IDdown Date Author Category Type Module Target/Number Subject
  2234   Thursday, July 15, 2021, 09:02 Adam NewsomeSpent Target VaultStandard Operation  Emergency Close Mechanism Test

The emergency close mechanism for the Storage Vault door was tested by Adam Newsome and Travis Cave. The door was opened to its fully open limit, then closed with the emergency system.

The test was successful.

  2233   Thursday, July 08, 2021, 11:45 David WangSouth Hot-CellStandard OperationTM4Ta#62TM4 Ta#62 leak check and lectrical check result at SHC and TCS.

At SHC: HS line no leak . electrical check result is fine. At TCS: helium pressurized HS line to 70psi, 3 minutes. LD  leak rate 0.0xE-9atm.cc/sec , no response.

Attachment 1: Ta#62_Tm4_elecrical_check_and_leak_check_result_at_SHC.pdf
Ta#62_Tm4_elecrical_check_and_leak_check_result_at_SHC.pdf
  2232   Thursday, July 08, 2021, 11:36 David WangConditioning StationStandard OperationTM4Ta#62Remotely remove TM4(Ta#62) from SHC to TCS.

Remotely remove TM4 (ta# 62) from SHC to TCS.  The moving is smooth.

  2231   Wednesday, July 07, 2021, 11:59 Adam NewsomeSafe Module ParkingMaintenance  Annual Electrical and Mechanical Inspection

An annual electrical and mechanical inspection was performed on the SMP today by Adam Newsome, Dan McDonald, and Jason Zhang as per Work Permit I2021-07-07-3. The following items were checked:

  • Check condition of wiring for physical/radiation/UV damage
    • OK, no signs of significant damage
  • Check for cable tray debris or damage
    • There were multiple shards of plastic in the cable tray - they were removed and disposed of
  • Check inside control panel: components and wiring, labeling
    • Labeling intact, components in good condition
    • One COM wire for the relay array was loose - it was tightened
  • Verify camera views
    • This was not inspected but has recently been checked, and is checked prior to remote operation
  • Check connectors for damage
    • All connectors OK
  • Check pendant for damage and verify labeling intact
    • Pendant OK
  • Lid open/close test
    • Lid was opened and close multiple times - smooth operation, no concern
    • Lid close logic was checked - OK
  • Vessel rotation and limit switch check
    • Both CW and CCW limits were checked, functioning
    • No concern on rotation - chain drive, rotary limit switch, and cable reel all functioning normally
  • Lubricate chains
    • Done
  • Inspect tensioners
    • Done - OK
  • Tighten fasteners
    • Done - OK
    • Note: some concern over socket head screws in slotted parts - they should have washers. Not a critical issue but worth checking into.
  • Visual inspection
    • All OK

Overall the inspection was successful.

Attachment 1: Capture.PNG
Capture.PNG
Attachment 2: PXL_20210707_162143876.jpg
PXL_20210707_162143876.jpg
Attachment 3: PXL_20210707_162918257.jpg
PXL_20210707_162918257.jpg
  2230   Wednesday, June 30, 2021, 14:11 Matthew GareauNorth Hot-CellStandard Operation  North Hot Cell Commemorative Opening

 Yesterday a bottle of Cava (sparkling wine) was place, opened, and poured in the NHC, to commemorate its new operational status.

The NHC is now a functional hot cell and is ready for many years of target exchanges to come.

  2229   Tuesday, June 22, 2021, 15:35 David WangITWStandard OperationTM2UCX33#TM2 has been connected it ITW.

TM2 has been connected it ITW.  All turbo pumps are started.

  2228   Friday, June 11, 2021, 10:36 David WangConditioning StationStandard OperationTM2UCX33#TM2 leak check at TCS

Leak checked TM2 service cap at TCS. helium pressure checked containment box window and HS cooling lines.  No leak on service cap and waterlines.

  2227   Thursday, June 10, 2021, 14:54 David WangNorth Hot-CellStandard OperationTM2UCX33 UCX 33 on TM2 electical check at NHC.

TM2 UCX33# electrical check and leak check results. See attachment.

Attachment 1: UCX33_TM2_electrical_check.pdf
UCX33_TM2_electrical_check.pdf UCX33_TM2_electrical_check.pdf
  2226   Wednesday, June 09, 2021, 10:48 David WangSouth Hot-CellStandard OperationTM2 TM2 containment box leak check.

Chad installed containment box back to TM2 yesterday. We leak checked VCR joints on window line.    No leak.

  2225   Wednesday, June 09, 2021, 10:15 David WangITE/ITWStandard OperationTM4UCX33. ITE water signal interlock check.

Annual ITE water signal interlock check is done.  HS, TAR, TUBE, MSP, EE, COIL 1, containment box window, HVC1, HVC2, 2A window, 2A  shielding plug, 2A dump, 2A collimator, and 2A tank water signal interlock are checked.   Everything is working properly.  

