  2707   Tuesday, October 15, 2024, 13:44 Travis CaveSpent Target VaultStandard Operation TiC#8 and Ta#67Spent Target Move On Friday October 11th TiC#8 and
Ta#67 were place in the spent target vault
in Tray 8. See attached PDF for details. 
 Target_Index_2024-10-15.pdf 
  2650   Friday, August 09, 2024, 16:15 Frank SongSouth Hot-CellRepairTM3TiC#8electrical check/leak check TM3 with replaced target TiC#8 has
been checked on SHC before moving to ITW.
Pls see attachment
 electrical_and_leak_check_of_TM3_with_new_target_TiC#8_replaced_at_SHC_20240809.pdf 
  2652   Friday, August 09, 2024, 18:20 David WangITWStandard OperationTM3TiC#8TM3 has been moved from SHC to ITW.With TiC # 8 installed, TM3 has been moved
from SHc to ITW. The move is smooth. 
  
  2654   Sunday, August 11, 2024, 11:25 Carla BabcockSouth Hot-CellRepairTM3TiC#8short on multipin wires to TBHT discoveredWith the new TiC#8 target installed on
TM3, there was a ~7kOhm connection between
TGHT/TBHT (A/B/C/D) and HV common. The standard
  
  2671   Tuesday, August 27, 2024, 13:30 Frank SongITWMaintenanceTM3TiC#8module disconnection TM3 is disconnected and all water
lines are purged/refilled with 50psi Nitrogen.
Pls see pics attached with.
 TM3_with_TiC#8_disconnection_in_ITW_2024-08-27.pdf 
  2672   Tuesday, September 03, 2024, 11:40 David WangITWStandard OperationTM3TiC#8TM3 has been moved from ITW to S-W silo.TM3 has been moved from ITW to S-W silo.
The move is smooth. 
  
  2685   Wednesday, September 18, 2024, 13:40 Aaron TamSouth Hot-CellStandard OperationTM3TiC#8Target removal  TiC#8 HP FEBIAD removed from TM3
Target sitting in SHC
1 Coil Conductor bolt fell under
 13x 
  2686   Wednesday, September 18, 2024, 13:47 David WangSouth Hot-CellStandard OperationTM3TiC#8Tm3 has been moved from silo to SHC.Tm3 has been moved  from silo to SHC.
The move is smooth. 
  
  2663   Friday, August 16, 2024, 15:28 Aaron TamSouth Hot-CellStandard OperationTM4TiC#7 HP-FEBIAD TiC#7 Target Removed from TM4 TiC#7 Target Removed from TM4. -
Photos attached 
TiC#7 Currently sitting in SHC waiting
 TiC-7_normal_exposure.jfifTiC-7_ettr.jfifTiC-7_Panel.jfifTiC-7_extraction_electrode.jfif 
  2633   Friday, July 05, 2024, 12:50 David WangSouth Hot-CellStandard OperationTM4TiC#7TM4 and TiC#7 target electrical check and HS leak check at SHC after target installation .TM4 and TiC#7 target electrical check and
HS leak check at SHC after target installation
have been done.  all results are good.
  
  2635   Monday, July 08, 2024, 10:40 David WangConditioning StationStandard OperationTM4TiC#7TM4 has been moved from SHC to TCS.TM4 has been moved from SHC to TCS. The
move is successfully. 
  
  2642   Tuesday, July 16, 2024, 13:14 Frank SongITWStandard OperationTM4TiC#7Module Connection TM4 with TiC#7 was connected in ITW,
all TPs are running at full speed.
 TM4_with_new_target_TiC#7_connection_in_ITW_2024-07-16.pdfMicrosoftTeams-image_(65).png 
  2649   Friday, August 09, 2024, 08:11 Frank SongITWStandard OperationTM4TiC#7module disconnection TM4 with spent target TiC#7 (dead)
was disconnected in ITW and ready to move
to TCS.
 TM4_with_spent_TiC#7_disconnection_in_ITW_20240809.pdf 
  2651   Friday, August 09, 2024, 18:18 David WangITWStandard OperationTM4TiC#7Tm4 has been moved from ITW to SMP.Tm4 has been moved from ITW to SMP. the
move is successful. 
  
  2667   Tuesday, August 20, 2024, 11:36 Carla BabcockSouth Hot-CellStandard Operation TiC#7TiC#7 PIETiC#7 failed after two weeks of operations
- measurements in the electrical room indicated
that the negative side of the CHT was broken
  
  2669   Wednesday, August 21, 2024, 10:53 Travis CaveSpent Target VaultStandard Operation TiC#7Spent Target Move TIC#7 was placed in pail #294 and
then moved from the south hot cell to the
spent target vault spot 4B. It was 82.3mSv/hr
 Target_Index_2024-08-21.pdf 
  2442   Friday, May 19, 2023, 09:39 Frank SongSouth Hot-CellStandard OperationTM2TiC#6leak/electrical check TM2 with TiC#6 was checked on SHC,
see pic attached pls.
 TM2_with_TiC#6_leak_and_eletrical_check.png 
  2444   Wednesday, May 24, 2023, 08:34 David WangConditioning StationStandard OperationTM2TiC#6TM2 HS line helium pressure check and gasline fittins leak check.TM2 HS line helium leak check is done.
leak detector base LR 1.8xE-8atm.cc/sec. 
helium pressure 70 psi. 5 minutes test. no
  
  2447   Monday, May 29, 2023, 12:52 Frank SongITWStandard OperationTM2TiC#6Module Connection TM2 with TiC#6 was connected in ITW
(FEBIAD), turbo pumps were started successfully.
 TM2_with_TiC#6_connected_in_ITW_(FEBIAD)_20230529.pdf 
  2449   Tuesday, May 30, 2023, 12:30 Frank SongITWStandard OperationTM2TiC#6gas lines pump out in ITW Faraday Cage Gas lines pumped  gas_lines_pumped_out_to_ITW.JPG 