  160   Tuesday, August 14, 2012, 11:16 Travis CaveITWStandard OperationTM1UCx#4module moveTM#1 with UCx#4 has been moved from the
conditioning station to the west target station
move went well.
  
  161   Tuesday, August 14, 2012, 11:16 Travis CaveITWStandard OperationTM1UCx#4module moveTM#1 with UCx#4 moved from the conditioning
to the west target station move went well.
  
  177   Thursday, September 13, 2012, 11:03 Travis CaveSouth Hot-CellStandard OperationTM1UCx#4module moveTM#1 with UCx#4 has been moved from the
west target station to the south hot cell.
Move went well.
  
  179   Friday, September 14, 2012, 10:45 Travis CaveSpent Target VaultStandard Operation UCx#4Spent target moveUCx#4 has been moved from the south hot
cell to the spent target vault. The target
was placed in pail #99 and now resides in
 Vault_Storage_September_14_2012.pdf 
  2363   Thursday, September 08, 2022, 07:20 Frank SongNorth Hot-CellStandard OperationTM2UCx#39electrical check An electrical check was done on NHC
yesterday.
 TM2_with_UCx#39_E_Check.png 
  2364   Thursday, September 08, 2022, 09:06 David WangConditioning StationStandard OperationTM2UCx#39HS line helium pressure test.TM2 with UCX#39 HS line helium pressure
test is done at TCS. 70 psi helium 3minutes.
No leak @0.0XE-9 atm.cc/sec. 
  
  2365   Tuesday, September 13, 2022, 14:10 Frank SongITWStandard OperationTM2UCx#39Module Connection TM2 with UCx#39 is connected in ITW.  TM2_with_UCx#39_connection_in_ITW.png 
  2381   Tuesday, November 01, 2022, 12:37 Frank SongITWStandard OperationTM2UCx#39disconnection TM2 with spent target UCx#39 was
disconnected in ITW then moved to NHC.
 TM2_with_UCx39_disconnection_in_ITW.png 
  2382   Tuesday, November 01, 2022, 12:40 Frank SongNorth Hot-CellStandard OperationTM2UCx#39electrical check TM2 with spent target UCx#39 had
an electric check in NHC.
After UCx 39# target was removed
 electical_check_for_TM2_with_spent_target_UCx39_on_NHC.png 
  2386   Thursday, November 03, 2022, 16:41 Carla BabcockNorth Hot-CellStandard Operation UCx#39Post irradiation inspection UCx#39Did the PIE on UCx#39-IGLIS on Thursday
Nov. 2 2022, couple pictures uploaded to
docushare. Did not remove the target, just
  
  2348   Thursday, July 21, 2022, 10:24 Frank SongNorth Hot-CellStandard OperationTM2UCx#38electrical check A electrical check was done for TM2
with UCx#38
 TM2_with_UCx38_echeck_on_NHC.jpg 
  2349   Tuesday, July 26, 2022, 13:50 Frank SongNorth Hot-CellStandard OperationTM2UCx#38TM2 electrical check with Target and No external Connections A standard electrical check was done
for TM2 after the short issue be fixed.
 TM2_with_UCx38_echeck_on_NHC.jpg 
  2350   Wednesday, July 27, 2022, 08:11 Frank SongITWStandard OperationTM2UCx#38Module Connection TM2 with Target UCx#38 was connected
in ITW.
 TM2_with_UCx38_connection_at_ITW.jpg 
  2352   Friday, July 29, 2022, 12:05 Carla BabcockNorth Hot-CellRepairTM2UCx#38Repair of UCx#38 EE short in ante roomUCx#38 developed a short between the plasma
electrode and the extraction electrode about
30mins after reaching full temperature in
 20220726_111649.jpg20220726_111641.jpg 
  2361   Tuesday, September 06, 2022, 13:58 Frank SongITWStandard OperationTM2UCx#38module disconnection TM2 with Target UCx38 was disconnected
in ITW and moved to NHC
 TM2_with_UCx38_disconnection_in_ITW.png 
  2362   Tuesday, September 06, 2022, 14:05 Frank SongNorth Hot-CellStandard OperationTM2UCx#38electrical check after disconnection  An electrical was done on the NHC
for TM2 with spent Target UCx#38 on
 TM2_electrical_check_on_NHC_with_spent_UCx38_on.png 
  2321   Wednesday, May 18, 2022, 13:52 Frank SongSouth Hot-CellStandard OperationTM4UCx#37electrical check  The TM4 with installed target #UCx37
had been electric checked at SHC. PICs attached.
 1.jpg2.jpg3.jpg 
  2323   Thursday, May 19, 2022, 15:05 Frank SongITEStandard OperationTM4UCx#37UCx#37 P2N connection on TM4 TM4 with UCx#37 was connected in
ITE. Attachment available.
 01_UCx37_P2N_connection_on_TM4.jpg02_UCx37_P2N_connection_on_TM4.jpg03_UCx37_P2N_connection_on_TM4.jpg 
  2333   Tuesday, June 21, 2022, 17:49 Frank SongITEStandard OperationTM4UCx#37TM4 disconnection the module with target UCx37 was
disconnected in ITE.
 TM4_with_UCx#37_disconnection_in_ITE.jpg 
  2335   Tuesday, June 21, 2022, 18:43 Frank SongNorth Hot-CellStandard OperationTM4UCx#37electrical check A p2n target in TM4 was electrical
measured on NHC. see attachment pls.
 p2n_ucx37_electrical_check.jpg 