Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 32 of 141  Not logged in ELOG logo
ID Date Author Category Type Module Target/Numberdown Subject
  2684   Tuesday, September 17, 2024, 13:42 Frank SongITWStandard OperationTM4TiC#9 Module Connection

 TM4 with target TiC#9 is connected in ITW. See attachment.

Attachment 1: TM4_with_TiC#9_connection_in_ITW_2024-09-17.pdf
TM4_with_TiC#9_connection_in_ITW_2024-09-17.pdf TM4_with_TiC#9_connection_in_ITW_2024-09-17.pdf TM4_with_TiC#9_connection_in_ITW_2024-09-17.pdf TM4_with_TiC#9_connection_in_ITW_2024-09-17.pdf
  2710   Tuesday, November 05, 2024, 09:49 Frank SongITWStandard OperationTM4TiC#9 module disconnection

 TM4 with spent target TiC#9 was disconnected in 29-10-2024 and it is being moved from ITW to SHC.

Attachment 1: TM4_with_spent_target_TiC#9_disconnection_in_ITW_20241029.pdf
TM4_with_spent_target_TiC#9_disconnection_in_ITW_20241029.pdf TM4_with_spent_target_TiC#9_disconnection_in_ITW_20241029.pdf TM4_with_spent_target_TiC#9_disconnection_in_ITW_20241029.pdf
  2711   Tuesday, November 05, 2024, 11:04 Frank SongSouth Hot-CellStandard Operation TiC#9 electrical check with the spent target

 David made electrical check right after TM4 is moved from ITW to SHC. see attachment pls.

Attachment 1: Electric_Check_of_TM4_with_spent_TiC#9.pdf
Electric_Check_of_TM4_with_spent_TiC#9.pdf
  2676   Tuesday, September 10, 2024, 12:41 Aaron TamSouth Hot-CellStandard OperationTM4TiC#9Target TiC#9 HP-SIS installed onto TM4

September 9, 2024 - Aaron Tam 

  • Water from waterline found puddled on source-tray and containment box. 
  • Water was wiped up as much as possible, but likely still in containment box 
  • leaving to dry overnight
  • Target inserted into Hotcell with nuts for the parasitic target. 4/4 socket nuts installed on upstream flange, and 3/4 installed on downstream flange

September 10, 2024 - Aaron Tam

  • TiC#9 HP-SIS installed onto TM4 
  • Leak check passed after retightening VCR joint
  • Target Electrode Conductor screws torqued to 130 inch-lbs 
  • Electrical test passed 
  • Containment box cover reinstalled

Photos attached

Attachment 1: 089c5872-091d-484b-9b9c-dda8444b217b.jfif
Attachment 2: 566cae27-5562-4934-b23a-5c99af810900.jfif
Attachment 3: cc853ae8-5896-46f3-9f21-f6ede8c82626.jfif
Attachment 4: ffdf443c-2656-499a-9d0a-01ddef2f954a.jfif
  2678   Wednesday, September 11, 2024, 07:59 David WangConditioning StationStandard OperationTM4TiC#9TM4 has been moved from SHC to TCS.

TM4 has been moved from SHC to TCS. The move is smooth.

  2683   Tuesday, September 17, 2024, 11:16 David WangITWStandard OperationTM4TiC#9TM4 has been moved from TCS to ITW.

TM4 has been moved from TCS to ITW. The move is smooth.

  2703   Thursday, October 10, 2024, 10:54 Aaron TamSouth Hot-CellStandard Operation TiC#9TiC#9 PIE

 Post Irradiation Examination

October 9, 2024 - Aaron Tam 

Goal: Training (First PIE by Aaron), Characterize any anomalies 

Notes:

