Tuesday, January 14, 2025, 10:00, David Wang, South Hot-Cell, Standard Operation, TM3, UCx#47, after operation electrical check, Tm3 UCx 47
|
TM3 UCx#47 after operation electrical check is done at SHC. The result is normal. See attachment. |
Tuesday, October 01, 2019, 10:22, chad fisher, South Hot-Cell, Standard Operation, TM2, ZrC#8, ZrC#8 Removed Ta#59 installed
|
ZrC#8 has been removed from TM2. Upon removal of the high current tube heater bolts it was noticed that the tube was broken. Also the 9 pin connector has an arc mark (see pictures attached).
Ta#59 has been installed with new fasteners. High current fasteners torqued to 130 in lbs. |
Wednesday, October 02, 2019, 08:25, chad fisher, South Hot-Cell, Standard Operation, , ZrC#8, ZrC#8 PIE
|
Heat shield has been removed from ZrC#8. |
Wednesday, October 14, 2015, 14:03, chad fisher, South Hot-Cell, Standard Operation, TM2, ZrC#7, ZrC#7 removed 
|
ZrC#7 has been removed from TM2. Everything looks good. |
Friday, October 23, 2015, 11:30, chad fisher, South Hot-Cell, Standard Operation, , ZrC#7, ZrC#7 Spent Move and Febiad Coil
|
ZrC#7 was transfered to a spent target disposal pail today and removed from the hot cell. The "hot" end of the TM4 coil end was also disposed of in the same pail (#129) |
Thursday, March 21, 2024, 11:35, Ferran Boix Pamies, ITE, Development, , , Wiring of new thermocouple PLC module
|
Thursday, March 21, 2024, 11:33 Three channels are available now for thermocouple readouts from the Target multipin. Wiring from the PLC modules to the connection terminal blocks and labeling done. |
Wednesday, May 06, 2015, 14:30, Travis Cave, South Hot-Cell, Repair, TM2, No target, Wiring of TM#2 
|
Wires for TM#2 steering elements, and png gauge have been run down to the containment box level. Chad has placed them in the little cable trays. Slack has been pulled back. and termination of the wire will be done on the 7th of May. A modification was done to the signal line of the png gauge wire ultem block, as grounded screw was inserted to allow for strain relief so the end would hopefully quit breaking. See attached pictures for the details. |
Thursday, May 07, 2015, 11:02, Travis Cave, South Hot-Cell, Repair, TM2, No target, Wiring of TM#2
|
Wires in TM#2 have been terminated at the top of the module. |
Wednesday, November 27, 2013, 15:24, Bevan Moss, South Hot-Cell, Maintenance, TM3, , Wiring Harness Electrical Test
|
Maico removed the containment box today allow Travis and I to further test the wiring harness. I disconnected the junction block and Travis and I repeated the test from yesterday. The all lines except the PNG tested OL. The module was then lowered and the twisted pair connected to the pin that corresponds to the steerer labeled BTM (it is likely this is not labeled correctly). This testing showed showed that the source of the short found yesterday is in the wiring harness or the source tray. The PNG gauge was then tested again. When beeping out the harness to find the location of the pin it was found that the short had gone away. This circuit was then tested with the megger at 500V and showed OL. Don Jackson has suggested looking at the SHV feed through. It is difficult to determine where the source of the problem is as it is intermittent. The source tray side wiring harness for the steerers was then disconnected from the steerers and tested to OL. Finally the connections on the source tray were tested. It was determined that the third socket down (see attached picture) has a short somewhere to ground. When Chad returns on Friday I will have him complete a visual inspection and if the source can be found we may be able to deflect the line. Failing that to repair this connection a new steerer cone assembly will need to be installed. |
Wednesday, April 30, 2014, 12:03, Travis Cave, Spent Target Vault, Standard Operation, , 2A3 window, Window now in vault
|
The 2A3 window now has a lid, and lift yolk on it and it has been installed in the spent target vault in spot 2A. The lid is a normal unmodified and has no sealant on it. |
Friday, March 24, 2017, 11:19, Keith C Ng, Spent Target Vault, Standard Operation, , 2A3 window, Window now in vault
|
Travis Cave wrote: |
The 2A3 window now has a lid, and lift yolk on it and it has been installed in the spent target vault in spot 2A. The lid is a normal unmodified and has no sealant on it.
|
The pail containing window was transferred from the Storage Vault to the Cyclotron Vault Tunnel Storage 2017 Mar 24. It was placed in a brick bunker along the north wall and marked with item #1434. RPG storage form is attached.
Highest field measured at 0.5 m was 3000 uSv/h with an estimate of 4000 uSv/h on contact with the pail. Pail exterior was not contaminated. See attached storage form for details.
|
Tuesday, September 25, 2018, 08:48, chad fisher, South Hot-Cell, Maintenance, , , Window leak and torque
|
The south hot cell window has been found to be leaking oil. Upon inspection yesterday I found that the bolts compressing the gasket on the cold side were "loose". I have re-torqued them to the specification provided by the manufacturer in the attached procedure. |
Monday, June 04, 2018, 13:27, chad fisher, South Hot-Cell, Repair, TM4, , Window Loop and Shield
|
The tray with window waterline loop and EF Shield has been installed into TM4. |
Friday, January 08, 2016, 09:29, chad fisher, South Hot-Cell, Repair, , , Window Decon
|
Entered the hot cell to perform final decon on the window. Initial swipes this morning were 11000 c.p.m. on 44-2. After decon approximately 100 counts. |
Friday, May 10, 2019, 10:23, chad fisher, South Hot-Cell, Repair, , , West Entrance module wire scanner replacement 
|
West entrance module - visible broken or disconnected wire visible on old/existing wire scanner. Wire scanner removed, new one installed. |
Tuesday, August 10, 2021, 10:16, Adam Newsome, South Hot-Cell, Repair, , , West Entrance Module Move to South Hot Cell
|
The West Entrance Module has been moved to the South Hot Cell for repair. |
Thursday, August 12, 2021, 14:13, Adam Newsome, ITW, Repair, , , West Entrance Module Move to ITW
|
The West Entrance Module has been moved from the South Hot Cell to the West Target Station. |
Thursday, March 16, 2017, 12:24, chad fisher, South Hot-Cell, Maintenance, , , West 'Z' motion cable replacement
|
The west 'Z' motion cable on the east manipulator has successfully been replaced. The job took slightly less than an hour (including inspection of the scissor table hoses) and I received 0.075mSv. Scissor table hoses appear to be fine and also didn't "shed" or flake at all when checked by hand. |
Thursday, September 26, 2013, 14:47, Bevan Moss, Conditioning Station, Maintenance, TM3, NiO#2, Water pumps turned on
|
The water pumps for the conditioning station were turned on at ~11:45. It took longer to start the conditioning station as the air from the leak test had to be bled off and the make up water tank refilled. The valves on the water supply line were closed slightly to make up for the fact the water cooled power supply has been removed. DIF2 was installed by Maico so we can measure the flow in the primary side. |
Thursday, October 31, 2019, 08:49, Anders Mjos, Conditioning Station, Repair, , , Water leak on non-active cooling water circuit
|
Yesterday a leak was discovered in the ISAC-I experimental hall. The leak appears to be at the connection between the evaporator and the return water line. 1 in of water was lost from TCS:TK1. The water is currently valved off to prevent further leakage.
A fault reportt has been submitted to mechanical services - awaiting response.
Friday, November 01, 2019
Leak repaired by Mechanical Services. A brass fitting had cracked and was replaced with a galvanized fitting. |
|