  2015   Monday, October 28, 2019, 11:50 Travis CaveSpent Target VaultStandard Operation UC#28Spent Target Move UC#28 has been moved from the south
hot cell to spent target storage. The target
was placed in pail number 219 and placed
 Target_Index_2019-10-28.pdf 
  2004   Tuesday, October 08, 2019, 09:02 Travis CaveSouth Hot-CellStandard OperationTM4UC#27 and UC#28Electrical Check Results of the electrical check of
TM4 without target and with UC27 and 28
 TM_elec_chk_with_UC27_shc_post_beem_Oct-04-2019.pdfTM4_elec_chk__with_UC28_shc_Oct-04-2019.pdfTM4_elec_chk_no_tgt_shc_Oct-04-2019.pdf 
  1978   Thursday, September 05, 2019, 14:26 Travis CaveSouth Hot-CellStandard OperationTM4UC#27Electrical Check The results of the electrical check
of TM#4 with UC#27 attached to it.
 TM4_elec_chk_with_UC27_at_SHC_Sept_5_2019.pdf 
  1979   Thursday, September 05, 2019, 14:26 Travis CaveSouth Hot-CellStandard OperationTM4UC#27Electrical Check The results of the electrical check
of TM#4 with UC#27 attached to it.
 TM4_elec_chk_with_UC27_at_SHC_Sept_5_2019.pdf 
  1982   Tuesday, September 10, 2019, 10:10 Adam NewsomeITWStandard OperationTM4UC#27TM4 MoveTM4 has been moved from the Conditioning
Station to ITW with UC#27 target.
  
  2005   Wednesday, October 09, 2019, 13:28 Travis CaveSpent Target VaultStandard Operation UC#27Spent Target Move The spent target in the south hot
cell has been moved to the spent target vault.
It was placed in spot 1B of the vault in
 Target_Index_2019-10-09.pdf 
  1832   Wednesday, November 28, 2018, 13:38 Travis CaveConditioning StationStandard OperationTM4UC#26Module move TM#4 with UC#26 has been moved from
the south hot cell to the conditioning station.
  
  1835   Tuesday, December 04, 2018, 10:26 Travis CaveITEStandard OperationTM4UC#26Module move TM#4 with UC#26 has been moved from
the conditioning station to the east target
station.
  
  1840   Tuesday, December 11, 2018, 14:35 Anders MjosITEStandard OperationTM4UC#26Block moveBlocks were moved from ITW to ITE by Frank
and David. ITE water flow to dump was re-opened
(ITW remains open). A dose badge was installed
  
  1911   Tuesday, April 30, 2019, 08:59 Travis CaveSouth Hot-CellStandard OperationTM4UC#26Module move TM#4 with UC#26 has been moved from
ITE to the south hot cell.
  
  1912   Tuesday, April 30, 2019, 11:19 Travis CaveSouth Hot-CellStandard OperationTM4UC#26Electrical Check Electrical check of TM#4 with UC#26
post beam at the south hot cell. See attached.
 Elec_CHk_UC26_SHC_post_beam.pdf 
  1913   Wednesday, May 01, 2019, 07:49 chad fisherSouth Hot-CellStandard OperationTM4UC#26UC#26 removalUC#26 has been removed from TM4.  20190501_072940[1].jpg 
  1916   Thursday, May 02, 2019, 09:37 Travis CaveSpent Target VaultStandard Operation UC#26Spent Target Move The spent UC#26 target was moved
from the south hot cell to the spent target
vault. It was place in pail #209 and put
 Target_Index_2019-05-02.pdf 
  1813   Wednesday, October 31, 2018, 14:20 Travis CaveConditioning StationStandard OperationTM2UC#25Module moveTM#2 with UC#25 has been moved from the south
hot cell to the conditioning station.
  
  1817   Monday, November 05, 2018, 14:27 Anders MjosConditioning StationStandard OperationTM2UC#25Target module disconnectedFrank and Anders disconnected the water
and electrical connections this afternoon
after the target was conditioned over the
  
  1818   Tuesday, November 06, 2018, 10:59 Travis CaveITWStandard OperationTM2UC#25Module move TM#2 with UC#25 has been moved from
the conditioning station to the west target
station.
  
  1819   Wednesday, November 07, 2018, 09:50 Anders MjosITWStandard OperationTM2UC#25TM2 connected in ITWTM2 was connected yesterday by Frank and
Anders. The West side panel with IG1S on
Exit Module 2 was replaced with a new SST
  
  1821   Wednesday, November 14, 2018, 16:10 Anders MjosITWRepairTM2UC#25ITW:FC5 safety signal troubleshootingMeasured resistance on safety limit switches
for FC5 on Exit Module 2. Determined that
the in connected signal did not work (shows
 2018-11-13_FC5.pdf 
  1823   Thursday, November 22, 2018, 08:53 Anders MjosITWStandard OperationTM2UC#25Block moveFrank and Anders moved blocks from ITE
to ITW yesterday
  
  1824   Thursday, November 22, 2018, 08:55 Anders MjosITWRepairTM2UC#25ITW:FC5 safety signal limit switch installedYesterday Diagnostics group installed a
temporary external limit switch to provide
the in signal to the safety system.
 FC5_limit_switch.jpg 