Wednesday, August 03, 2011, 11:24, Travis Cave, ITW, Standard Operation, TM1, Ta#37, Module move
|
TM#1 with Ta#37 has been moved from the conditioning station to the the west target station, move went well. |
Wednesday, September 14, 2011, 10:32, Travis Cave, Spent Target Vault, Standard Operation, , Ta#37, Spent target move
|
Ta#37 has been moved from the south hot cell into the storage vault. The target is in pail #89 and in spot 6A in the vault. It was 840uSv/hr upon removal from the south hot cell. There are 7 free spots left in the vault. |
Wednesday, September 28, 2011, 09:07, Travis Cave, ITE, Standard Operation, TM4, Ta#36, Move of TM#4 from East target station to south hot cell.
|
Move of TM#4 with Ta#36 from East target station to south hot cell, move went well. |
Wednesday, September 28, 2011, 11:59, Travis Cave, South Hot-Cell, Standard Operation, TM4, no target, TM#4 moved from South Hot Cell to to North East Silo.
|
TM#4 moved from South Hot Cell to to North East Silo, move went well. |
Thursday, September 29, 2011, 11:11, Travis Cave, Spent Target Vault, Standard Operation, , Ta#36, Spent target move
|
The spent Ta#36 has been moved to the storage vault. It was placed in pail #90, and placed into slot 3B, it was 111mSv/hr upon removal from the south hot cell. There are 6 free slots left in the storage vault. |
Monday, October 03, 2011, 11:00, Travis Cave, ITW, Standard Operation, TM1, UCx#2, Move from west station to south hot cell
|
TM#1 with UCx#2 has been moved from the west station to the south hot cell. Move went well. |
Monday, October 03, 2011, 14:52, Travis Cave, South Hot-Cell, Standard Operation, TM1, TaC#1, Electrical check
|
TM#1 with TaC#1 installed passed the electrical test. With a value of 882MOhms that was meggered from the heat shield to the chassis, all other measurements are within spec. |
Tuesday, October 04, 2011, 14:13, Travis Cave, ITW, Standard Operation, TM1, TaC#1, Move ot TM#1
|
Move of TM#1 with the TaC#1 target has been moved from the south hot cell to the west target station. |
Wednesday, October 05, 2011, 09:41, Travis Cave, Spent Target Vault, Standard Operation, , UCx#2, Spent target move
|
The spent UCx #2 target has been moved into storage. It was placed in tray 5A and is in Pail #91, it was 8.91mSv/hr upon removal from the south hot cell. There are 5 free slots left in the storage vault. |
Tuesday, October 25, 2011, 08:47, Travis Cave, South Hot-Cell, Standard Operation, TM4, SiC#26 High Powered, Electrical check
|
TM#4 with SiC#26 HP has been checked electrically it has passed. It was noted that the Megger check of the Oven to Chassis (earth ground) and Oven to 60kV Common is low but will not hinder running, according to Don Jackson. Also yesterday the transition piece that sits on the 55 pin connector was damaged from excessive handling, it was removed and repaired and it now back in place. |
Tuesday, October 25, 2011, 11:58, Travis Cave, South Hot-Cell, Standard Operation, TM4, SiC#26 High Powered, Module move
|
TM#4 with SiC#26 HP has been moved from the south hot cell to the conditioning station. |
Friday, October 28, 2011, 08:24, Travis Cave, Conditioning Station, Standard Operation, TM4, SiC#26 High Powered, Module move
|
TM#4 moved from conditioning station to south hot cell. For further leak checking. |
Monday, October 31, 2011, 08:51, Travis Cave, South Hot-Cell, Standard Operation, TM4, SiC#26 High Powered, Module move
|
TM#4 with SiC#26 HP moved from the south hot cell to the conditioning station. |
Friday, November 04, 2011, 11:12, Travis Cave, Conditioning Station, Standard Operation, TM4, SiC#26 High Powered, Module move
|
TM#4 with SiC#26 HP move from the conditioning station to the East Target Station, move went well. |
Thursday, November 10, 2011, 14:33, Travis Cave, Spent Target Vault, Standard Operation, , , Spent Target Assay
|
For the week of November 7th 2011, four of a possible ten targets that are in storage were assayed. Targets are as follows:
Target General average field @ 1 metre from edge of pail
SiC#24 1.99 mSv/hr
Nb#4 3.89 mSv/hr
Ta#25 4.57 mSv/hr
Ta#37 0.47 mSv/hr
These four are all viable spent targets to be shipped. We still need another couple of days of "UNINTERRUPTED" time to assay the remaining six targets, for us to have enough to make a ship of five to Chalk River. |
Monday, November 14, 2011, 14:07, Travis Cave, ITW, Standard Operation, TM1, TaC#1, Module move
|
TM#1 with TaC#1 from the west target station to the south hot cell. Move went well. |
Tuesday, November 15, 2011, 13:08, Travis Cave, Conditioning Station, Standard Operation, TM1, , Move ot TM#1
|
TM#1 has been moved from the south hot cell to the conditioning station. Move went well. |
Thursday, November 17, 2011, 11:51, Travis Cave, Spent Target Vault, Standard Operation, , TaC#1, Spent target move
|
TaC#1 was moved from the south hot cell to the storage vault. It was placed in pail#92 and put in vault slot 7B. It was 239mSv/hr upon removal from the south hot cell. |
Thursday, November 17, 2011, 11:52, Travis Cave, Conditioning Station, Standard Operation, TM1, no target, Module move
|
TM#1 moved from the conditioning station to the south hot cell. Move went well. |
Friday, November 18, 2011, 09:44, Travis Cave, South Hot-Cell, Standard Operation, TM1, UCx#3, Electrical check
|
Electrical checks of TM#1 with UCx#3 have been completed. They all appear to be with in operational range. All megger checks were done at 500 volts. See attached file for details. |
|