  230   Monday, January 14, 2013, 14:09 Travis CaveITWStandard OperationTM1no targetmodule moveTM#1 has been moved from the south hot
hell to the west target station, move went
well.
  
  232   Tuesday, January 15, 2013, 14:37 Travis CaveSpent Target VaultStandard Operation TiC#3Spent target moveTiC #3 was moved from the south hot cell
in to the vault storage today, it was placed
in slot 4B and was in pail #104, it had a
 Vault_Storage_January_15_2013.pdf 
  234   Thursday, January 17, 2013, 11:18 Travis CaveSouth Hot-CellStandard OperationTM4 module moveTM#4 has been moved from the SW silo to
the south hot cell, move went well.
  
  235   Friday, January 18, 2013, 09:10 Travis CaveSouth Hot-CellStandard OperationTM4CS Test Target #1Electrical checkElectrical check performed on the CS Test
Target #1 at the south hot cell. See PDF
for details.
 CS_Test_Target_#1_Elec_check.PDF 
  236   Friday, January 18, 2013, 11:15 Travis CaveConditioning StationStandard OperationTM4CS Test Target #1module moveTM#4 with the test target #1 is now in
the conditioning station, move went well.
  
  241   Monday, January 28, 2013, 12:26 Travis CaveConditioning StationDevelopment  Switches connectedthe switches and the solenoid are all wire
up to 24VDC, when you open either of the
little doors the solenoid switches this is
  
  248   Tuesday, February 26, 2013, 10:26 Travis CaveITWStandard OperationTM1 module moveTM1 moved from the west station to the
southwest silo. Move went well.
  
  249   Tuesday, February 26, 2013, 13:24 Travis CaveConditioning StationStandard OperationTM4CS Test Target #1module moveTM#4 with CS Test Target #1 (dummy target)
moved from the conditioning station to the
east target station. Move went well.
  
  252   Wednesday, March 06, 2013, 10:09 Travis CaveITWMaintenance  module moveITW EX1 has been moved from the west target
station to the south hot cell for the seal
replacement on the west station.
  
  253   Wednesday, March 06, 2013, 12:50 Travis CaveSouth Hot-CellMaintenance  module moveITW EX1 have been moved back to the west
target station from the south hot cell.
  
  277   Monday, March 25, 2013, 14:19 Travis CaveConditioning StationStandard OperationTM4CS Test Target #1module moveTM#4 with the CS Test target has been moved
from the conditioning station to the south
hot cell. Move went well.
  
  278   Tuesday, March 26, 2013, 14:17 Travis CaveSouth Hot-CellStandard OperationTM4SiC#28 (RFQ Target)Electrical checkElectrical check of TM#4 SiC#28 (RFQ Target)
has been completed. It passed the standard
electrical checks for the target part, but
 TM4_SiC28_RFQ_SHC_ELEC_CHK.PDF 
  279   Wednesday, March 27, 2013, 10:44 Travis CaveITEStandard OperationTM4SiC#28 (RFQ Target)module moveTM#4 with SiC#28 has been moved from the
south hot cell to the east target station
move went well.
  
  283   Wednesday, April 03, 2013, 10:59 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule moveTM#1 has been moved from the south west
silo to the south hot cell, move went well.
  
  286   Wednesday, April 03, 2013, 14:39 Travis CaveSouth Hot-CellStandard OperationTM1Ta#39Electrical checkElectrical check on TM#1 with Ta#39 installed
at the south hot cell. Target passed the
electrical checks, see attached pdf for details.
 TM1_Ta39_SHC_ELEC_CHK.PDF 
  287   Thursday, April 04, 2013, 11:06 Travis CaveSouth Hot-CellStandard OperationTM1Ta#39module moveTM#1 with Ta#39 has been moved from the
south hot cell to the conditioning station
move went well.
  
  290   Monday, April 08, 2013, 09:01 Travis CaveConditioning StationStandard OperationTM1Ta#39Electrical checkTM#1 with Ta#39 at the conditioning station,
has failed its electrical test see attached
pdf for details. Also while setting up for
 TM1_Ta39_CS_ELEC_CHK.PDF 
  291   Monday, April 08, 2013, 12:10 Travis CaveConditioning StationStandard OperationTM1Ta#39Electrical checkTM#1 with Ta#39 had the electrical check
done on it again it passed, changes this
time were the water lines were purged and
 TM1_Ta39_CS_ELEC_CHK2.PDF 
  293   Tuesday, April 09, 2013, 09:06 Travis CaveConditioning StationStandard OperationTM1Ta#39Electrical checkTM#1 with Ta#39 has not passed it electrical
check again, while sitting at the conditioning
station at air. The readings have not been
 TM1_Ta39_CS_ELEC_CHK3.PDFTM1_Ta39_CS_ELEC_CHK4.PDFTM1_Ta39_CS_ELEC_CHK5.PDF 
  298   Tuesday, April 16, 2013, 11:10 Travis CaveSouth Hot-CellStandard OperationTM3no targetmodule moveTM#3 has been moved from the NE Silo to
the south hot cell, move went well.
  