  • Overall the target looks exceedingly clean with only some discolouration on the copper behind the target tube, and multipin cable insulation. 
Target loosely reassembled
Awaiting pail loading, and move to vault 
Attachment 1: c04ead1c-fd4e-4416-9999-f6af1950d50f.jfif
Attachment 2: ca843d0f-1927-4b57-852c-4937259d8a58.jfif
Attachment 3: a9c1b163-cea6-432f-bdbd-c7e5b92d60c0.jfif
Attachment 4: 4be2ae79-3fd9-4138-a1ca-624fbe071a78.jfif
Attachment 5: 01c73c16-2482-415a-8a12-a0752f844fd3.jfif
Attachment 6: f9611dd8-f8b0-410a-86fa-2d3ab4f50e41.jfif
Attachment 7: 4ebc456a-1839-4b92-b73b-7cc1fcb1cc71.jfif
Attachment 8: 14008918-9bf3-4626-8f77-c0107d01e168.jfif
Attachment 9: 79be1e68-ac54-4841-b0c2-eb917b18574b.jfif
Attachment 10: 1393f383-bdaf-4867-bf74-8ba88eb5dbc3.jfif
Attachment 11: 6128aba4-6c03-4806-8013-5ed1500f97f5.jfif
Attachment 12: 8c83a044-6369-4eea-bcb3-286320fb771b.jfif
Attachment 13: 04558649-7f45-49df-bbd1-a6655033d34f.jfif
Attachment 14: 99e656c9-c211-4a78-b3fd-7fb4775e90d7.jfif
Attachment 15: fd624472-762f-48e2-8951-dff22f4108c1.jfif
Attachment 16: d2115c29-874c-4dd7-a52e-85ff8423df42.jfif
Attachment 17: 9310b964-4db3-4f76-a651-38097c722875.jfif
Attachment 18: 2917fee7-b2db-4575-84b5-b227c895d0f1.jfif
Attachment 19: 55c34370-3ac2-4679-beff-21a36f2a378c.jfif
Attachment 20: 8591d4e7-269f-4641-af7e-afe07915cae6.jfif
Attachment 21: df475908-8b36-4a5d-916e-9ce608d34acc.jfif
Attachment 22: 95ce159e-480a-4231-83f6-1e8270c0cbdc.jfif
Attachment 23: 7e22b28a-30b4-42e2-8568-c80d5cfb209e.jfif
Attachment 24: d47b48ca-320e-43a5-a41c-20af82a38ebd.jfif
Attachment 25: c3eef85f-ee87-47a1-a230-609d5dd9764d.jfif
Attachment 26: d7769940-f939-4686-af3c-21fc49ced03f.jfif
Attachment 27: 2899fd3f-93f4-4a33-8d08-9b9bea6e2ca9.jfif
Attachment 28: 1abe798c-1058-4b80-b4b2-9dae1e94799e.jfif
Attachment 29: 1f780424-0776-400d-b11a-a0e1b3e4c862.jfif
Attachment 30: a983a1bb-5223-4757-88b2-9fb6ae46b5cc.jfif
Attachment 31: fdfa8fec-f1d8-4c29-8df5-03d9c2ac10f6.jfif
Attachment 32: 4cb53268-4ce1-48ab-ab71-7d9d4d908229.jfif
  2712   Wednesday, November 06, 2024, 08:29 Aaron TamSouth Hot-CellStandard OperationTM4TiC#9Target and Parasitic assemblies removal from TiC#9

November 5, 2024 - Aaron Tam

TiC#9 HP-SIS removed from TM4

  • Top left fixing bolt shows signs of heating on it (Comparison photos attached Bolt_profile.jfif  & Bolt_Tops.jfif)
  • Location and orientation of darker bolt (Darker_bolt.jfif)

Parasitic Targets Removed

  • Left target has residue left from ablation 

See photos attached for detail 

Attachment 1: Target_first_look.jfif
Attachment 2: Target_first_look_ETTR.jfif
Attachment 3: Inside_Panel.jfif
Attachment 4: Darker_bolt.jfif
Attachment 5: VCR_and_conductor_bolts_removed.jfif
Attachment 6: Top.jfif
Attachment 7: target_left.jfif
Attachment 8: Right.jfif
Attachment 9: Bottom.jfif
Attachment 10: Parasitic_Target_right.jfif
Attachment 11: Parasitic_Target_right_(2).jfif
Attachment 12: Left_side_without_parasitic.jfif
Attachment 13: Back_of_target_left.jfif
Attachment 14: Back_of_target_right.jfif
Attachment 15: Extraction_electrode.jfif
Attachment 16: Bolt_profile.jfif
Attachment 17: Bolt_Tops.jfif
  2714   Friday, November 08, 2024, 10:39 Travis CaveSpent Target VaultStandard Operation TiC#9Spent Target Move

 TiC#9 was placed in Pail 299 in spot 8A of the vault and was 92.1mSv/hr when removed from the south hot cell. See attached pdf for full vault details.

Attachment 1: Target_Index_2024-11-08.pdf
Target_Index_2024-11-08.pdf
  2716   Friday, November 08, 2024, 10:54 Aaron TamSouth Hot-CellStandard Operation TiC#9TiC#9 Pail Loading into Pail#299

 Nov. 8, 2024 - Aaron Tam 

Tong cable snapped when attempting to remove multipin connector bracket 

Assistance from Chad required for the rest of procedure 

Tic#9 was loaded into Pail#299 

  • Along with fixing and conductor bolts (no other material was loaded)

 

  2653   Friday, August 09, 2024, 19:01 David WangITWStandard OperationTM3TiC#8.TM3 has been connected in ITW.

TM3 has been connected in ITW. See attachment for checklist.

Attachment 1: TM3_TiC#8_connection_in_ITW_checklist.pdf
TM3_TiC#8_connection_in_ITW_checklist.pdf TM3_TiC#8_connection_in_ITW_checklist.pdf TM3_TiC#8_connection_in_ITW_checklist.pdf TM3_TiC#8_connection_in_ITW_checklist.pdf
  2707   Tuesday, October 15, 2024, 13:44 Travis CaveSpent Target VaultStandard Operation TiC#8 and Ta#67Spent Target Move

 On Friday October 11th TiC#8 and Ta#67 were place in the spent target vault in Tray 8. See attached PDF for details. 

