Entry  Friday, September 07, 2012, 09:47, Travis Cave, Spent Target Vault, Standard Operation, , UO#3, Spent target move Vault_Storage_September_6_2012.pdf

The spent UO#3 was moved from the south hot cell to the storage vault. It was in pail 98 and placed in spot 1A of the vault, the field measured upon removal from the hot cell were 42mSv/hr. See attached PDF for vault details.

Entry  Friday, September 14, 2012, 10:45, Travis Cave, Spent Target Vault, Standard Operation, , UCx#4, Spent target move Vault_Storage_September_14_2012.pdf

UCx#4 has been moved from the south hot cell to the spent target vault. The target was placed in pail #99 and now resides in spot 3C of the vault. It measured 55.3mSv/hr at ~1m from the hot cell. See attached PDF for further spent target vault details.

Entry  Wednesday, October 24, 2012, 11:53, Travis Cave, Spent Target Vault, Standard Operation, , NiO#1, Spent target move Vault_Storage_October_24_2012.pdf

The NiO #1 spent target was placed into storage today. It is in pail number 01 (101 on Vault Status page) and located in slot 4A of the vault. It was 35.5 mSv/hr upon removal from the south hot cell. See attached PDF for vault details.

Entry  Friday, November 02, 2012, 08:45, maicodallavalle, Spent Target Vault, Maintenance, , , F-308 

The F-308 have been cleaned and serviced. There were three F-308's that came back with some contamination.#13, #15 and #19 were found to have contamination. They were decontaminated. All of the loose contamination was removed. There is still some fixed contamination. The levels of contamination are low enough to still be used for shipping spent targets. They have been moved to the north hot cell area and are ready for to be filled with spent targets. 

Entry  Friday, November 02, 2012, 13:18, Travis Cave, Spent Target Vault, Standard Operation, , , spent target assay Vault_Storage_November_2_2012.pdf

This week six targets and the two source trays were assayed and surveyed from the storage vault. see attached PDF for details.

Entry  Friday, November 09, 2012, 14:35, Travis Cave, Spent Target Vault, Standard Operation, , Nb#7, Spent target move Vault_Storage_November_9_2012.pdf

Nb#7 was moved from the south hot cell to the target storage vault. The target was placed in pail #103 in slot 6A of the vault and had a reading of 178 mSv/hr upon removal from the south hot cell. See attached PDF for full vault details.

Entry  Wednesday, November 14, 2012, 11:51, Travis Cave, Spent Target Vault, Standard Operation, , , Moving the spent targets to mini storage. Vault_Storage_November_14_2012.pdfMini_Vault_Storage_November_14_2012.pdf

Five spent targets have been moved from the storage vault to the mini storage vault. The five targets are as follows: SiC #25, Ta #34, Ta #32, Ta #31, Nb #4. See the attached PDFs for full details.

Entry  Wednesday, November 21, 2012, 09:36, Travis Cave, Spent Target Vault, Standard Operation, , , Spent target move 

On Nov 20th the 5 targets in mini storage have been moved to the F-308s, those F-308s have since been moved to the hot cell ante room. They will sit there until Monday.

Entry  Thursday, December 06, 2012, 08:57, Travis Cave, Spent Target Vault, Standard Operation, , UCx#5, Spent target move Vault_Storage_December_6_2012.pdf

UCx #5 has been moved from the south hot cell to the storage vault. It is in Pail 102, in spot 2A of the vault and had a field of 32.6mSv/hr upon extraction from the south hot cell. See attached PDF for vault details.

Entry  Tuesday, January 15, 2013, 14:37, Travis Cave, Spent Target Vault, Standard Operation, , TiC#3, Spent target move Vault_Storage_January_15_2013.pdf

TiC #3 was moved from the south hot cell in to the vault storage today, it was placed in slot 4B and was in pail #104, it had a reading of 98.7mSv/hr upon removal from the south hot cell. See attached PDF for vault details.

Entry  Wednesday, April 24, 2013, 10:36, maicodallavalle, Spent Target Vault, Maintenance, , , F-308 

The F-308's have been serviced and are ready to be filled. All inspection records are stored  in docushare.

https://documents.triumf.ca/docushare/dsweb/View/Collection-1085
Entry  Friday, May 31, 2013, 11:19, Travis Cave, Spent Target Vault, Standard Operation, , SiC#28 (RFQ Target), Spent target move Vault_Storage_May_31_2013.pdf

Spent target SiC#28 (RFQ Target) has been moved from the south hot to the storage vault. The target was placed in pail #105 in spot 2C of  the spent target vault. The target had a field of 24.8mSv/hr at about a meter upon removal from the south hot cell. See attached PDF for the status of the vault. It currently only has six free spots left.

Entry  Thursday, June 20, 2013, 13:47, Travis Cave, Spent Target Vault, Standard Operation, , , Spent Target Assay Vault_Storage_June_20_2013.pdf

Ten targets have been assayed or had field measurements(they were too hot to ship but were assayed the last time an assay was done) done on them  over the past two days. Of those that have been assayed we have total of ten shippable targets. See the attached PDF for the latest details of the storage vault.

Entry  Monday, July 29, 2013, 14:32, Travis Cave, Spent Target Vault, Standard Operation, , Ta#40, Spent target move Vault_Storage_July_29_2013.pdf

Spent target Ta#40 has been placed into storage. The target was placed in pail #107 and was put into slot 5A of the vault. It had a field of 224mSv/hr upon removal from the south hot cell. See attached PDF for more details.

Entry  Wednesday, July 31, 2013, 11:13, Travis Cave, Spent Target Vault, Standard Operation, , , Spent target move Vault_Storage_July_31_2013.pdfMini_Vault_Storage_July_31_2013.pdf

Five spent targets have been removed from the storage vault and placed into the mini storage. The target placed into the mini storage are UO#3, UC#'s  3,4,5 and SIC#23. See attached PDFs for vault details.

Entry  Wednesday, August 07, 2013, 06:47, maicodallavalle, Spent Target Vault, Maintenance, , , F-308 

All the F-308's have been torqued up  and the locks installed. Ready to be moved.

Entry  Tuesday, October 08, 2013, 13:11, Travis Cave, Spent Target Vault, Standard Operation, , SiC#29, Spent target move Vault_Storage_October_8_2013.pdf

SiC#29 has been moved to the spent target vault. The target was placed in Pail #109 and placed into slot 2B it was 24.7mS/hr upon removal from the south hot cell. See attached PDF of the vault details.

Entry  Thursday, October 24, 2013, 11:31, Travis Cave, Spent Target Vault, Standard Operation, , UC#7, Spent target move Vault_Storage_October_24_2013.pdf

UC #7 has been moved from the south hot cell to the spent target vault, it was placed in pail #110 and put in slot 8B of the vault, it was 22.6mSv/hr upon removal from the hot cell. See attached PDF for vault details.

Entry  Friday, November 22, 2013, 10:29, Travis Cave, Spent Target Vault, Standard Operation, , NiO#2, Spent target move Vault_Storage_November_22_2013.pdf

NiO#2 has been moved from the south hot cell into spent target storage. It was placed in pail 111 in slot 3C of the storage vault. It was 76.4mSv/hr upon removal from the south hot cell.

Entry  Monday, December 09, 2013, 13:15, Travis Cave, Spent Target Vault, Standard Operation, , Ta#41, Spent target move Vault_Storage_December_9_2013.pdf

The spent Ta#41 target has been moved from the south hot cell to the spent target storage vault. It is an unnumbered pail (should be pail 112) and placed in spot 7A of the vault it had a reading of 536mSv/hr upon removal from the south hot cell. See attached PDF for vault details.