713
|
Thursday, July 24, 2014, 09:10 |
Travis Cave | South Hot-Cell | Standard Operation | TM2 | no target | module move |
TM#2 has been moved to the hot cell from the north east silo. |
714
|
Thursday, July 24, 2014, 18:21 |
Grant Minor | South Hot-Cell | Repair | TM2 | No target / no source tray | Leak check on TM2 ionizer tube cooling lines C and D - module side |
Target Ionizer tube cooling lines "C" and "D" in Target Module 2 were both leak checked at the Hot Cell. The lines were both blanked-off.
Bill Paley was present with David Wang in the Target Hall, operating the leak detector. Grant Minor and Anders Mjos were present with Chad Fisher at the Hot Cell.
The "D" circuit was already blanked off with a copper blank containing silver brazed stainless steel inserts and indium plated inconel c-seals.
The "C" circuit was already blanked off with an aluminum blank and rubber o-rings.
The cooling lines are indicated in the attached screencapture from ITA6021 Rev .14, and are also labelled in the attached photo.
The "D" circuit was checked first, starting at around 12pm.
1. The helium flow was tested by blowing dust on the work table.
2. The base leak rate on the Varian leak detector was confirmed in the "D" circuit to be stable at 10^-9 atm cc / sec and the pressure was 10^-4 Torr.
3. Each soldered joint on the "D" circuit was sprayed with a 2-second blast of helium - no response at the Varian.
4. The joint between the module-half of the water block and the copper blank-off was sprayed with a 2-second burst - no response.
5. A general area flood of helium sprayed for 10 seconds was applied all around both the "D" and "C" blocks - no response.
It was concluded that the "D" circuit had passed this leak check. The "C" circuit was checked next. The detector was changed to the "C" circuit and the circuit was pumped down. At around 2pm the leak check resumed.
6. The base leak rate on the Varian leak detector was confirmed in the "C" circuit to be stable at 10^-9 atm cc / sec and the pressure was 10^-4 Torr.
7. The solder joint area on the "C" circuit was sprayed with an 8-second burst of helium - no response.
8. The joint between the two halves of the water blocks was sprayed with a 6-second helium burst - no response.
It was concluded that the "C" circuit had passed this leak check.
The electrical continuity of the "C" and "D" circuits were confirmed in the Target Hall at the service cap, and in the module at the Hot Cell, to double check that the correct lines has been pumped and leak checked - this was OK.
The ionizer tube heater lines appear to be leak tight at the Hot Cell.
|
720
|
Thursday, July 31, 2014, 08:08 |
chad fisher | South Hot-Cell | Standard Operation | TM3 | SiC#30 | SiC#30 Removed and inpect |
SiC#30 has been removed from TM3. A quick exam of TM3 source tray did not yield any obvious signs of damage.
9 pin connector on the target showed the usual sparking/arcing marks.
Heat shield has been removed from the target. Inside of heat shield has some unusual marks on it and quite a lot of black deposits.
|
723
|
Wednesday, August 06, 2014, 11:11 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module move |
TM#3 with no target has been moved to the northwest silo for storage. |
724
|
Wednesday, August 06, 2014, 11:12 |
Travis Cave | South Hot-Cell | Standard Operation | | SiC#30 | Spent target move |
SiC#30 in pail #117 has been move to the spent target vault and placed in spot 2C. See attached PDF for details. |
725
|
Thursday, August 07, 2014, 10:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move |
TM#4 has been moved from the south west silo to the south hot cell. |
726
|
Thursday, August 07, 2014, 13:58 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UCx #10 | Leak check on TM4 HS water line with new UCX target. |
Isaac and I leak checked TM4 HS line with new UCX target. The leak detector base LR 0.0xE-9 atm.cc/sec, base pressure0.0xE-4torr. Isaac sprayed helium on both VCR connections(5 seconds each) and flushed helium around the target for 6 seconds. No response on leak detector. |
730
|
Monday, August 11, 2014, 10:38 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#10 | Electrical check |
Electrical check of TM#4 with UC#10 from thursday. |
736
|
Wednesday, September 03, 2014, 13:55 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#43 | module move |
TM#1 with Ta#43 has been moved from the ITW to the south hot cell. |
737
|
Wednesday, September 03, 2014, 13:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ZrC#6 | Electrical check |
TM#1 with ZrC#6 electrical check at the south hot cell. The conductance of target on circuit A-D is a little lower then normal. |
739
|
Thursday, September 04, 2014, 09:47 |
David Wang | South Hot-Cell | Standard Operation | TM1 | | Leak check on TM1 HS water line with new target installed |
Chad and I leak checked the TM1 HS line with new target installed. Base leak rate 0.0xe-9 atm.cc/sec. No any response has been found on LD. The line will be pressurized at CS with helium tomorrow. |
750
|
Tuesday, September 23, 2014, 10:50 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#10 | module move |
TM#4 with UC#10 has been moved from the east target station to the south hot cell. |
752
|
Tuesday, September 23, 2014, 12:24 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | Ta#44 | Ucx10 removed Ta#44 installed |
Ucx#10 has been removed from TM4 and placed in a pail with argon.
Ta#44 has been installed onto TM4 and target heater bolts torqed to 130 in.lbs. |
753
|
Tuesday, September 23, 2014, 13:31 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#10, Ta#44 | Electrical check |
Electrical checks of TM#4 with UC#10 post beam and Ta#44 before beam see attached PDF for details. |
755
|
Wednesday, September 24, 2014, 15:03 |
David Wang | South Hot-Cell | Standard Operation | TM4 | Ta#44 | Leak check on TM4 HS water line with new Ta#44 target. at SHC |
This morning Chad and I leak checked TM4 HS line with new Ta#44 target installed. I calibrated LD before the check. Before check, the LD base LR 0.0xE-9 atm.cc/sec, base LP 0.0xE-4 torr. Chad sprayed helium on both VCR fittings and did a flush around the target. There is no any response had been found on LD,. The line is good on leak tight. with spray method. No helium pressure test on the HS line at CS since TM4 was moved back to ITE directly. |
760
|
Tuesday, October 14, 2014, 11:51 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ZrC#6 | module move |
TM#1 with ZrC#6 has been moved from ITW to the south hot cell. |
761
|
Tuesday, October 14, 2014, 11:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | ZrC#6 | Electrical check |
TM#1 with ZrC#6 post beam electrical check see attached pdf for results. |
763
|
Tuesday, October 14, 2014, 13:31 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | Electrical check |
Electrical check of TM#1 with no target attached at the south hot cell see attached PDF for details. |
765
|
Wednesday, October 15, 2014, 12:55 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move |
TM#1 with no target has been moved from the south hot cell to the south west silo. |
770
|
Monday, October 20, 2014, 14:18 |
chad fisher | South Hot-Cell | Repair | | | Manipulator Repair |
The broken cable on the east manipulator has been replaced.
The handle will need some adjustments which will take place first thing tomorrow. |