ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
1194
|
Wednesday, April 06, 2016, 09:37 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#14 | module moved | TM#4 with UC#14 has been moved from the
east target station to the south hot cell. |
|
1204
|
Monday, April 11, 2016, 10:07 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#14 | Spent Target move | The spent UC#14 target has been moved into
the ISAC spent target vault. See the attached
PDF for the details. |
|
1014
|
Monday, July 27, 2015, 13:38 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#13 | Electrical Check | Electrical check of TM#4 with UC#13 at
the south hot cell. See PDF for details. |
|
1015
|
Monday, July 27, 2015, 14:37 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#13 | Module moved | TM#4 has been moved from the east target
station (morning with SiC#31), and moved
to the conditioning station from the south |
|
1021
|
Tuesday, July 28, 2015, 14:31 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#13 | Electrical Check | TM#4 with UC#13 electrical check at the
conditioning station under vacuum. See attached
PDF. |
|
1025
|
Wednesday, July 29, 2015, 08:59 |
Travis Cave | ITE | Standard Operation | TM4 | UC#13 | Module moved | TM#4 with UC#13 has been moved from the
conditioning station to the east target station. |
|
1072
|
Tuesday, September 22, 2015, 11:12 |
Travis Cave | ITE | Standard Operation | TM4 | UC#13 | Module moved | TM#4 with UC#13 has been moved from the
east target station to the south hot cell. |
|
1073
|
Tuesday, September 22, 2015, 11:35 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#13 | Electrical Check | TM#4 with UC#13 post beam electrical check.
Also and electrical check was done without
the target on. |
|
1083
|
Friday, September 25, 2015, 08:21 |
Travis Cave | South Hot-Cell | Standard Operation | | UC#13 | Spent Target move | The spent UC#13 target has been moved from
the south hot cell to the ISAC spent target
vault. It was placed pail #128 and in tray |
|
888
|
Friday, April 17, 2015, 11:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#12 | Electrical check | Electrical check of TM#1 with UCx#12 attached.
See attached PDF for details. |
|
889
|
Friday, April 17, 2015, 14:04 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UC#12 | Module move | TM#1 with UCx#12 has been moved from the
south hot cell to the conditioning station. |
|
891
|
Monday, April 20, 2015, 10:12 |
Anders Mjos | Conditioning Station | Standard Operation | TM1 | UC#12 | Conditioning UC#12 | Monday, April 20, 2015, 09:35: Started
cooling water circulation
HV cover did not fit due to interference |
|
894
|
Tuesday, April 21, 2015, 17:14 |
Isaac Earle | South Hot-Cell | Standard Operation | TM1 | UC#12 | UC#12 Installed in TM1 | On Friday April 17th, UC#12 target was
installed in TM1. One of the copper
water lines was bent slightly as the target |
|
904
|
Tuesday, April 28, 2015, 11:14 |
Travis Cave | ITW | Standard Operation | TM1 | UC#12 | Module move | TM#1 with UC#12 has been moved from the
conditioning station to the west target station. |
|
969
|
Tuesday, June 30, 2015, 11:27 |
Travis Cave | ITW | Standard Operation | TM1 | UC#12 | Module moved | TM#1 with UC#12 has been moved from the
west station to the south hot cell. |
|
975
|
Thursday, July 02, 2015, 11:51 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#12 | Spent target moved | UC#12 has been moved from the south hot
cell and placed into storage. It is in pail
#125 and in spot 1C of the vault it had a |
|
794
|
Wednesday, November 19, 2014, 09:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#11 | Electrical check | TM#4 with UC#11 electrical check done.
See attached PDF for the results. |
|
796
|
Thursday, November 20, 2014, 11:49 |
Travis Cave | ITE | Standard Operation | TM4 | UC#11 | module move | TM#4 with UCx#11has been moved from the
conditioning station to the east target station. |
|
862
|
Monday, March 16, 2015, 09:41 |
Travis Cave | ITE | Standard Operation | TM4 | UC#11 | Module move | TM#4 with UC#11 moved from the east target
station to the south hot cell. |
|
864
|
Tuesday, March 17, 2015, 10:33 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#11 | Spent Target Move | The spent UC#11 has benn moved from the
south hot cell to the spent target vault.
See attached PDF for details. |
|