230
|
Monday, January 14, 2013, 14:09 |
Travis Cave | ITW | Standard Operation | TM1 | no target | module move | TM#1 has been moved from the south hot
hell to the west target station, move went
well. |
|
|
232
|
Tuesday, January 15, 2013, 14:37 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#3 | Spent target move | TiC #3 was moved from the south hot cell
in to the vault storage today, it was placed
in slot 4B and was in pail #104, it had a |
|
|
234
|
Thursday, January 17, 2013, 11:18 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | | module move | TM#4 has been moved from the SW silo to
the south hot cell, move went well. |
|
|
235
|
Friday, January 18, 2013, 09:10 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | CS Test Target #1 | Electrical check | Electrical check performed on the CS Test
Target #1 at the south hot cell. See PDF
for details. |
|
|
236
|
Friday, January 18, 2013, 11:15 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | module move | TM#4 with the test target #1 is now in
the conditioning station, move went well. |
|
|
241
|
Monday, January 28, 2013, 12:26 |
Travis Cave | Conditioning Station | Development | | | Switches connected | the switches and the solenoid are all wire
up to 24VDC, when you open either of the
little doors the solenoid switches this is |
|
|
248
|
Tuesday, February 26, 2013, 10:26 |
Travis Cave | ITW | Standard Operation | TM1 | | module move | TM1 moved from the west station to the
southwest silo. Move went well. |
|
|
249
|
Tuesday, February 26, 2013, 13:24 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | module move | TM#4 with CS Test Target #1 (dummy target)
moved from the conditioning station to the
east target station. Move went well. |
|
|
252
|
Wednesday, March 06, 2013, 10:09 |
Travis Cave | ITW | Maintenance | | | module move | ITW EX1 has been moved from the west target
station to the south hot cell for the seal
replacement on the west station. |
|
|
253
|
Wednesday, March 06, 2013, 12:50 |
Travis Cave | South Hot-Cell | Maintenance | | | module move | ITW EX1 have been moved back to the west
target station from the south hot cell. |
|
|
277
|
Monday, March 25, 2013, 14:19 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | CS Test Target #1 | module move | TM#4 with the CS Test target has been moved
from the conditioning station to the south
hot cell. Move went well. |
|
|
278
|
Tuesday, March 26, 2013, 14:17 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#28 (RFQ Target) | Electrical check | Electrical check of TM#4 SiC#28 (RFQ Target)
has been completed. It passed the standard
electrical checks for the target part, but |
|
|
279
|
Wednesday, March 27, 2013, 10:44 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#28 (RFQ Target) | module move | TM#4 with SiC#28 has been moved from the
south hot cell to the east target station
move went well. |
|
|
283
|
Wednesday, April 03, 2013, 10:59 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move | TM#1 has been moved from the south west
silo to the south hot cell, move went well. |
|
|
286
|
Wednesday, April 03, 2013, 14:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#39 | Electrical check | Electrical check on TM#1 with Ta#39 installed
at the south hot cell. Target passed the
electrical checks, see attached pdf for details. |
|
|
287
|
Thursday, April 04, 2013, 11:06 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#39 | module move | TM#1 with Ta#39 has been moved from the
south hot cell to the conditioning station
move went well. |
|
|
290
|
Monday, April 08, 2013, 09:01 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Ta#39 | Electrical check | TM#1 with Ta#39 at the conditioning station,
has failed its electrical test see attached
pdf for details. Also while setting up for |
|
|
291
|
Monday, April 08, 2013, 12:10 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Ta#39 | Electrical check | TM#1 with Ta#39 had the electrical check
done on it again it passed, changes this
time were the water lines were purged and |
|
|
293
|
Tuesday, April 09, 2013, 09:06 |
Travis Cave | Conditioning Station | Standard Operation | TM1 | Ta#39 | Electrical check | TM#1 with Ta#39 has not passed it electrical
check again, while sitting at the conditioning
station at air. The readings have not been |
|
|
298
|
Tuesday, April 16, 2013, 11:10 |
Travis Cave | South Hot-Cell | Standard Operation | TM3 | no target | module move | TM#3 has been moved from the NE Silo to
the south hot cell, move went well. |
|