Entry  Thursday, September 15, 2022, 11:25, Travis Cave, Spent Target Vault, Standard Operation, , UC#38, Spent Target Move Target_Index_2022-09-15.pdf
 The spent target UC#38 was packed into pail #274 and placed in spot 1A of the vault. It was 33.3mSv/hr when removed from the north hot cell. See
attached PDF for more vault details.
Entry  Wednesday, September 14, 2022, 13:45, Adam Newsome, Spent Target Vault, Development, , , Storage Vault: cable replaced and e-chain upgrade PXL_20220914_183329159.jpg
The motor cable for the storage vault was replaced as the old one was showing signs of wear. The U-track that the old cable ran through was also bent
as a result of being hit.
In the process of replacing the cable, an e-chain was installed for cable management purposes. Mounting brackets were modified and a new U-track
Entry  Tuesday, September 13, 2022, 14:10, Frank Song, ITW, Standard Operation, TM2, UCx#39, Module Connection TM2_with_UCx#39_connection_in_ITW.png
 TM2 with UCx#39 is connected in ITW.
Entry  Thursday, September 08, 2022, 09:06, David Wang, Conditioning Station, Standard Operation, TM2, UCx#39, HS line helium pressure test. 
TM2 with UCX#39 HS line helium pressure test is done at TCS. 70 psi helium 3minutes. No leak @0.0XE-9 atm.cc/sec. 
Entry  Thursday, September 08, 2022, 07:20, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#39, electrical check TM2_with_UCx#39_E_Check.png
 An electrical check was done on NHC yesterday.
Entry  Tuesday, September 06, 2022, 14:05, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#38, electrical check after disconnection  TM2_electrical_check_on_NHC_with_spent_UCx38_on.png
 An electrical was done on the NHC for TM2 with spent Target UCx#38 on
Entry  Tuesday, September 06, 2022, 13:58, Frank Song, ITW, Standard Operation, TM2, UCx#38, module disconnection TM2_with_UCx38_disconnection_in_ITW.png
 TM2 with Target UCx38 was disconnected in ITW and moved to NHC
Entry  Tuesday, August 23, 2022, 11:33, Carla Babcock, ITE, Repair, , , ITE:ANODE swapped with TCS:ANODE 
ITE:ANODE supply reading strange currents - 17mA with the power supply on and no voltage. Checked anode circuit from electrical room:
Anode wire in electrical room shows 0L at 250V
Circuit with 50kOhm resistor mostly looks good (49-52kOhms) but a couple times read 28kOhms, no idea why. Tried jiggling all cables, unplugging
Entry  Tuesday, August 23, 2022, 10:51, Carla Babcock, ITE, Repair, TM4, SiC#44, TBHT to HV common short on SiC#44-TM4 
TM4 with SiC#44 installed developed a short TBHT to HV common during its first heating in ITE. Was fine before installation. Now with everything cold
TBHT to HVC is 25kOhms. Removed short in electrical room, will rely on short in the module.
Entry  Thursday, August 18, 2022, 10:41, Frank Song, ITE/ITW, Standard Operation, TM4, SiC#44, TM4 with SiC#44 connection in ITE TM4_with_SiC#44_connection_in_ITE.jpg
 TM4 with target SiC#44 was connected in ITE on Tuesday.
Entry  Thursday, August 18, 2022, 10:13, Travis Cave, Spent Target Vault, Standard Operation, , Ta#64, Spent Target Move Target_Index_2022-08-18.pdf
 The spent Ta#64 target in the north hot cell has been packaged and placed in the spent target vault. Pail#273 spot #5C 86.6mSv/hr upon removal
from the north hot cell. For detail on the vault see attached PDF.
Entry  Thursday, August 11, 2022, 09:10, David Wang, Conditioning Station, Standard Operation, TM4, SiC #44, HS line helium pressure test. Gas line fitting on module top and gas line leak check.  
HS line helium pressure test is done at TCS. No leak. I also leak checked gasline adapter and fittings on TM4 top. No leak.  1/4 copper gas line
between module and ITE was leak checked yesterday. It is good. 
Entry  Wednesday, August 10, 2022, 08:10, Frank Song, North Hot-Cell, Standard Operation, TM4, Sic#44, electrical and leak check  TM4_with_Sic#44_eletrical_and_leak_check.jpg
 TM4 with Sic#44 installed and had an electrical / leak check at NHC. 
Entry  Tuesday, August 09, 2022, 12:23, Frank Song, North Hot-Cell, Standard Operation, TM4, Ta #64, Electrical Check for TM4 with Ta#64 after beam at NHC tm4_with_Ta#64_after_beam_at_NHC.jpg.jpeg
 An electrical check made at NHC right after TM4 moving from ITE.
Entry  Tuesday, August 09, 2022, 12:19, Frank Song, ITE, Standard Operation, TM4, Ta#64, TM4 with Ta#64 disconnection in ITE TM4_with_Ta#64_disconnection_in_ITE.jpeg
 TM4 with Ta#64 has been disconnected in ITE.
Entry  Friday, July 29, 2022, 12:05, Carla Babcock, North Hot-Cell, Repair, TM2, UCx#38, Repair of UCx#38 EE short in ante room 20220726_111649.jpg20220726_111641.jpg
UCx#38 developed a short between the plasma electrode and the extraction electrode about 30mins after reaching full temperature in the conditioning station.
The decision was made to bring it into the anteroom and try to clean it there.
To do this, it was uninstalled, the parasitic attachments were removed and it was brought into the ante room.
Entry  Thursday, July 28, 2022, 10:47, Travis Cave, Spent Target Vault, Standard Operation, , SiC#43, Spent Target Move Target_Index_2022-07-28.pdf
 The spent target SiC#43 was moved from the north hot cell in pail #272 and place in 5A of the spent target vault. See attached PDF for details.
Entry  Wednesday, July 27, 2022, 08:11, Frank Song, ITW, Standard Operation, TM2, UCx#38, Module Connection TM2_with_UCx38_connection_at_ITW.jpg
 TM2 with Target UCx#38 was connected in ITW.
Entry  Tuesday, July 26, 2022, 13:50, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#38, TM2 electrical check with Target and No external Connections TM2_with_UCx38_echeck_on_NHC.jpg
 A standard electrical check was done for TM2 after the short issue be fixed.
Entry  Thursday, July 21, 2022, 10:24, Frank Song, North Hot-Cell, Standard Operation, TM2, UCx#38, electrical check TM2_with_UCx38_echeck_on_NHC.jpg
 A electrical check was done for TM2 with UCx#38