Entry  Tuesday, November 29, 2016, 14:50, Travis Cave, ITW, Standard Operation, TM2, UC#18, module moved 

TM#2 with UC#18 has been moved to ITW from the conditioning station.

Entry  Tuesday, August 02, 2016, 14:52, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#17, module moved 

TM#4 with UC#17 is now in the conditioning station.

Entry  Tuesday, August 02, 2016, 15:22, David Wang, Conditioning Station, Standard Operation, TM4, UC#17, TM4 with new target has been connected at TCS 

It is being pumped now at TCS.

Entry  Wednesday, August 03, 2016, 08:08, Anders Mjos, Conditioning Station, Standard Operation, TM4, UC#17, Conditioning UC#17 UC#17.docxTCS-2016-08-03_UC#17.rgaTCS-2016-08-08_UC#17.rga

Wednesday, August 03, 2016, 08:08: RGA on

Wednesday, August 03, 2016, 11:25: Configured EE to be connected to EE PS (not grounded)

Wednesday, August 03, 2016, 11:25: PS on

Wednesday, August 03, 2016, 11:32: BIAS / EL / EE to 20 / 10 / 1 kV

Ramping set to 40 / 20 A at 1 / 0.5 A/min. Good / bad vacuum at 2.0 / 2.2 E-6 T (IG2). Vacuum too high.

Wednesday, August 03, 2016, 13:02: BIAS / EL / EE to 30 / 15 / 1.5 kV

Wednesday, August 03, 2016, 15:59: BIAS / EL / EE to 35 / 17.5 / 1.5 kV. Some conditioning from 30 kV


Chiller staging stopped working around midnight. TGHT and TBHT ramped down by ISAC operators.

Thursday, August 04, 2016, 08:14: Ramping target to 50 / 25 A

Thursday, August 04, 2016, 08:22: Cycled power on chiller to reset alarm. Repeated again 5 min later

Thursday, August 04, 2016, 08:37: BIAS / EL / EE to 30 / 15 / 1.5 kV

Thursday, August 04, 2016, 09:36: Continue ramping to 100 / 50 A

Thursday, August 04, 2016, 11:32: Continue ramping to 120 / 60 A

Thursday, August 04, 2016, 14:50: ramping down


Friday, August 05, 2016, 07:09: Started cooling system

Friday, August 05, 2016, 07:56: Started ramping to 100 / 50 A

Friday, August 05, 2016, 14:27: TGHT / TBHT at 253 / 126 A.

Friday, August 05, 2016, 14:30: Ramping down at 2 / 1 A/min

Friday, August 05, 2016, 15:27: BIAS / EL / EE off


Monday, August 08, 2016, 08:15: Continue ramping. : BIAS / EL / EE to 30 / 15 / 1.5 kV

Monday, August 08, 2016, 14:36 TGHT / TBHT at 260 / 130 A. Ramping down at 2 / 1 A/min

Monday, August 08, 2016, 15:30: BIAS / EL off. EE remains at 1 kV.

Monday, August 08, 2016, 22:56: RGA off. Water system fault. Running CP1 manually

Monday, August 08, 2016, 22:57: EE off.

Monday, August 08, 2016, 22:58: Vacuum off

Entry  Wednesday, August 03, 2016, 09:45, David Wang, Conditioning Station, Standard Operation, TM4, UC#17, Helium pressure test on TM4 HS line at TCS  

Helium pressure test on TM4 HS line at TCS  is done.Leak detector 0.0X E-9atm.cc/sec.  5minutes, 70psi helium.    No response on LD.

Entry  Wednesday, August 03, 2016, 10:02, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#17, Electrical Check TM4_elechk_UC17_SHC.PDF

The result of yesterdays electrical check on TM#4 with UC#17.

Entry  Tuesday, August 09, 2016, 10:05, Travis Cave, ITE, Standard Operation, TM4, UC#17, module moved 

TM#4 with UC#17 is now in the east target station.

Entry  Wednesday, August 10, 2016, 11:30, David Wang, ITE, Standard Operation, TM4, UC#17, TM4 has been connected at ITE 

Dan and I connected TM4 in ITE yesterday. It is pumping down at ITE now. Everything is fine so far.

Entry  Monday, August 15, 2016, 10:08, David Wang, ITE, Standard Operation, TM4, UC#17, 5 Shielding blocks have been transferred from ITW to ITE. 

