Monday, April 20, 2015, 10:12, Anders Mjos, Conditioning Station, Standard Operation, TM1, UC#12, Conditioning UC#12
|
Monday, April 20, 2015, 09:35: Started cooling water circulation
HV cover did not fit due to interference with the air sampling valve. Target Hall will have to be locked out for conditioning to proceed. WP
I2015-04-20-2 |
Tuesday, April 21, 2015, 17:14, Isaac Earle, South Hot-Cell, Standard Operation, TM1, UC#12, UC#12 Installed in TM1 
|
On Friday April 17th, UC#12 target was installed in TM1. One of the copper water lines was bent slightly as the target was lifted into the module
which caused ~15 minute delay due to difficulty getting the VCR nut threads to engage. Other than this the install went smoothly.
During replacement of the containment box panel two of the threaded holes were found to be stripped. One on the top at the center, the other |
Tuesday, April 28, 2015, 11:14, Travis Cave, ITW, Standard Operation, TM1, UC#12, Module move
|
TM#1 with UC#12 has been moved from the conditioning station to the west target station. |
Tuesday, June 30, 2015, 11:27, Travis Cave, ITW, Standard Operation, TM1, UC#12, Module moved
|
TM#1 with UC#12 has been moved from the west station to the south hot cell. |
Thursday, July 02, 2015, 11:51, Travis Cave, Spent Target Vault, Standard Operation, , UC#12, Spent target moved
|
UC#12 has been moved from the south hot cell and placed into storage. It is in pail #125 and in spot 1C of the vault it had a reading of 25.1mSv/hr upon
removal from the south hot cell. See PDF for vault details. |
Wednesday, November 19, 2014, 09:18, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#11, Electrical check
|
TM#4 with UC#11 electrical check done. See attached PDF for the results. |
Thursday, November 20, 2014, 11:49, Travis Cave, ITE, Standard Operation, TM4, UC#11, module move
|
TM#4 with UCx#11has been moved from the conditioning station to the east target station. |
Monday, March 16, 2015, 09:41, Travis Cave, ITE, Standard Operation, TM4, UC#11, Module move
|
TM#4 with UC#11 moved from the east target station to the south hot cell. |
Tuesday, March 17, 2015, 10:33, Travis Cave, Spent Target Vault, Standard Operation, , UC#11, Spent Target Move
|
The spent UC#11 has benn moved from the south hot cell to the spent target vault. See attached PDF for details. |
Tuesday, September 23, 2014, 13:31, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#10, Ta#44, Electrical check 
|
Electrical checks of TM#4 with UC#10 post beam and Ta#44 before beam see attached PDF for details. |
Monday, August 11, 2014, 10:34, Travis Cave, Conditioning Station, Standard Operation, TM4, UC#10, module move
|
TM#4 with UC#10 has been moved from the conditioning station to the east target station. |
Monday, August 11, 2014, 10:38, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#10, Electrical check
|
Electrical check of TM#4 with UC#10 from thursday. |
Tuesday, September 23, 2014, 10:50, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#10, module move
|
TM#4 with UC#10 has been moved from the east target station to the south hot cell. |
Friday, September 26, 2014, 10:56, Travis Cave, Spent Target Vault, Standard Operation, , UC#10, Spent target move
|
UC#10 has been moved from the south hot cell to the spent target vault. It was placed in Pail #119 and in slot 8B. For further details see attached PDF. |
Tuesday, October 22, 2019, 11:19, Adam Newsome, South Hot-Cell, Standard Operation, TM4, UC# 28, TM4 Move
|
TM4 with UC# 28 target has been moved from ITW to the South Hot Cell. Shield plug installed in ITW. |
Tuesday, July 31, 2012, 12:50, David Wang, South Hot-Cell, Standard Operation, TM1, UC x, TM1 heat shield circuit leak check with UC x target
|
Chad and i did a leak check on TM1heat shield with UCx target on.The circuit are pumped down to the bottom leak rate and base pressure is 3xE-3
torr on the leak detector. There are two VCR caps on heat shield circuit. Chad sprayed helium on both of them ( tested individually,2 seconds
every time ) . The test repeated 1 time.There is no response on leak detector during 45 seconds waiting time on both time.Chad flushed helium around the |
Thursday, November 28, 2024, 16:13, Aaron Tam, South Hot-Cell, Standard Operation, , TiC#9 Parasitics, TiC#9 Parasitics Leak Check and removal from hotcell    
|
November 27th, 2024 - Aaron Tam with Farran & David
Parasitic Assembly Leak Check (Aaron, Farran, David)
-Note that the furthest upstream (right of the target) parasitic top cap screws had been loosened and retightened in |
Tuesday, September 10, 2024, 12:41, Frank Song, South Hot-Cell, Standard Operation, TM4, TiC#9 , electrical check/leak check
|
TM4 with new target TiC#9 Surface installed in SHC was leak/electric checked before moving to TCS. See attached pic pls. |
Tuesday, September 17, 2024, 13:42, Frank Song, ITW, Standard Operation, TM4, TiC#9 , Module Connection
|
TM4 with target TiC#9 is connected in ITW. See attachment. |
Tuesday, November 05, 2024, 09:49, Frank Song, ITW, Standard Operation, TM4, TiC#9 , module disconnection
|
TM4 with spent target TiC#9 was disconnected in 29-10-2024 and it is being moved from ITW to SHC. |
|