Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 25 of 138  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
ID Date Author Category Type Module Target/Numberdown Subject
  2015   Monday, October 28, 2019, 11:50 Travis CaveSpent Target VaultStandard Operation UC#28Spent Target Move

 UC#28 has been moved from the south hot cell to spent target storage. The target was placed in pail number 219 and placed in spot 1C of the vault, it was 12.6mSv/hr upon removal from the south hot cell. Also the spent target vault is now full and can not currently accept anymore targets.

Attachment 1: Target_Index_2019-10-28.pdf
Target_Index_2019-10-28.pdf Target_Index_2019-10-28.pdf
  2004   Tuesday, October 08, 2019, 09:02 Travis CaveSouth Hot-CellStandard OperationTM4UC#27 and UC#28Electrical Check

 Results of the electrical check of TM4 without target and with UC27 and 28

Attachment 1: TM_elec_chk_with_UC27_shc_post_beem_Oct-04-2019.pdf
TM_elec_chk_with_UC27_shc_post_beem_Oct-04-2019.pdf
Attachment 2: TM4_elec_chk__with_UC28_shc_Oct-04-2019.pdf
TM4_elec_chk__with_UC28_shc_Oct-04-2019.pdf
Attachment 3: TM4_elec_chk_no_tgt_shc_Oct-04-2019.pdf
TM4_elec_chk_no_tgt_shc_Oct-04-2019.pdf
  1978   Thursday, September 05, 2019, 14:26 Travis CaveSouth Hot-CellStandard OperationTM4UC#27Electrical Check

 The results of the electrical check of TM#4 with UC#27 attached to it.

Attachment 1: TM4_elec_chk_with_UC27_at_SHC_Sept_5_2019.pdf
TM4_elec_chk_with_UC27_at_SHC_Sept_5_2019.pdf
  1979   Thursday, September 05, 2019, 14:26 Travis CaveSouth Hot-CellStandard OperationTM4UC#27Electrical Check

 The results of the electrical check of TM#4 with UC#27 attached to it.

Attachment 1: TM4_elec_chk_with_UC27_at_SHC_Sept_5_2019.pdf
TM4_elec_chk_with_UC27_at_SHC_Sept_5_2019.pdf
  1982   Tuesday, September 10, 2019, 10:10 Adam NewsomeITWStandard OperationTM4UC#27TM4 Move

TM4 has been moved from the Conditioning Station to ITW with UC#27 target.

  2005   Wednesday, October 09, 2019, 13:28 Travis CaveSpent Target VaultStandard Operation UC#27Spent Target Move

 The spent target in the south hot cell has been moved to the spent target vault. It was placed in spot 1B of the vault in pail number 218. See attached for vault details.

Attachment 1: Target_Index_2019-10-09.pdf
Target_Index_2019-10-09.pdf Target_Index_2019-10-09.pdf
  1832   Wednesday, November 28, 2018, 13:38 Travis CaveConditioning StationStandard OperationTM4UC#26Module move

 TM#4 with UC#26 has been moved from the south hot cell to the conditioning station.

  1835   Tuesday, December 04, 2018, 10:26 Travis CaveITEStandard OperationTM4UC#26Module move

 TM#4 with UC#26 has been moved from the conditioning station to the east target station.

  1840   Tuesday, December 11, 2018, 14:35 Anders MjosITEStandard OperationTM4UC#26Block move

Blocks were moved from ITW to ITE by Frank and David. ITE water flow to dump was re-opened (ITW remains open). A dose badge was installed in the operation storage area. Dose rates were measured to ~10 mSv/h at 1pm. Beam went off approximately 8:30am (with a short period of 2uA ending at 11am).

  1911   Tuesday, April 30, 2019, 08:59 Travis CaveSouth Hot-CellStandard OperationTM4UC#26Module move

 TM#4 with UC#26 has been moved from ITE to the south hot cell.

  1912   Tuesday, April 30, 2019, 11:19 Travis CaveSouth Hot-CellStandard OperationTM4UC#26Electrical Check

 Electrical check of TM#4 with UC#26 post beam at the south hot cell. See attached.

Attachment 1: Elec_CHk_UC26_SHC_post_beam.pdf
Elec_CHk_UC26_SHC_post_beam.pdf
  1913   Wednesday, May 01, 2019, 07:49 chad fisherSouth Hot-CellStandard OperationTM4UC#26UC#26 removal

UC#26 has been removed from TM4.

Attachment 1: 20190501_072940[1].jpg
20190501_072940[1].jpg
  1916   Thursday, May 02, 2019, 09:37 Travis CaveSpent Target VaultStandard Operation UC#26Spent Target Move

 The spent UC#26 target was moved from the south hot cell to the spent target vault. It was place in pail #209 and put in spot 1A in the vault and was 2.42mSv/hr upon removal from the south hot cell.

Attachment 1: Target_Index_2019-05-02.pdf
Target_Index_2019-05-02.pdf Target_Index_2019-05-02.pdf
  1813   Wednesday, October 31, 2018, 14:20 Travis CaveConditioning StationStandard OperationTM2UC#25Module move
TM#2 with UC#25 has been moved from the south hot cell to the conditioning station.
  1817   Monday, November 05, 2018, 14:27 Anders MjosConditioning StationStandard OperationTM2UC#25Target module disconnected

Frank and Anders disconnected the water and electrical connections this afternoon after the target was conditioned over the weekend. The heater ramping program ran with the wrong gauge selected, causing the vacuum to go higher than planned. The module will be moved to ITW tomorrow.

  1818   Tuesday, November 06, 2018, 10:59 Travis CaveITWStandard OperationTM2UC#25Module move

 TM#2 with UC#25 has been moved from the conditioning station to the west target station.

  1819   Wednesday, November 07, 2018, 09:50 Anders MjosITWStandard OperationTM2UC#25TM2 connected in ITW

TM2 was connected yesterday by Frank and Anders. The West side panel with IG1S on Exit Module 2 was replaced with a new SST panel with 1 CF flange only (dwg). Link to check list on DocuShare.

  1821   Wednesday, November 14, 2018, 16:10 Anders MjosITWRepairTM2UC#25ITW:FC5 safety signal troubleshooting

Measured resistance on safety limit switches for FC5 on Exit Module 2. Determined that the in connected signal did not work (shows not connected irregardless of FC position). Confirmed proper operation of the OUT limit. See attachment for details. The Harp 5 x and y signal connectors were checked and reconnected.

Attachment 1: 2018-11-13_FC5.pdf
2018-11-13_FC5.pdf
  1823   Thursday, November 22, 2018, 08:53 Anders MjosITWStandard OperationTM2UC#25Block move

Frank and Anders moved blocks from ITE to ITW yesterday

  1824   Thursday, November 22, 2018, 08:55 Anders MjosITWRepairTM2UC#25ITW:FC5 safety signal limit switch installed

Yesterday Diagnostics group installed a temporary external limit switch to provide the in signal to the safety system.

Attachment 1: FC5_limit_switch.jpg
FC5_limit_switch.jpg
ELOG V2.9.2-2455