See attachment.

Attachment 1: SiC_#39_post_run_cheklist..pdf
SiC_#39_post_run_cheklist..pdf SiC_#39_post_run_cheklist..pdf
  2076   Wednesday, March 04, 2020, 14:30 David WangSafe Module ParkingStandard OperationTM2 Remove of TM2 from SMP to SHC.

Frank and I removed TM2 from SMP to SHC. The move is successful.

  2075   Wednesday, March 04, 2020, 11:52 David WangITEStandard Operation  ITE HV test without module

ITE bias test is done to 48KV. No spark. We can not raise bias above 48KV. It looks like we have a current limit issue on control system when testing above 48KV.  John Cow checked current limit on PS locally. It is set to 8mA which is much higher than the test current. Isac operator issued an e-fault to control group.  

 John Chow did a local test on PS. Everything works fine.The problem is on control system. We have a 48KV voltage limit problem on control system. We decide to end the test now. 48KV is good enough before this year mini-shut down. 

  2074   Friday, February 28, 2020, 09:36 David WangITERepair  Entrance module TP1S broken piesces clean up.

Using the camera,  Frank and I inspected the broken blades in vacuum duct bending section. We are pretty sure some of  the broken parts are fallen into  bottom of entrance module and vacuum vessel since the broken pars are over on the edge of bending section. The blades rotated at high speed. Basically, They were shoot to the duct opening when they were broken from the pump. Frank and I carefully swiped all broken parts  from the edges  back to center of duct first. Then, We use vacuum cleaner sucked all broken parts out of the entrance module. We can see lots aluminum dust  during the clean up. This kind of aluminum dust also could  fallen down to bottom of module and vessel.  After clean up, We inspected duct with camera. We can see all broken pieces and dust are cleaned out.  The removed broken pieces will be stored with broken pump when the vessel bottom clean up is done.

  2073   Thursday, February 27, 2020, 16:08 Anders MjosNorth Hot-CellMaintenance  Hot Cell Entry

Chad entered the NHC today to tighten set-screws on both slave side manipulators and re-align the West side slave. Work took place using the HC Confined Space Entry procedure. See attached checklist. WP I2020-02-27-4

Attachment 1: NHC_2020-02-27.pdf
NHC_2020-02-27.pdf NHC_2020-02-27.pdf NHC_2020-02-27.pdf NHC_2020-02-27.pdf
  2072   Thursday, February 27, 2020, 10:37 David WangSafe Module ParkingStandard OperationTM2 Start of SMP vacuum pump.

TM2 in SMP with old SiC #39 target on it. SMP vacuum pump is started.

  2071   Thursday, February 27, 2020, 09:50 Travis CaveSafe Module ParkingStandard OperationTM2SiC#39Module move

 TM#2 with SiC#39 has been moved from the east station to the smp.

  2070   Wednesday, February 26, 2020, 08:45 David WangConditioning StationStandard OperationTM4 Remove of TM4 from TCS to SW silo

TM4 has been moved from TCS to SW silo. The move is fine.

  2069   Thursday, February 20, 2020, 09:27 David WangSpent Target VaultStandard Operation  Inventory of mini storage and vault.

Repacked nSiC#1 in SHC and moved it to mini storage vault. Transferred UCx26 and UCx28# from vault to mini-storage. See attachment for vault and mini-storage inventory.