ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
 |
|
2711
|
Tuesday, November 05, 2024, 11:04 |
Frank Song | South Hot-Cell | Standard Operation | | TiC#9 | electrical check with the spent target | David made electrical check right
after TM4 is moved from ITW to SHC. see attachment
pls. |
|
|
2676
|
Tuesday, September 10, 2024, 12:41 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | TiC#9 | Target TiC#9 HP-SIS installed onto TM4 | September 9, 2024 - Aaron Tam
Water from waterline found
puddled on source-tray and containment box.
|
   |
|
2678
|
Wednesday, September 11, 2024, 07:59 |
David Wang | Conditioning Station | Standard Operation | TM4 | TiC#9 | TM4 has been moved from SHC to TCS. | TM4 has been moved from SHC to TCS. The
move is smooth. |
|
|
2683
|
Tuesday, September 17, 2024, 11:16 |
David Wang | ITW | Standard Operation | TM4 | TiC#9 | TM4 has been moved from TCS to ITW. | TM4 has been moved from TCS to ITW. The
move is smooth. |
|
|
2703
|
Thursday, October 10, 2024, 10:54 |
Aaron Tam | South Hot-Cell | Standard Operation | | TiC#9 | TiC#9 PIE | Post Irradiation Examination
|
32x |
|
2712
|
Wednesday, November 06, 2024, 08:29 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | TiC#9 | Target and Parasitic assemblies removal from TiC#9 | November 5, 2024 - Aaron Tam
TiC#9 HP-SIS removed from TM4
Top left fixing bolt shows |
17x |
|
2714
|
Friday, November 08, 2024, 10:39 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#9 | Spent Target Move | TiC#9 was placed in Pail 299 in spot
8A of the vault and was 92.1mSv/hr when removed
from the south hot cell. See attached pdf |
|
|
2716
|
Friday, November 08, 2024, 10:54 |
Aaron Tam | South Hot-Cell | Standard Operation | | TiC#9 | TiC#9 Pail Loading into Pail#299 | Nov. 8, 2024 - Aaron Tam
Tong cable snapped when attempting
to remove multipin connector bracket |
|
|
2653
|
Friday, August 09, 2024, 19:01 |
David Wang | ITW | Standard Operation | TM3 | TiC#8. | TM3 has been connected in ITW. | TM3 has been connected in ITW. See attachment
for checklist. |
|
|
2707
|
Tuesday, October 15, 2024, 13:44 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#8 and Ta#67 | Spent Target Move | On Friday October 11th TiC#8 and
Ta#67 were place in the spent target vault
in Tray 8. See attached PDF for details. |
|
|
2650
|
Friday, August 09, 2024, 16:15 |
Frank Song | South Hot-Cell | Repair | TM3 | TiC#8 | electrical check/leak check | TM3 with replaced target TiC#8 has
been checked on SHC before moving to ITW.
Pls see attachment |
|
|
2652
|
Friday, August 09, 2024, 18:20 |
David Wang | ITW | Standard Operation | TM3 | TiC#8 | TM3 has been moved from SHC to ITW. | With TiC # 8 installed, TM3 has been moved
from SHc to ITW. The move is smooth. |
|
|
2654
|
Sunday, August 11, 2024, 11:25 |
Carla Babcock | South Hot-Cell | Repair | TM3 | TiC#8 | short on multipin wires to TBHT discovered | With the new TiC#8 target installed on
TM3, there was a ~7kOhm connection between
TGHT/TBHT (A/B/C/D) and HV common. The standard |
|
|
2671
|
Tuesday, August 27, 2024, 13:30 |
Frank Song | ITW | Maintenance | TM3 | TiC#8 | module disconnection | TM3 is disconnected and all water
lines are purged/refilled with 50psi Nitrogen.
Pls see pics attached with. |
|
|
2672
|
Tuesday, September 03, 2024, 11:40 |
David Wang | ITW | Standard Operation | TM3 | TiC#8 | TM3 has been moved from ITW to S-W silo. | TM3 has been moved from ITW to S-W silo.
The move is smooth. |
|
|
2685
|
Wednesday, September 18, 2024, 13:40 |
Aaron Tam | South Hot-Cell | Standard Operation | TM3 | TiC#8 | Target removal | TiC#8 HP FEBIAD removed from TM3
Target sitting in SHC
1 Coil Conductor bolt fell under |
13x |
|
2686
|
Wednesday, September 18, 2024, 13:47 |
David Wang | South Hot-Cell | Standard Operation | TM3 | TiC#8 | Tm3 has been moved from silo to SHC. | Tm3 has been moved from silo to SHC.
The move is smooth. |
|
|
2663
|
Friday, August 16, 2024, 15:28 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | TiC#7 HP-FEBIAD | TiC#7 Target Removed from TM4 | TiC#7 Target Removed from TM4. -
Photos attached
TiC#7 Currently sitting in SHC waiting |
   |
|
2633
|
Friday, July 05, 2024, 12:50 |
David Wang | South Hot-Cell | Standard Operation | TM4 | TiC#7 | TM4 and TiC#7 target electrical check and HS leak check at SHC after target installation . | TM4 and TiC#7 target electrical check and
HS leak check at SHC after target installation
have been done. all results are good. |
|
|
2635
|
Monday, July 08, 2024, 10:40 |
David Wang | Conditioning Station | Standard Operation | TM4 | TiC#7 | TM4 has been moved from SHC to TCS. | TM4 has been moved from SHC to TCS. The
move is successfully. |
|