ID Date Authordown Category Type Module Target/Number Subject Text Attachments
  213   Tuesday, November 13, 2012, 10:55 Travis CaveITWStandard OperationTM1TiC#3module moveTM#1 with TiC #3 moved from the conditioning
station to the west target station, 
move went well.
  
  216   Wednesday, November 14, 2012, 11:51 Travis CaveSpent Target VaultStandard Operation  Moving the spent targets to mini storage.Five spent targets have been moved from
the storage vault to the mini storage vault.
The five targets are as follows: SiC #25,
 Vault_Storage_November_14_2012.pdfMini_Vault_Storage_November_14_2012.pdf 
  217   Wednesday, November 21, 2012, 09:36 Travis CaveSpent Target VaultStandard Operation  Spent target moveOn Nov 20th the 5 targets in mini storage
have been moved to the F-308s, those F-308s
have since been moved to the hot cell ante
  
  219   Tuesday, December 04, 2012, 13:27 Travis CaveITEStandard OperationTM4UCx#5module move & electrical checkTM#4 with UC#5 has been moved from east
target station to the south hot cell move
went well.  Also the electrical check
 UC#5_SIS_Post_beam.PDF 
  224   Thursday, December 06, 2012, 08:57 Travis CaveSpent Target VaultStandard Operation UCx#5Spent target moveUCx #5 has been moved from the south hot
cell to the storage vault. It is in Pail
102, in spot 2A of the vault and had a field
 Vault_Storage_December_6_2012.pdf 
  227   Tuesday, January 08, 2013, 08:48 Travis CaveSouth Hot-CellStandard OperationTM1TiC#3Electrical checkTM#1 with TiC #3 post beam. See attached
PDF for results.
 TiC#3_Elec_Check_Post_beam.PDF 
  228   Tuesday, January 08, 2013, 14:18 Travis CaveSouth Hot-CellStandard OperationTM1no targetElectrical checkTM#1 was electrically check with out a
target see attached PDF for results.
 TM#1_no_tgt_Jan_8_2013.PDF 
  230   Monday, January 14, 2013, 14:09 Travis CaveITWStandard OperationTM1no targetmodule moveTM#1 has been moved from the south hot
hell to the west target station, move went
well.
  
  232   Tuesday, January 15, 2013, 14:37 Travis CaveSpent Target VaultStandard Operation TiC#3Spent target moveTiC #3 was moved from the south hot cell
in to the vault storage today, it was placed
in slot 4B and was in pail #104, it had a
 Vault_Storage_January_15_2013.pdf 
  234   Thursday, January 17, 2013, 11:18 Travis CaveSouth Hot-CellStandard OperationTM4 module moveTM#4 has been moved from the SW silo to
the south hot cell, move went well.
  
  235   Friday, January 18, 2013, 09:10 Travis CaveSouth Hot-CellStandard OperationTM4CS Test Target #1Electrical checkElectrical check performed on the CS Test
Target #1 at the south hot cell. See PDF
for details.
 CS_Test_Target_#1_Elec_check.PDF 
  236   Friday, January 18, 2013, 11:15 Travis CaveConditioning StationStandard OperationTM4CS Test Target #1module moveTM#4 with the test target #1 is now in
the conditioning station, move went well.
  
  241   Monday, January 28, 2013, 12:26 Travis CaveConditioning StationDevelopment  Switches connectedthe switches and the solenoid are all wire
up to 24VDC, when you open either of the
little doors the solenoid switches this is
  
  248   Tuesday, February 26, 2013, 10:26 Travis CaveITWStandard OperationTM1 module moveTM1 moved from the west station to the
southwest silo. Move went well.
  
  249   Tuesday, February 26, 2013, 13:24 Travis CaveConditioning StationStandard OperationTM4CS Test Target #1module moveTM#4 with CS Test Target #1 (dummy target)
moved from the conditioning station to the
east target station. Move went well.
  
  252   Wednesday, March 06, 2013, 10:09 Travis CaveITWMaintenance  module moveITW EX1 has been moved from the west target
station to the south hot cell for the seal
replacement on the west station.
  
  253   Wednesday, March 06, 2013, 12:50 Travis CaveSouth Hot-CellMaintenance  module moveITW EX1 have been moved back to the west
target station from the south hot cell.
  
  277   Monday, March 25, 2013, 14:19 Travis CaveConditioning StationStandard OperationTM4CS Test Target #1module moveTM#4 with the CS Test target has been moved
from the conditioning station to the south
hot cell. Move went well.
  
  278   Tuesday, March 26, 2013, 14:17 Travis CaveSouth Hot-CellStandard OperationTM4SiC#28 (RFQ Target)Electrical checkElectrical check of TM#4 SiC#28 (RFQ Target)
has been completed. It passed the standard
electrical checks for the target part, but
 TM4_SiC28_RFQ_SHC_ELEC_CHK.PDF 
  279   Wednesday, March 27, 2013, 10:44 Travis CaveITEStandard OperationTM4SiC#28 (RFQ Target)module moveTM#4 with SiC#28 has been moved from the
south hot cell to the east target station
move went well.
  