Wednesday, September 11, 2013, 11:31, Travis Cave, Conditioning Station, Standard Operation, TM3, no target, module move
|
TM#3 with no target has been moved to the conditioning station from the south hot cell. |
Thursday, September 12, 2013, 09:29, Travis Cave, ITW, Standard Operation, TM4, SiC#29, module move
|
TM#4 with SiC#29 has been moved to the south hot cell move went well. |
Thursday, September 12, 2013, 10:35, Travis Cave, South Hot-Cell, Standard Operation, TM4, SiC#29, Electrical check
|
TM#4 with SiC#29 post beam electrical check in the south hot cell see PDF for details. |
Thursday, September 19, 2013, 09:08, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, wiring harness
|
The wiring harness for TM#3 was made and a continuity and megger test was done on it and it passed, it has since been installed into the hot cell and placed on the module. |
Thursday, September 19, 2013, 11:09, Travis Cave, South Hot-Cell, Maintenance, TM3, no target, Electrical check
|
Electrical check of TM#3 with no target was performed and it failed. There is a 135M Ohm short between the coils and a 165M Ohm short between the coil and 60kV common. All other circuits passed they were infinite in value. |
Tuesday, September 24, 2013, 08:15, Travis Cave, South Hot-Cell, Standard Operation, TM3, no target, Electrical check
|
Electrical check was done on TM#3 yesterday and again the coil lines to the 60kV common and the coil line to each other failed, as in they had a resistance. Everything else passed as showing an infinite value, all meggering was done at 1000V unless noted other wise. See attached PDF for details. |
Wednesday, September 25, 2013, 10:00, Travis Cave, South Hot-Cell, Standard Operation, TM3, NiO#2, module move
|
TM#3 with NiO#2 has been moved from the south hot cell to the conditioning station. |
Wednesday, September 25, 2013, 11:08, Travis Cave, South Hot-Cell, Standard Operation, TM3, NiO#2, Electrical check
|
The module was checked electrically this morning before the module move. See the attached PDF for details. |
Wednesday, September 25, 2013, 13:48, Travis Cave, Conditioning Station, Standard Operation, TM3, NiO#2, Electrical check
|
Electrical check of TM#3 in the conditioning station under vacuum see attached PDF for details. |
Friday, September 27, 2013, 10:54, Travis Cave, Conditioning Station, Standard Operation, TM3, NiO#2, module move
|
TM#3 with NiO#2 has been moved to the south hot cell from the conditioning station. |
Monday, September 30, 2013, 12:23, Travis Cave, South Hot-Cell, Standard Operation, TM3, NiO#2, Electrical check
|
Results of the various electrical checks done on TM#3 while at the hot cell since the 27th of September. View PDF for the details. |
Monday, September 30, 2013, 14:00, Travis Cave, Conditioning Station, Standard Operation, TM3, NiO#2, module move
|
TM#3 with NiO#2 has been move from south hot cell to the conditioning station. |
Tuesday, October 01, 2013, 10:59, Travis Cave, South Hot-Cell, Standard Operation, TM4, SiC#29, Electrical check
|
TM#4 with SiC#29 electrical check post beam see pdf for details. |
Tuesday, October 01, 2013, 11:00, Travis Cave, Conditioning Station, Standard Operation, TM3, NiO#2, Electrical check
|
TM#3 with NiO#2 electrical check at conditioning station under vacuum, see pdf for details. |
Wednesday, October 02, 2013, 14:47, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, Electrical check
|
Electrical check done on TM#4 with no target, see PDF. |
Thursday, October 03, 2013, 10:18, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, module move
|
TM#4 with no target has been moved from the south hot cell to the south west silo. |
Monday, October 07, 2013, 12:06, Travis Cave, ITE, Standard Operation, TM3, NiO#2, module move
|
TM#3 has been moved from the conditioning station to the east target station, move went well. |
Tuesday, October 08, 2013, 13:11, Travis Cave, Spent Target Vault, Standard Operation, , SiC#29, Spent target move
|
SiC#29 has been moved to the spent target vault. The target was placed in Pail #109 and placed into slot 2B it was 24.7mS/hr upon removal from the south hot cell. See attached PDF of the vault details. |
Tuesday, October 08, 2013, 14:55, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, module move
|
TM#4 with no target was to be moved today but the move was aborted when the crane failed to move in the East - West direction. The crane does not preform this function in either remote or pendant operation. |
Wednesday, October 16, 2013, 10:12, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, module move
|
TM#4 with no target has been moved from the south west silo to the south hot cell. |
|