  ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  154   Tuesday, July 31, 2012, 12:50 David WangSouth Hot-CellStandard OperationTM1UC xTM1 heat shield circuit leak check with UC x targetChad and i did a leak check on TM1heat
shield with UCx target on.The circuit are
pumped  down to the bottom leak rate
  
  166   Friday, August 31, 2012, 12:10 chad fisherSouth Hot-CellMaintenance  Hot Cell MaitenanceEntered south hot cell Wednesday and replaced
the pre-filter air filter as well as the
front two light bulbs. Also removed two bags
  
  167   Tuesday, September 04, 2012, 11:11 Travis CaveSouth Hot-CellStandard OperationTM4UO#3module moveTM#4 with UO#3 has been moved from the
east target station to the south hot cell
for a target exchange. The move went well.
  
  168   Tuesday, September 04, 2012, 14:34 David WangSouth Hot-CellStandard OperationTM4NiO #1TM4 heat shield circuit leak check with NiO#1 targetChad and i did a leak check on TM4 heat
shield circuit with new NiO#1 target installed.
It took about 40 mins(much longer than usual)
  
  170   Wednesday, September 05, 2012, 14:36 chad fisherSouth Hot-CellStandard OperationTM4NiO #1UOx removal NiO installationUOx was removed from TM4 yesterday and
NiO#1 installed.
Video was taken.
  
  177   Thursday, September 13, 2012, 11:03 Travis CaveSouth Hot-CellStandard OperationTM1UCx#4module moveTM#1 with UCx#4 has been moved from the
west target station to the south hot cell.
Move went well.
  
  178   Thursday, September 13, 2012, 13:27 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule moveTM#1 has been moved from the south hot
cell to the south west silo. Move went well.
  
  180   Tuesday, September 18, 2012, 09:13 Travis CaveSouth Hot-CellStandard OperationTM1no targetmodule moveTM#1 moved from the south west silo to
the south hot cell, move went well.
  
  181   Tuesday, September 18, 2012, 13:41 David WangSouth Hot-CellStandard OperationTM1Nb#7leak check heat shield circuitChad  and i did a leak check on TM1 heat
shield circuit with new Nb#7 target  installed.
It took about 5 mins pump down  the circuit
  
  182   Tuesday, September 18, 2012, 13:47 chad fisherSouth Hot-CellStandard OperationTM1Nb#7Nb #7 install Cover BaselineNb #7 was installed and tested today.
Inside face of the containment box
cover was cleaned with methanol and a baseline
 IMG_3191.JPGIMG_3192.JPG 
  183   Wednesday, September 19, 2012, 11:23 Travis CaveSouth Hot-CellStandard OperationTM1Nb#7Electrical checkTM#1 with Nb#7 attached was electrically
checked at the south hot cell yesterday,
see attached pdf for details. Some notes
 TM1_Nb7_Elec_chk_SHC.PDF 
  194   Tuesday, October 09, 2012, 13:44 chad fisherSouth Hot-CellStandard OperationTM4UCx#5NiO#1 removal UCx#5 installationNiO#1 was removed this morning.
UCx#5 was inserted into the hot cell
around 1 pm, installed and leak checked and
 IMG_0780[1].JPG 
  203   Tuesday, November 06, 2012, 11:34 chad fisherSouth Hot-CellStandard OperationTM1 Nb#7 RemovalAttached are pre-removal pictures of NB#7
and the inside face of the containment box
cover before cleaning.
 IMG_0797[1].JPGIMG_0798[1].JPGIMG_0799[1].JPG 
  205   Tuesday, November 06, 2012, 14:00 chad fisherSouth Hot-CellStandard OperationTM1TiC#3TiC#3 InstalledTiC#3 sucessfully installed and ready for
leak and electrical check.
  
  206   Wednesday, November 07, 2012, 09:25 Travis CaveSouth Hot-CellStandard OperationTM1TiC#3Electrical checkTM#1 with TiC#3 target has had the electrical
performed on it. See attached PDF for details.
 TM_1_TiC_3_Elec_check_SHC.PDF 
  208   Wednesday, November 07, 2012, 11:09 David WangSouth Hot-CellStandard OperationTM1TiC TM1 heat shield circuit leak check with TiC target at hot cellChad and i did a leak check on TM1(Lp-TiC)
heat shield water circuit at south hot cell.
There is no leak had been found on it. The
  
  210   Thursday, November 08, 2012, 09:37 chad fisherSouth Hot-CellStandard OperationTM1Nb#7Nb#7 AutopsyNb#7 was dismantled and ready for inspection.   
  221   Tuesday, December 04, 2012, 14:20 chad fisherSouth Hot-CellStandard OperationTM4UCx#5UCx#5 RemovalUCx #5 has been removed from TM4. The left
oven leg is indeed broken.
Target has been placed in a pail
  
  222   Wednesday, December 05, 2012, 13:26 Grant MinorSouth Hot-CellStandard OperationTM4N/ATM4 moved from SHC to South West SiloTM4 was successfully moved from the South
Hot Cell to the South-West Silo remotely
by Grant Minor, with help from David Wang
  
  223   Wednesday, December 05, 2012, 15:53 Anders MjosSouth Hot-CellStandard Operation UCx#5Target inspection - target tube brokenThe target was inspected today.
It was found that the target tube
had broken on both sides of the centre block
  