ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
2684
|
Tuesday, September 17, 2024, 13:42 |
Frank Song | ITW | Standard Operation | TM4 | TiC#9 | Module Connection |
TM4 with target TiC#9 is connected in ITW. See attachment. |
Attachment 1: TM4_with_TiC#9_connection_in_ITW_2024-09-17.pdf
|
|
2710
|
Tuesday, November 05, 2024, 09:49 |
Frank Song | ITW | Standard Operation | TM4 | TiC#9 | module disconnection |
TM4 with spent target TiC#9 was disconnected in 29-10-2024 and it is being moved from ITW to SHC. |
Attachment 1: TM4_with_spent_target_TiC#9_disconnection_in_ITW_20241029.pdf
|
|
2711
|
Tuesday, November 05, 2024, 11:04 |
Frank Song | South Hot-Cell | Standard Operation | | TiC#9 | electrical check with the spent target |
David made electrical check right after TM4 is moved from ITW to SHC. see attachment pls. |
Attachment 1: Electric_Check_of_TM4_with_spent_TiC#9.pdf
|
|
2676
|
Tuesday, September 10, 2024, 12:41 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | TiC#9 | Target TiC#9 HP-SIS installed onto TM4 |
September 9, 2024 - Aaron Tam
- Water from waterline found puddled on source-tray and containment box.
- Water was wiped up as much as possible, but likely still in containment box
- leaving to dry overnight
- Target inserted into Hotcell with nuts for the parasitic target. 4/4 socket nuts installed on upstream flange, and 3/4 installed on downstream flange
September 10, 2024 - Aaron Tam
- TiC#9 HP-SIS installed onto TM4
- Leak check passed after retightening VCR joint
- Target Electrode Conductor screws torqued to 130 inch-lbs
- Electrical test passed
- Containment box cover reinstalled
Photos attached |
Attachment 1: 089c5872-091d-484b-9b9c-dda8444b217b.jfif
|
Attachment 2: 566cae27-5562-4934-b23a-5c99af810900.jfif
|
Attachment 3: cc853ae8-5896-46f3-9f21-f6ede8c82626.jfif
|
Attachment 4: ffdf443c-2656-499a-9d0a-01ddef2f954a.jfif
|
2678
|
Wednesday, September 11, 2024, 07:59 |
David Wang | Conditioning Station | Standard Operation | TM4 | TiC#9 | TM4 has been moved from SHC to TCS. |
TM4 has been moved from SHC to TCS. The move is smooth. |
2683
|
Tuesday, September 17, 2024, 11:16 |
David Wang | ITW | Standard Operation | TM4 | TiC#9 | TM4 has been moved from TCS to ITW. |
TM4 has been moved from TCS to ITW. The move is smooth. |
2703
|
Thursday, October 10, 2024, 10:54 |
Aaron Tam | South Hot-Cell | Standard Operation | | TiC#9 | TiC#9 PIE |
Post Irradiation Examination
October 9, 2024 - Aaron Tam
Goal: Training (First PIE by Aaron), Characterize any anomalies
Notes:
- Overall the target looks exceedingly clean with only some discolouration on the copper behind the target tube, and multipin cable insulation.
Target loosely reassembled
Awaiting pail loading, and move to vault |
Attachment 1: c04ead1c-fd4e-4416-9999-f6af1950d50f.jfif
|
Attachment 2: ca843d0f-1927-4b57-852c-4937259d8a58.jfif
|
Attachment 3: a9c1b163-cea6-432f-bdbd-c7e5b92d60c0.jfif
|
Attachment 4: 4be2ae79-3fd9-4138-a1ca-624fbe071a78.jfif
|
Attachment 5: 01c73c16-2482-415a-8a12-a0752f844fd3.jfif
|
Attachment 6: f9611dd8-f8b0-410a-86fa-2d3ab4f50e41.jfif
|
Attachment 7: 4ebc456a-1839-4b92-b73b-7cc1fcb1cc71.jfif
|
Attachment 8: 14008918-9bf3-4626-8f77-c0107d01e168.jfif
|
Attachment 9: 79be1e68-ac54-4841-b0c2-eb917b18574b.jfif
|
Attachment 10: 1393f383-bdaf-4867-bf74-8ba88eb5dbc3.jfif
|
Attachment 11: 6128aba4-6c03-4806-8013-5ed1500f97f5.jfif
|
Attachment 12: 8c83a044-6369-4eea-bcb3-286320fb771b.jfif
|
Attachment 13: 04558649-7f45-49df-bbd1-a6655033d34f.jfif
|
Attachment 14: 99e656c9-c211-4a78-b3fd-7fb4775e90d7.jfif
|
Attachment 15: fd624472-762f-48e2-8951-dff22f4108c1.jfif
|
Attachment 16: d2115c29-874c-4dd7-a52e-85ff8423df42.jfif
|
Attachment 17: 9310b964-4db3-4f76-a651-38097c722875.jfif
|
Attachment 18: 2917fee7-b2db-4575-84b5-b227c895d0f1.jfif
|
Attachment 19: 55c34370-3ac2-4679-beff-21a36f2a378c.jfif
|
Attachment 20: 8591d4e7-269f-4641-af7e-afe07915cae6.jfif
|
Attachment 21: df475908-8b36-4a5d-916e-9ce608d34acc.jfif