Dan and I transferred 5 shielding blocks from ITW to ITE. The ITE is configured to take proton beam.

Entry  Tuesday, September 20, 2016, 10:32, Travis Cave, South Hot-Cell, Standard Operation, TM4, UC#17, module moved 

TM#4 has been moved from the east target station to the south hot cell

Entry  Monday, September 26, 2016, 13:59, Travis Cave, Spent Target Vault, Standard Operation, , UC#17, Spent Target move Vault_Storage_September_26_2016.pdf

The spent UC#17 has been moved from the south hot cell to the spent target vault. See the attached pdf for details.

Entry  Tuesday, June 07, 2016, 17:11, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 UCx16 electrical check and leak check at SHC UCX_16_electrical_test.pdfelectrical_check._TM4_UCx16_at_TCS..pdf

Chad and I finished the TM4 UCx6 electrical check and leak check at SHC. Leak check result on HS line is good. There is a dead short between "Z" repellor and HS during the first time electrical check. The dead short disappeared after re- installation of UCx 14 target onto TM4. See attachment

 Anders and I did another electrical check on TM4 at TCS under vacuum. See attachment 2

Entry  Tuesday, June 07, 2016, 17:14, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 with UCx16 target has been moved from SHC to TCS. 

Bill and Yasmine did the move remotely this afternoon. The move is successful.

Entry  Tuesday, June 07, 2016, 18:17, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 and TCS turbo pumps are started. 

TM4 and TCS vacuum system are connected.   Turbo pumps are started.  Everything is fine so far.

Entry  Wednesday, June 08, 2016, 08:25, Anders Mjos, Conditioning Station, Standard Operation, TM4, UC#16, Conditioning UC#16 UC#16.docxTCS-2016-06-08_UC#16.rga

 Wednesday, June 08, 2016, 08:15: RGA on


Thursday, June 09, 2016, 09:00: Water on by David. TK2 level dropped by about 1.5 in.

Thursday, June 09, 2016, 10:30: BIAS / EL / EE to 10 / 5 / 0.5 kV

Thursday, June 09, 2016, 10:44: Started heater ramp. TGHT / TBHT to 40 / 20 A at 1 / 0.5 A/min. IG2 vacuum limits 2E-6 / 3E-6 T

Thursday, June 09, 2016, 11:59: Continue ramping to 100 / 50 A.


Friday, June 10, 2016, 08:04: Continue ramping to 300 / 150 A IG2 vacuum limits 1.9E-6 / 2.3E-6 T

Friday, June 10, 2016, 21:32: Stopped ramping at 275 A /  138.5 A


Saturday, June 11, 2016, 11:40: Ramped to 281 A / 140 A


Sunday, June 12, 2016, 08:31: Ramped to 290 A / 145 A

Sunday, June 12, 2016, 08:49: Ramped to 300 A / 150 A


Monday, June 13, 2016, 08:06: Continue ramping to 400 / 200 A

Monday, June 13, 2016, 17:00: TGHT / TBHT at 390 A / 195 A.

Monday, June 13, 2016, 17:17: BIAS / EL / EE to 30 / 15 / 1.5 kV

Monday, June 13, 2016, 18:02: Ramping down TGHT / TBHT at 2 / 1 A/min

Monday, June 13, 2016, 21:39: Source off. Water, RGA, vacuum off.

Entry  Thursday, June 09, 2016, 08:37, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 with UCx16 helium pressure test at TCS TM4_withUCx16_helium_pressure_test_at_TCS.pdf

I did a helium pressure test on TM4 at TCS with UCX16 target installed on the module. No leak has been found on all using water lines in TM4. See attachment for detail.

Entry  Thursday, June 09, 2016, 09:44, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 has been connected at TCS 

It is ready for HV conditioning/ heating. 

Entry  Tuesday, June 14, 2016, 08:04, David Wang, Conditioning Station, Standard Operation, TM4, UC#16, TM4 has been disconnected at TCS 

The TM4 and TCS are vented with argon. 

Entry  Tuesday, June 14, 2016, 10:51, Travis Cave, ITE, Standard Operation, TM4, UC#16, module moved 

TM#4 with UC#16 has been moved from the conditioning station to the east target station.

Entry  Tuesday, August 02, 2016, 11:02, Travis Cave, ITE, Standard Operation, TM4, UC#16, module moved 

TM#4 with UC#16 has been moved from the east station to the south hot cell. The shield plug was also install remotely once it was hooked up due to alphas.