ID |
Date |
Author |
Category |
Type |
Module |
Target/Number |
Subject |
Text |
|
725
|
Thursday, August 07, 2014, 10:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move | TM#4 has been moved from the south west
silo to the south hot cell. |
|
726
|
Thursday, August 07, 2014, 13:58 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx #10 | Leak check on TM4 HS water line with new UCX target. | Isaac and I leak checked TM4 HS line with
new UCX target. The leak detector base LR
0.0xE-9 atm.cc/sec, base pressure0.0xE-4torr. |
|
730
|
Monday, August 11, 2014, 10:38 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#10 | Electrical check | Electrical check of TM#4 with UC#10 from
thursday. |
|
736
|
Wednesday, September 03, 2014, 13:55 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#43 | module move | TM#1 with Ta#43 has been moved from the
ITW to the south hot cell. |
|
737
|
Wednesday, September 03, 2014, 13:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ZrC#6 | Electrical check | TM#1 with ZrC#6 electrical check at the
south hot cell. The conductance of target
on circuit A-D is a little lower then normal. |
|
739
|
Thursday, September 04, 2014, 09:47 |
David Wang | South Hot-Cell | Standard Operation | TM1 | | Leak check on TM1 HS water line with new target installed | Chad and I leak checked the TM1 HS
line with new target installed. Base leak
rate 0.0xe-9 atm.cc/sec. No any response |
|
750
|
Tuesday, September 23, 2014, 10:50 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#10 | module move | TM#4 with UC#10 has been moved from the
east target station to the south hot cell. |
|
752
|
Tuesday, September 23, 2014, 12:24 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#44 | Ucx10 removed Ta#44 installed | Ucx#10 has been removed from TM4 and placed
in a pail with argon.
Ta#44 has been installed onto TM4 |
|
753
|
Tuesday, September 23, 2014, 13:31 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#10, Ta#44 | Electrical check | Electrical checks of TM#4 with UC#10 post
beam and Ta#44 before beam see attached PDF
for details. |
|
755
|
Wednesday, September 24, 2014, 15:03 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta#44 | Leak check on TM4 HS water line with new Ta#44 target. at SHC | This morning Chad and I leak checked TM4
HS line with new Ta#44 target installed.
I calibrated LD before the check. Before |
|
760
|
Tuesday, October 14, 2014, 11:51 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ZrC#6 | module move | TM#1 with ZrC#6 has been moved from ITW
to the south hot cell. |
|
761
|
Tuesday, October 14, 2014, 11:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ZrC#6 | Electrical check | TM#1 with ZrC#6 post beam electrical check
see attached pdf for results. |
|
763
|
Tuesday, October 14, 2014, 13:31 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Electrical check | Electrical check of TM#1 with no target
attached at the south hot cell see attached
PDF for details. |
|
765
|
Wednesday, October 15, 2014, 12:55 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move | TM#1 with no target has been moved from
the south hot cell to the south west silo. |
|
770
|
Monday, October 20, 2014, 14:18 |
chad fisher | South Hot-Cell | Repair | | | Manipulator Repair | The broken cable on the east manipulator
has been replaced.
The handle will need some adjustments |
|
771
|
Tuesday, October 21, 2014, 08:55 |
chad fisher | South Hot-Cell | Repair | | | Manipulator repair | The east manipulator handle has been adjusted
and is ready for use. |
|
775
|
Monday, November 03, 2014, 10:27 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move | TM#1 has been moved from the south west
silo to the south hot cell. |
|
776
|
Monday, November 03, 2014, 11:16 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | ThO#1 | ThO#1 Installed | ThO#1 has been installed onto TM1 and is
ready for leak and electrical checking. High
current fasteners torqued to 130 in lbs. |
|
777
|
Monday, November 03, 2014, 13:47 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ThO#1 | Electrical check | TM#1 with ThO#1 electrical check see attatched
PDF for details. |
|
778
|
Tuesday, November 04, 2014, 11:05 |
David Wang | South Hot-Cell | Standard Operation | TM1 | ThO#1 | Leak check on TM1 HS water line withThO#1 installed. | Chad and I leak checked HS line on TM1
with ThO#1 target installed. The LD pumped
down to base leak rate 0.0xE-9 atm.cc/sec, |
|