2278
|
Friday, November 26, 2021, 10:52 |
Adam Newsome | Spent Target Vault | Standard Operation | | UC#35 | Spent Target Move | The spent UC#35 target has been moved from
the south hot cell to the spent target vault.
It was placed in pail #264 and put in spot |
|
2248
|
Tuesday, September 21, 2021, 13:47 |
Travis Cave | North Hot-Cell | Standard Operation | TM2 | UC#34 | Module move | TM#2 with UC#34 has been moved from
ITW to the north hot cell had the target
removed and then moved to the south west |
|
2249
|
Wednesday, September 22, 2021, 11:13 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#34 | Spent Target Move | The spent UC#34 target was moved
from the north hot cell to the spent target
vault. See attached PDF for details. |
|
2239
|
Friday, August 06, 2021, 11:52 |
Travis Cave | North Hot-Cell | Standard Operation | | UC#33 | Spent Target Move | UC#33 has been packed and moved from the north
hot cell to the spent target vault. See attached
PDF for
|
|
2146
|
Wednesday, September 23, 2020, 10:56 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UC#31 P2N | Uc#30 removed UC#31 P2N installed | UCx#30 has been removed from TM#4 and put
in a can with argon. 5(10) pin connector
had to have guide screws removed to be uninstalled. |
|
2148
|
Thursday, September 24, 2020, 11:25 |
David Wang | Conditioning Station | Standard Operation | TM4 | UC#31 | TM4 HS line leak check at SHC and TCS. | Both helium spray and helium pressurize
on TM4 HS line withUCx31 target are done
at SHC and TCS. No leak. |
|
2150
|
Tuesday, September 29, 2020, 12:29 |
Travis Cave | ITE | Standard Operation | TM4 | UC#31 | Module move | Module move of TM#4 with UC#31 was
finished to today at around 10:30AM. |
|
2151
|
Tuesday, September 29, 2020, 14:28 |
David Wang | South Hot-Cell | Standard Operation | TM4 | UC#31 | TM4 UC#31 Electrical check and HS leak check | Tm4 UCx 31# electrical check result. See
attachment. |
|
2153
|
Tuesday, October 13, 2020, 10:16 |
Travis Cave | ITE | Repair | TM4 | UC#31 | Module move | TM#4 is now in the south hot cell
from the east target station. |
|
2154
|
Thursday, October 15, 2020, 12:48 |
Travis Cave | ITE | Standard Operation | TM4 | UC#31 | Module move | TM#4 is now back in the east target
station. |
|
2160
|
Tuesday, November 03, 2020, 10:52 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#31 | Module move | TM#4 with UC#31 has been moved from
the east target station to the south hot
cell. |
|
2163
|
Thursday, November 12, 2020, 10:02 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#31 | Spent Target Move | UC#31 has been moved from the south
hot cell to the spent target vault. It is
in spot 8B of the vault in pail # 224 and |
|
2119
|
Friday, July 03, 2020, 14:08 |
Travis Cave | ITE | Standard Operation | TM4 | UC#30 | Module move | TM#4 with UC#30 has been moved from
the south hot cell to the east target station. |
|
2145
|
Tuesday, September 22, 2020, 10:56 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#30 | Module move | TM#4 with UC#30 has been moved from
ITE to the south hot cell. |
|
2147
|
Thursday, September 24, 2020, 10:34 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#30 | Spent Target Move | UC#30 has been placed into the spent
target vault, it was placed in pail 238 and
in spot 1A of the vault. It was 81.5 mSv/hr |
|
74
|
Monday, March 12, 2012, 10:03 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UC#3 | UC#3 Removal | UC#3 was removed from TM1 this morning.
Upon removing the oven heater bolts BOTH
legs fell demonstrating that both sides of |
|
2013
|
Thursday, October 24, 2019, 14:11 |
Travis Cave | ITW | Standard Operation | TM4 | UC#29 | Module move | TM#4 with UC29 has been moved from
the south hot cell to the west target station. |
|
2058
|
Tuesday, February 04, 2020, 14:22 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#29 | Module move | TM#4 with UC#29 has been moved from
the west target station to the south hot
cell. |
|
2063
|
Thursday, February 06, 2020, 13:31 |
Adam Newsome | Spent Target Vault | Standard Operation | | UC#29 | UC#29 moved to vault location 6A, in pail 225 | UC#29 in pail 225 was moved to the
storage vault, location 6A. Field measured
at 22.4 mSv/hr at ~1m. |
|
1999
|
Friday, October 04, 2019, 14:53 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#28 | Module move | TM#4 with UC#28 has been moved from
the south hot cell to the west target station. |
|