ID Date Author Category Type Module Target/Numberdown Subject Text Attachments
  2607   Monday, June 10, 2024, 11:02 Frank SongITWStandard OperationTM4UCx#45shielding blocks transfer 5 shielding blocks have been transferred
from ITE to ITW. 
Doc # 181007
  
  2631   Thursday, July 04, 2024, 11:45 Frank SongITWStandard OperationTM4UCx#45module disconnectionTM4 with spent target UCx#45 was disconnected
in ITW and moved to SHC.
 TM4 move from ITW to SHC is
 TM4_with_Spent_Target_UCx#45_disconnection_in_ITW_2024-07-04.pdf 
  2632   Thursday, July 04, 2024, 13:23 David WangSouth Hot-CellStandard OperationTM4UCx#45electrical check on TM4 UCx#45 target at SHC after operation. electrical check  on TM4 UCx#45 target
at SHC after operation is done.  
see attachment.
 Tm4_UCx_46_at_SHC_after_operatiom.pdf 
  2578   Thursday, May 02, 2024, 14:54 David WangConditioning StationStandard OperationTM3UCx#44TM3 has been moved from SHC to TCS.TM3 has been moved  from SHC to TCS
by David and Frank. The move is smooth. 
  
  2579   Thursday, May 02, 2024, 14:58 David WangSouth Hot-CellStandard OperationTM3UCx#44TM3 with UCx#44 electrical check and leak check.TM3 with UCx#44 electrical check and leak
check are good. see attachment.
HS line 70 psi helium pressure test
 Scanned_from_a_Xerox_Multifunction_Printer_(11).pdf 
  2585   Wednesday, May 08, 2024, 12:36 David WangConditioning StationStandard OperationTM3UCx#44TCS was argon vented this morning between 7:00 to 8:30 am.TCS was argon vented this morning between
7:00 to 8:30 am before module was moved to
ITE.
  
  2586   Wednesday, May 08, 2024, 12:37 David WangITEStandard OperationTM3UCx#44Tm3 has been moved form TCS to ITEThe move is smooth and successful.   
  2589   Friday, May 10, 2024, 09:04 David WangITEStandard OperationTM3UCx#44Tm3 has been connected in ITE. Tm3 has been connected in ITE.  see
attachment.
 Scanned_from_a_Xerox_Multifunction_Printer.pdf 
  2590   Monday, May 13, 2024, 09:28 David WangITEStandard OperationTM4UCx#44ITE water signal annual interlock check.ITE water signal annual interlock check
is done. Ed helped me on this check. Everything
works normal. 
  
  2591   Tuesday, May 14, 2024, 15:27 Carla BabcockITEDevelopmentTM3UCx#44TM3 conditioning and testing in ITETuesday, May 14, 2024, 10:26 :
Ramping up bias/EE/EL on ITE - will
see if the HV cage in the pit can hold 60kV
 Screenshot_from_2024-05-14_10-47-22.png 
  2597   Thursday, May 23, 2024, 10:59 Frank SongITEStandard OperationTM3UCx#44shielding blocks transfer the five shielding blocks have been
moved from storage area to ITE and is ready
for beam delivery.
  
  2610   Friday, June 14, 2024, 11:18 Frank SongITEStandard OperationTM3UCx#44module disconnection TM3 with target UCx#44 was disconnected
in ITE. 
 TM3_with_UCx#44_disconnection_in_ITE_2024-06-14.pdf 
  2611   Friday, June 14, 2024, 11:55 David WangSouth Hot-CellStandard OperationTM3UCx#44TM3 UCx#44 after operation electrical check at SHC TM3 UCx#44 after operation electrical check
at SHC . see attachment.
Carla: Looks like the short on the
 TM3_UCX#44_after_operation_electrical_check.pdf 
  2612   Friday, June 14, 2024, 11:56 David WangITEStandard OperationTM3UCx#44Tm3 has been moved form ITE to SHC.Tm3 has been moved form ITE to SHC. the
move is smooth. 
  
  2615   Monday, June 17, 2024, 17:24 Carla BabcockITEDevelopmentTM3UCx#44Status of gas system prototype in ITEA new gas system for FEBIAD operation was
installed in ITE to enable us to use a calibrated
leak which is attached to the target heat
 schematic_pumpinggaslines_detailed.png 
  2622   Monday, June 24, 2024, 14:37 Carla BabcockSouth Hot-CellDevelopmentTM3UCx#44Inspection of TM3 and UCx#44 after no-protons runTM3 and UCx#44 ran in ITE but issues with
the cyclotron prevented proton beam delivery.
Nonetheless, the target was heated and provided
 MicrosoftTeams-image_(61).pngMicrosoftTeams-image_(62).pngMicrosoftTeams-image_(60).pngMicrosoftTeams-image_(63).png 
  2500   Wednesday, November 08, 2023, 12:14 Frank SongSouth Hot-CellStandard OperationTM4UCx#43electrical check/leak check TM4 with new target UCx#43 was electrical
and leak checked on SHC.
 TM4_electric_and_leak_checked_after_UCx#43_installed_2023-11-08.pdf 
  2519   Wednesday, January 10, 2024, 16:51 Carla BabcockITEStandard OperationTM4UCx#43UCx#43 failure To deliver stable beam to RadMol,
started heating UCx#43 up again. Target was
overheated during initial conditioning in
  
  2528   Monday, January 22, 2024, 14:12 Frank SongITEStandard OperationTM4UCx#43module disconnection TM4 with spent target UCx#43 was
disconnected in ITE and is ready moved to
SHC. see attachment pls.
 TM4_with_UCx43_disconnected_in_ITE_2024-01-22.pdf 
  2529   Wednesday, January 24, 2024, 08:34 chad fisherSouth Hot-CellRepairTM4UCx#43Plating and coating from UCx#43 failureTM4 has seen significant coating of the
main standoff insulators and various other
components stemming from failure in UCx#43
 IMG_2464.jpgIMG_2465.jpgIMG_2470.jpgIMG_2471.jpgIMG_2472.jpg 