938
|
Wednesday, June 10, 2015, 10:02 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#31 | Module moved | TM#4 has been moved from the conditioning
station to the east target station. |
|
939
|
Wednesday, June 10, 2015, 11:49 |
David Wang | ITE | Standard Operation | TM4 | SiC #31 | TM4 has been connected in ITE | Dan and I connected TM4 in ITE. At this
stage, water is supplied to TM4 only. We
checked the TM4 water signals from electrical |
|
954
|
Friday, June 19, 2015, 11:52 |
David Wang | ITE | Standard Operation | TM4 | SiC #31 | 5 Shielding blocks have been transferred from ITW to ITE. | 5 shielding blocks have been transferred
from ITW to ITE. The ITE is configured to
take proton beam. |
|
1013
|
Monday, July 27, 2015, 12:12 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#31 | Electrical Check | Electrical check of TM#4 post beam with
target (SiC#31) on and module without target
on. There is a short between the target and |
|
1014
|
Monday, July 27, 2015, 13:38 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#13 | Electrical Check | Electrical check of TM#4 with UC#13 at
the south hot cell. See PDF for details. |
|
1015
|
Monday, July 27, 2015, 14:37 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#13 | Module moved | TM#4 has been moved from the east target
station (morning with SiC#31), and moved
to the conditioning station from the south |
|
1016
|
Monday, July 27, 2015, 15:34 |
David Wang | ITE | Standard Operation | TM4 | | Leak check on TM4 HS water line with new UCX target. at SHC | Chad and I leak checked the HS line at
SHC after UCX target installation. On first
round helium spray, one of VCR fitting has |
|
1018
|
Monday, July 27, 2015, 17:03 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx 13 | UCx13 and TM4 under vacuum at CS. | I connected the CS vacuum system
to TM4. The CS and TM4 turbo pumps are started.
Everything is good so far. The HS line will |
|
1019
|
Tuesday, July 28, 2015, 10:12 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx 13 | Helium pressure test on TM4 HS line at CS | I did the helium pressure test on TM4 HS
line at CS. Applied 70 psi helium 2
minutes. base leak rate0.0x E-9 atm.cc/sec. |
|
1021
|
Tuesday, July 28, 2015, 14:31 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UC#13 | Electrical Check | TM#4 with UC#13 electrical check at the
conditioning station under vacuum. See attached
PDF. |
|
1022
|
Tuesday, July 28, 2015, 14:36 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | SiC#31 | SiC#31 Autopsy | Extraction electrode was removed from SiC#31
and target inspected.
Pictures of findings can be found |
|
1023
|
Tuesday, July 28, 2015, 14:40 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | SiC#31 UCx#13 | SiC#31 removed UCx#13 installed | SiC#31 has been removed from TM4 and UCx#13
installed. UCx#13 connection to the 9 pin
connector was VERY VERY tight to the tube |
|
1024
|
Wednesday, July 29, 2015, 06:24 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx 13 | Stopped the CS and TM4 pumps and vent with argon. | Dan and I stopped the CS and TM4 pumps.
We are venting the CS with argon for UCX13
target. |
|
1025
|
Wednesday, July 29, 2015, 08:59 |
Travis Cave | ITE | Standard Operation | TM4 | UC#13 | Module moved | TM#4 with UC#13 has been moved from the
conditioning station to the east target station. |
|
1026
|
Wednesday, July 29, 2015, 10:14 |
David Wang | ITE | Standard Operation | TM4 | | TM4 has been connected in ITE | Dan and I connected TM4 in ITE. We checked
all water signals on ITE cooling circuits.
Everything is good. |
|
1072
|
Tuesday, September 22, 2015, 11:12 |
Travis Cave | ITE | Standard Operation | TM4 | UC#13 | Module moved | TM#4 with UC#13 has been moved from the
east target station to the south hot cell. |
|
1073
|
Tuesday, September 22, 2015, 11:35 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UC#13 | Electrical Check | TM#4 with UC#13 post beam electrical check.
Also and electrical check was done without
the target on. |
|
1074
|
Tuesday, September 22, 2015, 11:39 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | Ta#46 | Electrical Check | TM#4 electrical check with Ta#46 attached. |
|
1076
|
Wednesday, September 23, 2015, 08:38 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#46 | Module moved | TM#4 with Ta#46 has been moved from the
south hot cell to the conditioning station. |
|
1077
|
Wednesday, September 23, 2015, 13:56 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | Ta#46 | Electrical Check | TM#4 electrical check at the conditioning
station with Ta#46 target. |
|