|
Attachment 22: 95ce159e-480a-4231-83f6-1e8270c0cbdc.jfif
|
Attachment 23: 7e22b28a-30b4-42e2-8568-c80d5cfb209e.jfif
|
Attachment 24: d47b48ca-320e-43a5-a41c-20af82a38ebd.jfif
|
Attachment 25: c3eef85f-ee87-47a1-a230-609d5dd9764d.jfif
|
Attachment 26: d7769940-f939-4686-af3c-21fc49ced03f.jfif
|
Attachment 27: 2899fd3f-93f4-4a33-8d08-9b9bea6e2ca9.jfif
|
Attachment 28: 1abe798c-1058-4b80-b4b2-9dae1e94799e.jfif
|
Attachment 29: 1f780424-0776-400d-b11a-a0e1b3e4c862.jfif
|
Attachment 30: a983a1bb-5223-4757-88b2-9fb6ae46b5cc.jfif
|
Attachment 31: fdfa8fec-f1d8-4c29-8df5-03d9c2ac10f6.jfif
|
Attachment 32: 4cb53268-4ce1-48ab-ab71-7d9d4d908229.jfif
|
2712
|
Wednesday, November 06, 2024, 08:29 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | TiC#9 | Target and Parasitic assemblies removal from TiC#9 |
November 5, 2024 - Aaron Tam
TiC#9 HP-SIS removed from TM4
- Top left fixing bolt shows signs of heating on it (Comparison photos attached Bolt_profile.jfif & Bolt_Tops.jfif)
- Location and orientation of darker bolt (Darker_bolt.jfif)
Parasitic Targets Removed
- Left target has residue left from ablation
See photos attached for detail |
Attachment 1: Target_first_look.jfif
|
Attachment 2: Target_first_look_ETTR.jfif
|
Attachment 3: Inside_Panel.jfif
|
Attachment 4: Darker_bolt.jfif
|
Attachment 5: VCR_and_conductor_bolts_removed.jfif
|
Attachment 6: Top.jfif
|
Attachment 7: target_left.jfif
|
Attachment 8: Right.jfif
|
Attachment 9: Bottom.jfif
|
Attachment 10: Parasitic_Target_right.jfif
|
Attachment 11: Parasitic_Target_right_(2).jfif
|
Attachment 12: Left_side_without_parasitic.jfif
|
Attachment 13: Back_of_target_left.jfif
|
Attachment 14: Back_of_target_right.jfif
|
Attachment 15: Extraction_electrode.jfif
|
Attachment 16: Bolt_profile.jfif
|
Attachment 17: Bolt_Tops.jfif
|
2714
|
Friday, November 08, 2024, 10:39 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#9 | Spent Target Move |
TiC#9 was placed in Pail 299 in spot 8A of the vault and was 92.1mSv/hr when removed from the south hot cell. See attached pdf for full vault details. |
Attachment 1: Target_Index_2024-11-08.pdf
|
|
2716
|
Friday, November 08, 2024, 10:54 |
Aaron Tam | South Hot-Cell | Standard Operation | | TiC#9 | TiC#9 Pail Loading into Pail#299 |
Nov. 8, 2024 - Aaron Tam
Tong cable snapped when attempting to remove multipin connector bracket
Assistance from Chad required for the rest of procedure
Tic#9 was loaded into Pail#299
- Along with fixing and conductor bolts (no other material was loaded)
|
2653
|
Friday, August 09, 2024, 19:01 |
David Wang | ITW | Standard Operation | TM3 | TiC#8. | TM3 has been connected in ITW. |
TM3 has been connected in ITW. See attachment for checklist. |
Attachment 1: TM3_TiC#8_connection_in_ITW_checklist.pdf
|
|
2707
|
Tuesday, October 15, 2024, 13:44 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#8 and Ta#67 | Spent Target Move |
On Friday October 11th TiC#8 and Ta#67 were place in the spent target vault in Tray 8. See attached PDF for details. |
Attachment 1: Target_Index_2024-10-15.pdf
|
|
2650
|
Friday, August 09, 2024, 16:15 |
Frank Song | South Hot-Cell | Repair | TM3 | TiC#8 | electrical check/leak check |
TM3 with replaced target TiC#8 has been checked on SHC before moving to ITW. Pls see attachment |
Attachment 1: electrical_and_leak_check_of_TM3_with_new_target_TiC#8_replaced_at_SHC_20240809.pdf
|
|
2652
|
Friday, August 09, 2024, 18:20 |
David Wang | ITW | Standard Operation | TM3 | TiC#8 | TM3 has been moved from SHC to ITW. |
With TiC # 8 installed, TM3 has been moved from SHc to ITW. The move is smooth. |
2654
|
Sunday, August 11, 2024, 11:25 |
Carla Babcock | South Hot-Cell | Repair | TM3 | TiC#8 | short on multipin wires to TBHT discovered |
With the new TiC#8 target installed on TM3, there was a ~7kOhm connection between TGHT/TBHT (A/B/C/D) and HV common. The standard electrical check on the module showed standard values, so it was assumed the problem was inside the target.