2021-06-22. Annual ITW water signal interlock check is done,  HS, TAR, MSP,  EE, COIL1 , containment box window, HVC1 , HVC2, 2A window, 2A shielding plug, 2A dump, 2A collimator, and 2A tank water signal interlock are checked. Everything works fine.

  2224   Wednesday, June 09, 2021, 09:16 Travis CaveNorth Hot-CellStandard OperationTM2no targetModule move

 TM#2 has been moved from the SHC to the NHC.

  2223   Thursday, June 03, 2021, 08:33 David WangSouth Hot-CellStandard OperationTM4UCX32# P2NP2N UCX 32 on TM4 electical check and leak check at SHC.

Both electrical check and leak check (HS and Window lines)results are good.   See attachments

Correction: It should be UCx#32 P2N instead of UCx33# in check list attached . UCx#33 is on TM2 in ITW

Attachment 1: P2N_UCX33#_target_electrical_chek_at_SHC_2021_0601.pdf
P2N_UCX33#_target_electrical_chek_at_SHC_2021_0601.pdf P2N_UCX33#_target_electrical_chek_at_SHC_2021_0601.pdf P2N_UCX33#_target_electrical_chek_at_SHC_2021_0601.pdf P2N_UCX33#_target_electrical_chek_at_SHC_2021_0601.pdf P2N_UCX33#_target_electrical_chek_at_SHC_2021_0601.pdf P2N_UCX33#_target_electrical_chek_at_SHC_2021_0601.pdf
  2222   Thursday, June 03, 2021, 08:20 David WangSouth Hot-CellStandard OperationTM2 Remotely remove TM2 from silo to shc

Remotely removed Tm2 from silo to SHC. The moving is smooth.

  2221   Thursday, June 03, 2021, 08:19 David WangITERepairTM4UCX33Replaced ITE TP4

Replaced  ITE TP4 due to failure start. The new pump works fine.

  2220   Monday, May 31, 2021, 11:28 David WangITEStandard OperationTM4 Remotely remove TM4 from silo to shc

Remotely remove tm4 from silo to shc. The moving is smooth.

  2219   Tuesday, May 25, 2021, 16:20 Anders MjosConditioning StationMaintenance  TK2 refilled

Tank refilled from 12 in to 25 in using the new valve.

  2218   Tuesday, May 25, 2021, 16:20 Anders MjosConditioning StationMaintenance  Chiller maintenance

A contractor on site today for chiller maintenance. CP2 and CP3 circuit is leaking and shall not be used. CP1 can still be used. The contractor will contact Plant Group with a quote for repair and upgrades.

  2217   Tuesday, May 25, 2021, 15:59 Matthew GareauNorth Hot-CellDevelopment  Removed boot from left hot manipulator

 Myself and Isaac removed the boot from the left hot manipulator.

- opened the hatch in the TH to get access to the top of the boot

- released the latch on the boot and loosened the boot from above

- closed TH hatch

- with the right manipulator we were able to detach the rest of boot

This test proved that we can remove a boot from the manipulator without having to enter into the hotcell.

Due to the physical restraints that the boot causes for the operator, we have decided to not reattach the boot with its current design.

A new design will be investigated to allow the boot to be fixed without twisting, which is the source of the problems.

 

Attachment 1: IMG_20210525_134723.jpg
IMG_20210525_134723.jpg
Attachment 2: IMG_20210525_134727.jpg
IMG_20210525_134727.jpg
Attachment 3: MicrosoftTeams-image.png
MicrosoftTeams-image.png
Attachment 4: MicrosoftTeams-image_(4)1.png
MicrosoftTeams-image_(4)1.png
Attachment 5: IMG_20210525_141602.jpg
IMG_20210525_141602.jpg
Attachment 6: IMG_20210525_141851.jpg
IMG_20210525_141851.jpg
Attachment 7: IMG_20210525_142144.jpg
IMG_20210525_142144.jpg
  2216   Friday, May 14, 2021, 11:29 David WangSpent Target VaultStandard Operation  Repack of 4 spent targets.

Repack of 4 spent targets in TH and SHC.  SiC#37 to new pail249#. SiC#36 to new pail 250#. Nb#8 to new pail 247#, SiC#33 to new pail 248#.  They are all in mini storage. Also, UCx 31 are transferred to mini storage.  There are 5 spent targets in mini storage now.  

2021-05-20: 5 spent targets have been loaded into F308's. We transferred two more spent targets into mini storage this morning for next week loading.

  2215   Monday, May 03, 2021, 15:14 Frank SongITEMaintenance  High voltage test in ITE

 Anders and I prepared ITE high voltage test in April 30 ( Friday morning), The MAA is locked for this.