951
|
Thursday, June 18, 2015, 08:03 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Optics Tray Transfer | The TM2 optics tray has been transferred
from the source tray to the transfer fixture
in preparation for installation of the source |
|
|
952
|
Friday, June 19, 2015, 09:37 |
Isaac Earle | South Hot-Cell | Repair | TM2 | | TM2 Source Tray Installation - June 18, 2015 | The following work was done on
June 18 2015:
- Finished cleaning and polishing |
|
|
955
|
Friday, June 19, 2015, 11:57 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Source Tray Progress | Window waterline has been successfully
connected using 1 1/2 inch long non-blunt
start 1/4-28 bolts. |
|
|
956
|
Friday, June 19, 2015, 13:00 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Source Tray Install Status | Left manipulator now broken. Master side
however, so repair can take place Monday
or Tuesday. |
|
|
957
|
Tuesday, June 23, 2015, 10:55 |
chad fisher | South Hot-Cell | Repair | | | Left Manipulator Repair | The master wrist/tong cable has been replaced
on the left manipulator. Everything appears
to function well so far. |
|
|
958
|
Tuesday, June 23, 2015, 14:19 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Water Block Jigs Removed | Both halves of the water block jigs have
been removed and the module is now ready
for base vacuum leak and electrical checks. |
|
|
960
|
Wednesday, June 24, 2015, 10:16 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Vacuum Leak Check | The following circuits have been vacuum
leak checked and have not registered any
leaks: |
|
|
961
|
Wednesday, June 24, 2015, 13:49 |
David Wang | South Hot-Cell | Repair | TM2 | | TM2 new source tray vacuum leak check. | All water blocks seals and joints have
been leak checked. No leak has been found
on any of them. See attachment |
|
|
963
|
Friday, June 26, 2015, 09:44 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Retrofit Status | On June 25th the following work was completed:
Optics tray was installed into TM2.
The lower fastener on the vertical cable |
|
|
964
|
Friday, June 26, 2015, 09:45 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Status | Containment box window waterlines have
been connected and leak checked and new containment
box cover installed. |
|
|
968
|
Tuesday, June 30, 2015, 09:47 |
chad fisher | South Hot-Cell | Repair | | | manipulator repair | The right hand manipulator has been repaired.
It took 43 minutes and I received ~ 0.56
mSv |
|
|
970
|
Tuesday, June 30, 2015, 12:37 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#12 | UCx #12 Removal | UCx#12 has been removed from TM1 and placed
in a pail with argon.
Right leg (B) of target is clearly |
|
|
974
|
Thursday, July 02, 2015, 11:49 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Module moved | TM#1 has been moved from the south hot
cell to the south west silo. |
|
|
976
|
Friday, July 03, 2015, 09:11 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | Module moved | TM#2 has been moved from the conditioning
station to the south hot cell. |
|
|
979
|
Friday, July 03, 2015, 11:33 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Coil Leak Progress | First thing this morning the hot cell was
"cleaned up" in preparation for
the return of TM2 for attempted verification |
|
|
980
|
Friday, July 03, 2015, 13:29 |
chad fisher | South Hot-Cell | Repair | TM2 | | Hot Cell/ Module Fields | Field measured at block "R" through
tool port with pole monitor is 6.65 mSv/H.
There are three air hoods and two |
|
|
983
|
Wednesday, July 08, 2015, 12:18 |
chad fisher | South Hot-Cell | Repair | TM2 | | R U Coil line Removal | R U coil line removal started at 11:30.
Water block jig installed and coil line disconnected
from module. |
|
|
984
|
Wednesday, July 08, 2015, 14:05 |
David Wang | South Hot-Cell | Repair | TM2 | | leak check coil line(R,U) on TM2 at SHC | Chad and I leak checked coil line(R,U)
on TM2 at SHC yesterday. The leak detector
was pumped down to 0.0Xe-9 atm.cc/sec before |
|
|
985
|
Wednesday, July 08, 2015, 14:24 |
David Wang | South Hot-Cell | Repair | TM2 | | TM2 pressure bubble test on RU water blocks. | July-06, 2015. Chad , Grant and I did the
bubble test on R,U water blocks. We suspected
the leak on the R,U circuit is from C seals |
|
|
986
|
Wednesday, July 08, 2015, 14:48 |
chad fisher | South Hot-Cell | Repair | TM2 | | TM2 Status | Water block jig has been removed. Stuck
source tray side water block jig component
has been removed. An attempt was made to |
|