Started removing bolts/water connections one by one to see if any of them had an effect on the measurement. Found that disconnecting the multipin on the target from the mating connector on the source tray resolved the issue. Determined that the only way this could happen is if a spark cut through the insulation covering the multipin wires. Because of the way they are routed, they can touch the water lines and they are definitely touching waterline C, TBHT-. We do not typically check continuity of multipins to all water lines, just to HVC, so did not see this in the standard electrical check. Measurements verified that pin 2-4 was touching water line C, creating a short from TGHT/TBHT to HV common when the multipin connector is attached, since the pins are shorted to HVC inside the connector when they are not used.
Issue was solved by removing the target into the ante room, removing connector 1 all together since it was not used, and removing the grounding on the other pins, leaving only pin 2-2 connected for the anode.
In future we will change the IGLIS wiring so pin 2-4 is not used, and redesign the cable routing so it cannot touch the blocks. For the immediate term, we will add to the electrical check a check of each pin to TBHT/TGHT/COIL. |
2671
|
Tuesday, August 27, 2024, 13:30 |
Frank Song | ITW | Maintenance | TM3 | TiC#8 | module disconnection |
TM3 is disconnected and all water lines are purged/refilled with 50psi Nitrogen. Pls see pics attached with. |
Attachment 1: TM3_with_TiC#8_disconnection_in_ITW_2024-08-27.pdf
|
|
2672
|
Tuesday, September 03, 2024, 11:40 |
David Wang | ITW | Standard Operation | TM3 | TiC#8 | TM3 has been moved from ITW to S-W silo. |
TM3 has been moved from ITW to S-W silo. The move is smooth. |
2685
|
Wednesday, September 18, 2024, 13:40 |
Aaron Tam | South Hot-Cell | Standard Operation | TM3 | TiC#8 | Target removal |
TiC#8 HP FEBIAD removed from TM3
Target sitting in SHC
1 Coil Conductor bolt fell under source tray
Photo Dump uploaded |
Attachment 1: Cover_Outside.jfif
|
Attachment 2: Cover_Inside.jfif
|
Attachment 3: Arc_Sign_(as_seen_before).jfif
|
Attachment 4: Arc_Sign_2_(as_seen_before).jfif
|
Attachment 5: View_High.jfif
|
Attachment 6: Bolts_Removed.jfif
|
Attachment 7: Source_Tray_no_target.jfif
|
Attachment 8: Taget_Bottom.jfif
|
Attachment 9: Target_Left.jfif
|
Attachment 10: Target_Top.jfif
|
Attachment 11: Target_right.jfif
|
Attachment 12: Camera_Angle_2.jfif
|
Attachment 13: Bolt_location_2.jfif
|
2686
|
Wednesday, September 18, 2024, 13:47 |
David Wang | South Hot-Cell | Standard Operation | TM3 | TiC#8 | Tm3 has been moved from silo to SHC. |
Tm3 has been moved from silo to SHC. The move is smooth. |
2663
|
Friday, August 16, 2024, 15:28 |
Aaron Tam | South Hot-Cell | Standard Operation | TM4 | TiC#7 HP-FEBIAD | TiC#7 Target Removed from TM4 |
TiC#7 Target Removed from TM4. - Photos attached
TiC#7 Currently sitting in SHC waiting for disposal |
Attachment 1: TiC-7_normal_exposure.jfif
|
Attachment 2: TiC-7_ettr.jfif
|
Attachment 3: TiC-7_Panel.jfif
|
Attachment 4: TiC-7_extraction_electrode.jfif
|