149
|
Wednesday, July 18, 2012, 16:49 |
Grant Minor | South Hot-Cell | Development | | | South Hot Cell Ventilation Alarm Trip | Today (Wednesday July 18th) at around 4:15
pm I was taking a small tour group from
VECC into the Target Hall. In the process |
|
152
|
Tuesday, July 31, 2012, 10:50 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Ta#38 | module move | TM#1 with Ta#38 has been moved from the
west target station to the south hot cell,
no problems with the move. |
|
153
|
Tuesday, July 31, 2012, 12:24 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | UCx#4 | UCx#4 Installed | Starting at 11:00 am and finishing at 12:10
Ucx#4 previous target was removed and UCx#4
installed and leak checked on TM1. |
|
154
|
Tuesday, July 31, 2012, 12:50 |
David Wang | South Hot-Cell | Standard Operation | TM1 | UC x | TM1 heat shield circuit leak check with UC x target | Chad and i did a leak check on TM1heat
shield with UCx target on.The circuit are
pumped down to the bottom leak rate |
|
166
|
Friday, August 31, 2012, 12:10 |
chad fisher | South Hot-Cell | Maintenance | | | Hot Cell Maitenance | Entered south hot cell Wednesday and replaced
the pre-filter air filter as well as the
front two light bulbs. Also removed two bags |
|
167
|
Tuesday, September 04, 2012, 11:11 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UO#3 | module move | TM#4 with UO#3 has been moved from the
east target station to the south hot cell
for a target exchange. The move went well. |
|
168
|
Tuesday, September 04, 2012, 14:34 |
David Wang | South Hot-Cell | Standard Operation | TM4 | NiO #1 | TM4 heat shield circuit leak check with NiO#1 target | Chad and i did a leak check on TM4 heat
shield circuit with new NiO#1 target installed.
It took about 40 mins(much longer than usual) |
|
170
|
Wednesday, September 05, 2012, 14:36 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | NiO #1 | UOx removal NiO installation | UOx was removed from TM4 yesterday and
NiO#1 installed.
Video was taken. |
|
177
|
Thursday, September 13, 2012, 11:03 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | UCx#4 | module move | TM#1 with UCx#4 has been moved from the
west target station to the south hot cell.
Move went well. |
|
178
|
Thursday, September 13, 2012, 13:27 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move | TM#1 has been moved from the south hot
cell to the south west silo. Move went well. |
|
180
|
Tuesday, September 18, 2012, 09:13 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | no target | module move | TM#1 moved from the south west silo to
the south hot cell, move went well. |
|
181
|
Tuesday, September 18, 2012, 13:41 |
David Wang | South Hot-Cell | Standard Operation | TM1 | Nb#7 | leak check heat shield circuit | Chad and i did a leak check on TM1 heat
shield circuit with new Nb#7 target installed.
It took about 5 mins pump down the circuit |
|
182
|
Tuesday, September 18, 2012, 13:47 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Nb#7 | Nb #7 install Cover Baseline | Nb #7 was installed and tested today.
Inside face of the containment box
cover was cleaned with methanol and a baseline |
 |
183
|
Wednesday, September 19, 2012, 11:23 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | Nb#7 | Electrical check | TM#1 with Nb#7 attached was electrically
checked at the south hot cell yesterday,
see attached pdf for details. Some notes |
|
194
|
Tuesday, October 09, 2012, 13:44 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UCx#5 | NiO#1 removal UCx#5 installation | NiO#1 was removed this morning.
UCx#5 was inserted into the hot cell
around 1 pm, installed and leak checked and |
|
203
|
Tuesday, November 06, 2012, 11:34 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | | Nb#7 Removal | Attached are pre-removal pictures of NB#7
and the inside face of the containment box
cover before cleaning. |
![IMG_0797[1].JPG IMG_0797[1].JPG](attachment.png) ![IMG_0798[1].JPG IMG_0798[1].JPG](attachment.png) |
205
|
Tuesday, November 06, 2012, 14:00 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | TiC#3 | TiC#3 Installed | TiC#3 sucessfully installed and ready for
leak and electrical check. |
|
206
|
Wednesday, November 07, 2012, 09:25 |
Travis Cave | South Hot-Cell | Standard Operation | TM1 | TiC#3 | Electrical check | TM#1 with TiC#3 target has had the electrical
performed on it. See attached PDF for details. |
|
208
|
Wednesday, November 07, 2012, 11:09 |
David Wang | South Hot-Cell | Standard Operation | TM1 | TiC | TM1 heat shield circuit leak check with TiC target at hot cell | Chad and i did a leak check on TM1(Lp-TiC)
heat shield water circuit at south hot cell.
There is no leak had been found on it. The |
|
210
|
Thursday, November 08, 2012, 09:37 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Nb#7 | Nb#7 Autopsy | Nb#7 was dismantled and ready for inspection. |
|