Attachment 1: Target_Index_2024-10-15.pdf
Target_Index_2024-10-15.pdf
  2650   Friday, August 09, 2024, 16:15 Frank SongSouth Hot-CellRepairTM3TiC#8electrical check/leak check

 TM3 with replaced target TiC#8 has been checked on SHC before moving to ITW. Pls see attachment

Attachment 1: electrical_and_leak_check_of_TM3_with_new_target_TiC#8_replaced_at_SHC_20240809.pdf
electrical_and_leak_check_of_TM3_with_new_target_TiC#8_replaced_at_SHC_20240809.pdf
  2652   Friday, August 09, 2024, 18:20 David WangITWStandard OperationTM3TiC#8TM3 has been moved from SHC to ITW.

With TiC # 8 installed, TM3 has been moved from SHc to ITW. The move is smooth.

  2654   Sunday, August 11, 2024, 11:25 Carla BabcockSouth Hot-CellRepairTM3TiC#8short on multipin wires to TBHT discovered

With the new TiC#8 target installed on TM3, there was a ~7kOhm connection between TGHT/TBHT (A/B/C/D) and HV common. The standard electrical check on the module showed standard values, so it was assumed the problem was inside the target.

Started removing bolts/water connections one by one to see if any of them had an effect on the measurement. Found that disconnecting the multipin on the target from the mating connector on the source tray resolved the issue. Determined that the only way this could happen is if a spark cut through the insulation covering the multipin wires. Because of the way they are routed, they can touch the water lines and they are definitely touching waterline C, TBHT-. We do not typically check continuity of multipins to all water lines, just to HVC, so did not see this in the standard electrical check. Measurements verified that pin 2-4 was touching water line C, creating a short from TGHT/TBHT to HV common when the multipin connector is attached, since the pins are shorted to HVC inside the connector when they are not used.

Issue was solved by removing the target into the ante room, removing connector 1 all together since it was not used, and removing the grounding on the other pins, leaving only pin 2-2 connected for the anode.

In future we will change the IGLIS wiring so pin 2-4 is not used, and redesign the cable routing so it cannot touch the blocks. For the immediate term, we will add to the electrical check a check of each pin to TBHT/TGHT/COIL.

  2671   Tuesday, August 27, 2024, 13:30 Frank SongITWMaintenanceTM3TiC#8module disconnection

 TM3 is disconnected and all water lines are purged/refilled with 50psi Nitrogen. Pls see pics attached with.

Attachment 1: TM3_with_TiC#8_disconnection_in_ITW_2024-08-27.pdf
TM3_with_TiC#8_disconnection_in_ITW_2024-08-27.pdf TM3_with_TiC#8_disconnection_in_ITW_2024-08-27.pdf TM3_with_TiC#8_disconnection_in_ITW_2024-08-27.pdf
  2672   Tuesday, September 03, 2024, 11:40 David WangITWStandard OperationTM3TiC#8TM3 has been moved from ITW to S-W silo.

TM3 has been moved from ITW to S-W silo. The move is smooth.

  2685   Wednesday, September 18, 2024, 13:40 Aaron TamSouth Hot-CellStandard OperationTM3TiC#8Target removal

 TiC#8 HP FEBIAD removed from TM3

Target sitting in SHC

1 Coil Conductor bolt fell under source tray 

Photo Dump uploaded

Attachment 1: Cover_Outside.jfif
Attachment 2: Cover_Inside.jfif
Attachment 3: Arc_Sign_(as_seen_before).jfif
Attachment 4: Arc_Sign_2_(as_seen_before).jfif
Attachment 5: View_High.jfif
Attachment 6: Bolts_Removed.jfif
Attachment 7: Source_Tray_no_target.jfif
Attachment 8: Taget_Bottom.jfif
Attachment 9: Target_Left.jfif
Attachment 10: Target_Top.jfif
Attachment 11: Target_right.jfif
Attachment 12: Camera_Angle_2.jfif
Attachment 13: Bolt_location_2.jfif
  2686   Wednesday, September 18, 2024, 13:47 David WangSouth Hot-CellStandard OperationTM3TiC#8Tm3 has been moved from silo to SHC.

Tm3 has been moved  from silo to SHC. The move is smooth.

  2663   Friday, August 16, 2024, 15:28 Aaron TamSouth Hot-CellStandard OperationTM4TiC#7 HP-FEBIAD TiC#7 Target Removed from TM4

 TiC#7 Target Removed from TM4. - Photos attached 

TiC#7 Currently sitting in SHC waiting for disposal 

Attachment 1: TiC-7_normal_exposure.jfif
Attachment 2: TiC-7_ettr.jfif
Attachment 3: TiC-7_Panel.jfif
Attachment 4: TiC-7_extraction_electrode.jfif
ELOG V2.9.2-2455