Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 26 of 138  Not logged in ELOG logo
  ID Date Authordown Category Type Module Target/Number Subject
  603   Thursday, February 20, 2014, 09:45 Travis CaveConditioning StationStandard OperationTM2no targetmodule move

TM#2 has been moved from the conditioning station to the south hot cell.

  607   Monday, February 24, 2014, 13:52 Travis CaveSouth Hot-CellStandard OperationTM2no targetmodule move

TM#2 moved from the south hot cell to the conditioning station.

  610   Tuesday, March 04, 2014, 10:19 Travis CaveITEStandard OperationTM3no targetmodule move

TM#3 has been moved from the silo to the east target station.

  611   Wednesday, March 05, 2014, 10:07 Travis CaveConditioning StationStandard OperationTM2no targetmodule move

TM#2 with no target or source tray has been moved from the conditioning station to the north east silo. TM#1 with no target has been moved into the conditioning station.

  617   Monday, March 10, 2014, 09:39 Travis CaveITEStandard OperationTM3no targetmodule move

TM#3 with no target has been moved from the east target station to the south west silo.

  618   Tuesday, March 11, 2014, 10:47 Travis CaveITERepair  entrance module move

ITE entrance module has been moved from the east station to the south east silo.

  619   Wednesday, March 12, 2014, 09:45 Travis CaveITWStandard OperationTM4no targetmodule move

TM#4 has been moved from the north west silo to the west target station.

  627   Thursday, March 20, 2014, 08:19 Travis CaveConditioning StationStandard OperationTM1no targetmodule move

TM#1 with no target moved from the conditioning station to north west silo.

  629   Monday, March 24, 2014, 12:01 Travis CaveITWStandard OperationTM4no targetmodule move

TM#4 has been moved from the west target station to the south hot cell.

  631   Tuesday, March 25, 2014, 13:29 Travis CaveSouth Hot-CellStandard OperationTM4Ta#42Electrical check

TM#4 was checked electrically with and without target on it, see attached PDFs for details.

Attachment 1: TM#4_notarget_electest_SHC.PDF
TM#4_notarget_electest_SHC.PDF
Attachment 2: TM#4_Ta42surf_electest_SHC.PDF
TM#4_Ta42surf_electest_SHC.PDF
  633   Wednesday, March 26, 2014, 08:36 Travis CaveConditioning StationStandard OperationTM4Ta#42module move

TM#4 with Ta#42 has been moved from the south hot cell to the conditioning station.

  634   Thursday, March 27, 2014, 10:47 Travis CaveConditioning StationStandard OperationTM4Ta#42Electrical check

TM#4 with Ta#42 in the conditioning station under vacuum electrical check.

Attachment 1: TM#4_Ta42surf_electest_CS.PDF
TM#4_Ta42surf_electest_CS.PDF
  636   Wednesday, April 02, 2014, 09:14 Travis CaveITWStandard OperationTM4Ta#42module move

TM#4 with Ta#42 has been moved to the west target station.

  637   Friday, April 04, 2014, 14:16 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule move

TM#3 with no target has been moved from the south west silo to the south hot cell.

  640   Monday, April 07, 2014, 10:48 Travis CaveSouth Hot-CellStandard OperationTM3no targetElectrical check

TM#3 electrical check at the south hot  cell with no target to give us a base line and show that things are ok with the module for the start of the running year.

Attachment 1: TM#3_elec_test_no_target.PDF
TM#3_elec_test_no_target.PDF
  641   Monday, April 07, 2014, 11:49 Travis CaveSouth Hot-CellStandard OperationTM3TiC#4Electrical check

Electrical test of TM#3 with TiC#4 attached. See PDF.

Attachment 1: TM#3_elec_test_TiC#4_surf.PDF
TM#3_elec_test_TiC#4_surf.PDF
  643   Tuesday, April 08, 2014, 09:05 Travis CaveSouth Hot-CellStandard OperationTM3TiC#4module move

TM#3 with TiC#4 has been moved from the south hot cell to the conditioning station.

  648   Monday, April 14, 2014, 11:57 Travis CaveITEStandard Operation  entrance module move

The East Entrance module has been moved from the south west silo to the east target station. The move went well.

  650   Tuesday, April 15, 2014, 08:53 Travis CaveITEStandard OperationTM3TiC#4module move

TM#3 with TiC#4 has been moved from the conditioning station to the east target station.

  653   Wednesday, April 30, 2014, 12:03 Travis CaveSpent Target VaultStandard Operation 2A3 windowWindow now in vault

The 2A3 window now has a lid, and lift yolk on it and it has been installed in the spent target vault in spot 2A. The lid is a normal unmodified and has no sealant on it.

Attachment 1: Vault_Storage_April_30_2014.pdf
Vault_Storage_April_30_2014.pdf Vault_Storage_April_30_2014.pdf Vault_Storage_April_30_2014.pdf Vault_Storage_April_30_2014.pdf
ELOG V2.9.2-2455