Wednesday, April 06, 2016, 09:37, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#14, module moved
|
TM#4 with UC#14 has been moved from the east target station to the south hot cell. |
Monday, April 11, 2016, 10:07, Travis Cave, Spent Target Vault, Standard Operation, , UC#14, Spent Target move
|
The spent UC#14 target has been moved into the ISAC spent target vault. See the attached PDF for the details. |
Monday, July 27, 2015, 13:38, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#13, Electrical Check
|
Electrical check of TM#4 with UC#13 at the south hot cell. See PDF for details. |
Monday, July 27, 2015, 14:37, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#13, Module moved
|
TM#4 has been moved from the east target station (morning with SiC#31), and moved to the conditioning station from the south hot cell with UC#13 on it. |
Tuesday, July 28, 2015, 14:31, Travis Cave, Conditioning Station, Standard Operation, TM4, UC#13, Electrical Check
|
TM#4 with UC#13 electrical check at the conditioning station under vacuum. See attached PDF. |
Wednesday, July 29, 2015, 08:59, Travis Cave, ITE, Standard Operation, TM4, UC#13, Module moved
|
TM#4 with UC#13 has been moved from the conditioning station to the east target station. |
Tuesday, September 22, 2015, 11:12, Travis Cave, ITE, Standard Operation, TM4, UC#13, Module moved
|
TM#4 with UC#13 has been moved from the east target station to the south hot cell. |
Tuesday, September 22, 2015, 11:35, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#13, Electrical Check
|
TM#4 with UC#13 post beam electrical check. Also and electrical check was done without the target on. |
Friday, September 25, 2015, 08:21, Travis Cave, South Hot-Cell, Standard Operation, , UC#13, Spent Target move
|
The spent UC#13 target has been moved from the south hot cell to the ISAC spent target vault. It was placed pail #128 and in tray spot 1A. It was 21.5mSv/hr
upon removal from the hot cell. See attached PDF for details. |
Friday, April 17, 2015, 11:56, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#12, Electrical check
|
Electrical check of TM#1 with UCx#12 attached. See attached PDF for details. |
Friday, April 17, 2015, 14:04, Travis Cave, South Hot-Cell, Standard Operation, TM1, UC#12, Module move
|
TM#1 with UCx#12 has been moved from the south hot cell to the conditioning station. |
Monday, April 20, 2015, 10:12, Anders Mjos, Conditioning Station, Standard Operation, TM1, UC#12, Conditioning UC#12
|
Monday, April 20, 2015, 09:35: Started cooling water circulation
HV cover did not fit due to interference with the air sampling valve. Target Hall will have to be locked out for conditioning to proceed. WP
I2015-04-20-2 |
Tuesday, April 21, 2015, 17:14, Isaac Earle, South Hot-Cell, Standard Operation, TM1, UC#12, UC#12 Installed in TM1
|
On Friday April 17th, UC#12 target was installed in TM1. One of the copper water lines was bent slightly as the target was lifted into the module
which caused ~15 minute delay due to difficulty getting the VCR nut threads to engage. Other than this the install went smoothly.
During replacement of the containment box panel two of the threaded holes were found to be stripped. One on the top at the center, the other |
Tuesday, April 28, 2015, 11:14, Travis Cave, ITW, Standard Operation, TM1, UC#12, Module move
|
TM#1 with UC#12 has been moved from the conditioning station to the west target station. |
Tuesday, June 30, 2015, 11:27, Travis Cave, ITW, Standard Operation, TM1, UC#12, Module moved
|
TM#1 with UC#12 has been moved from the west station to the south hot cell. |
Thursday, July 02, 2015, 11:51, Travis Cave, Spent Target Vault, Standard Operation, , UC#12, Spent target moved
|
UC#12 has been moved from the south hot cell and placed into storage. It is in pail #125 and in spot 1C of the vault it had a reading of 25.1mSv/hr upon
removal from the south hot cell. See PDF for vault details. |
Wednesday, November 19, 2014, 09:18, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#11, Electrical check
|
TM#4 with UC#11 electrical check done. See attached PDF for the results. |
Thursday, November 20, 2014, 11:49, Travis Cave, ITE, Standard Operation, TM4, UC#11, module move
|
TM#4 with UCx#11has been moved from the conditioning station to the east target station. |
Monday, March 16, 2015, 09:41, Travis Cave, ITE, Standard Operation, TM4, UC#11, Module move
|
TM#4 with UC#11 moved from the east target station to the south hot cell. |
Tuesday, March 17, 2015, 10:33, Travis Cave, Spent Target Vault, Standard Operation, , UC#11, Spent Target Move
|
The spent UC#11 has benn moved from the south hot cell to the spent target vault. See attached PDF for details. |
|