Entry  Monday, November 15, 2021, 12:00, Travis Cave, Spent Target Vault, Standard Operation, , Ta#53, Repacking of the target. Target_Index_2021-11-15.pdfTarget_Index_2021-11-15_mini_vault.pdf
 Ta#53 was repacked and placed in the mini vault it was changed from pail#164 to pail#262. See attached PDF for further details.
Entry  Wednesday, November 10, 2021, 11:06, Travis Cave, Spent Target Vault, Standard Operation, , C#3, Spent Target Move Target_Index_2021-11-10.pdf
 The spent C#3 target has been moved from the south hot cell to the spent target vault it was placed in pail #270 and put in spot 2C of the vault.
See attached PDF for more details.
Entry  Wednesday, November 10, 2021, 08:32, Frank Song, ITW, Standard Operation, TM2, UC#36, Module Connection IMG_4323.JPG
 TM2 with target UC#36 was connected at ITW.
Entry  Wednesday, November 10, 2021, 08:29, Frank Song, South Hot-Cell, Standard Operation, TM2, UC#36, electrical check IMG_4322.JPG
 An electrical check of TM2 with target UC#36 and no external connections was finished at SHC. 
Entry  Tuesday, November 09, 2021, 14:35, Adam Newsome, South Hot-Cell, Standard Operation, TM2, UCX#36, Module Move 
TM#2 was moved from ITW to SHC, then moved back to ITW.
Entry  Tuesday, November 09, 2021, 09:58, Frank Song, ITW, Standard Operation, TM2, C#3, module disconnection IMG_4315.jpg
 the module TM2 with target C#3 was disconnected at ITW and is being remoted moving to SHC.
Entry  Friday, October 29, 2021, 12:27, Travis Cave, Spent Target Vault, Standard Operation, , Ta#56, Repacking of the target. Target_Index_2021-10-29.pdfTarget_Index_2021-10-29_mini_vault.pdf
 Ta#56 in pail #169 was repacked and placed into #269 and was placed in the mini vault at the back. It was 3.86mSv/hr upon removal from the NHC.
See attached files for details.
Entry  Tuesday, October 26, 2021, 11:01, Frank Song, ITE, Standard Operation, TM4, UCx#35, shielding blocks transfer 
 the five shielding blocks have been moved from ITW to ITE. 
Entry  Wednesday, October 13, 2021, 11:54, Travis Cave, North Hot-Cell, Standard Operation, , SiC#41, Spent Target Move Target_Index_2021-10-13.pdf
 The spent SiC#41 target has been placed in pail #260 and placed in spot 5B of that spent target vault. See attached PDF for details. 
Entry  Friday, October 08, 2021, 12:39, Frank Song, ITE, Standard Operation, TM4, UCx#35, Module Connection IMG_3742.jpgIMG_3741.jpgIMG_3743.jpgIMG_3744.jpg
 the module with target UC#35 was connected in ITE and being pumped down.
Entry  Friday, October 08, 2021, 11:19, Frank Song, North Hot-Cell, Standard Operation, TM4, UCx#35, TM4 IGLIS target electrical tests IMG_3739.jpgIMG_3740.jpg
 the tests were done when TM4 was on NHC. see attached photos please.
Entry  Wednesday, October 06, 2021, 10:42, David Wang, ITE, Repair, , , ITE IG1S cable end connector replacement 
ITE IG1S cable end connector replacement has been finished by Roy Huang. 
Entry  Monday, October 04, 2021, 10:52, Travis Cave, North Hot-Cell, Standard Operation, TM4, SiC#41, Module move 
 TM#2 moved from ITE to NHC SiC#41 removed and then moved back to ITE.
Entry  Monday, October 04, 2021, 09:37, Frank Song, ITE, Standard Operation, TM4, Sic#41, module disconnection IMG_3715.jpgIMG_3716.jpgIMG_3717.jpg
 TM4 was disconnected and moved to NHC. 
Entry  Monday, October 04, 2021, 09:33, Frank Song, North Hot-Cell, Standard Operation, TM2, C#3, TM2 with target connection test IMG_3710.jpg
 the test was done when TM2 sit on NHC.
Entry  Monday, October 04, 2021, 09:27, Frank Song, ITW, Standard Operation, TM2, C#3, Module Connection IMG_3711.jpgIMG_3712.jpgIMG_3713.jpgIMG_3714.jpg
 TM2 been connected with new target C#3 in ITW. 
Entry  Monday, September 27, 2021, 14:29, Travis Cave, ITW, Standard Operation, TM2, Graphite #3, Module move 
 TM#2 with C#3 has been moved from the north hot cell to ITW. Also for the up coming site wide power outage, the ISAC Target Hall crane has been
turned off and powered down, also the remote crane console has also been power down as well so that mean no ISAC TV for a few days.
Entry  Thursday, September 23, 2021, 19:04, Adam Newsome, Spent Target Vault, Development, , , Mini-Storage: Remote Capability 
Remote capability was added for the mini-storage door control. The control signals originate from the Opto 22 Module box that is used for the SMP remote
control (this is located just above the storage vault).
The controls signal assignment document has been updated and can be found in C:\PDM Vault\PDM_Vault\_models\isac\isac1\wpn-3919 - safe module parking\Electrical
Entry  Wednesday, September 22, 2021, 11:13, Travis Cave, Spent Target Vault, Standard Operation, , UC#34, Spent Target Move Target_Index_2021-09-22.pdf
 The spent UC#34 target was moved from the north hot cell to the spent target vault. See attached PDF for details.
Entry  Tuesday, September 21, 2021, 13:47, Travis Cave, North Hot-Cell, Standard Operation, TM2, UC#34, Module move 
 TM#2 with UC#34 has been moved from ITW to the north hot cell had the target removed and then moved to the south west silo.