Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 24 of 138  Not logged in ELOG logo
ID Date Authordown Category Type Module Target/Number Subject
  465   Wednesday, September 25, 2013, 11:08 Travis CaveSouth Hot-CellStandard OperationTM3NiO#2Electrical check

The module was checked electrically this morning before the module move. See the attached PDF for details.

  466   Wednesday, September 25, 2013, 13:48 Travis CaveConditioning StationStandard OperationTM3NiO#2Electrical check

Electrical check of TM#3 in the conditioning station under vacuum see attached PDF for details.

  475   Friday, September 27, 2013, 10:54 Travis CaveConditioning StationStandard OperationTM3NiO#2module move

TM#3 with NiO#2 has been moved to the south hot cell from the conditioning station.

  477   Monday, September 30, 2013, 12:23 Travis CaveSouth Hot-CellStandard OperationTM3NiO#2Electrical check

Results of the various electrical checks done on TM#3 while at the hot cell since the 27th of September. View PDF for the details.

  478   Monday, September 30, 2013, 14:00 Travis CaveConditioning StationStandard OperationTM3NiO#2module move

TM#3 with NiO#2 has been move from south hot cell to the conditioning station.

  483   Tuesday, October 01, 2013, 10:59 Travis CaveSouth Hot-CellStandard OperationTM4SiC#29Electrical check

TM#4 with SiC#29 electrical check post beam see pdf for details.

  484   Tuesday, October 01, 2013, 11:00 Travis CaveConditioning StationStandard OperationTM3NiO#2Electrical check

TM#3 with NiO#2 electrical check at conditioning station under vacuum, see pdf for details.

  487   Wednesday, October 02, 2013, 14:47 Travis CaveSouth Hot-CellStandard OperationTM4no targetElectrical check

Electrical check done on TM#4 with no target, see PDF.

  488   Thursday, October 03, 2013, 10:18 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule move

TM#4 with no target has been moved from the south hot cell to the south west silo.

  496   Monday, October 07, 2013, 12:06 Travis CaveITEStandard OperationTM3NiO#2module move

TM#3 has been moved from the conditioning station to the east target station, move went well.

  497   Tuesday, October 08, 2013, 13:11 Travis CaveSpent Target VaultStandard Operation SiC#29Spent target move

SiC#29 has been moved to the spent target vault. The target was placed in Pail #109 and placed into slot 2B it was 24.7mS/hr upon removal from the south hot cell. See attached PDF of the vault details.

  498   Tuesday, October 08, 2013, 14:55 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule move

TM#4 with no target was to be moved today but the move was aborted when the crane failed to move in the East - West direction. The crane does not preform this function in either remote or pendant operation.

  504   Wednesday, October 16, 2013, 10:12 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule move

TM#4 with no target has been moved from the south west silo to the south hot cell.

  512   Friday, October 18, 2013, 14:56 Travis CaveSouth Hot-CellStandard OperationTM4no targetElectrical check

With the coil line removed an electrical check was done on TM#4 at the South Hot Cell see attached pdf.

  516   Tuesday, October 22, 2013, 11:18 Travis CaveITWStandard OperationTM1UC#7module move

TM#1 with UC#7 has been moved from the ITW to the south west silo.

  521   Wednesday, October 23, 2013, 09:28 Travis CaveSouth Hot-CellStandard OperationTM1UC#7module move

TM#1 with UC #7 has been moved from the south west silo to the south hot cell.

  522   Wednesday, October 23, 2013, 12:07 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule move

TM#1 with no target has been moved back to the south west silo from the south hot cell.

  523   Thursday, October 24, 2013, 11:31 Travis CaveSpent Target VaultStandard Operation UC#7Spent target move

UC #7 has been moved from the south hot cell to the spent target vault, it was placed in pail #110 and put in slot 8B of the vault, it was 22.6mSv/hr upon removal from the hot cell. See attached PDF for vault details.

  524   Thursday, October 24, 2013, 11:32 Travis CaveSouth Hot-CellStandard OperationTM4no targetmodule move

TM#4 with no target has been moved from the conditioning station to the south hot cell.

  528   Friday, October 25, 2013, 10:26 Travis CaveITWStandard OperationTM4Ta#41module move

TM#4 with Ta#41 has been moved from the south hot cell to the west target station.

ELOG V2.9.2-2455