Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 13 of 138  Not logged in ELOG logo
  ID Date Author Category Type Module Target/Number Subjectdown
  2464   Tuesday, July 18, 2023, 10:08 Frank SongNorth Hot-CellStandard OperationTM4SiC#45module disconnection & electrical check right after transferred from ITE to NHC

 TM4 with spent target SiC#45 was disconnected ITE  and an electrical check made right after moved on NHC. 

Attachment 1: TM4_with_SiC45_disconnection_and_e_check.pdf
TM4_with_SiC45_disconnection_and_e_check.pdf TM4_with_SiC45_disconnection_and_e_check.pdf TM4_with_SiC45_disconnection_and_e_check.pdf TM4_with_SiC45_disconnection_and_e_check.pdf
  2254   Monday, October 04, 2021, 09:37 Frank SongITEStandard OperationTM4Sic#41module disconnection

 TM4 was disconnected and moved to NHC. 

Attachment 1: IMG_3715.jpg
IMG_3715.jpg
Attachment 2: IMG_3716.jpg
IMG_3716.jpg
Attachment 3: IMG_3717.jpg
IMG_3717.jpg
  2262   Tuesday, November 09, 2021, 09:58 Frank SongITWStandard OperationTM2C#3module disconnection

 the module TM2 with target C#3 was disconnected at ITW and is being remoted moving to SHC.

Attachment 1: IMG_4315.jpg
IMG_4315.jpg
  2273   Tuesday, November 23, 2021, 10:46 Frank SongITEStandard OperationTM4UCx#35module disconnection

 the TM4 with UCx#35 was disconnected in ITE.

Attachment 1: IMG_4456_(2).JPG
IMG_4456_(2).JPG
  2326   Wednesday, May 25, 2022, 13:43 Frank SongITWStandard OperationTM2Febiad-Testmodule disconnection

 TM2 with a test target was disconnected in ITW.

Attachment 1: tm2_disconnection.jpg
tm2_disconnection.jpg
  2361   Tuesday, September 06, 2022, 13:58 Frank SongITWStandard OperationTM2UCx#38module disconnection

 TM2 with Target UCx38 was disconnected in ITW and moved to NHC

Attachment 1: TM2_with_UCx38_disconnection_in_ITW.png
TM2_with_UCx38_disconnection_in_ITW.png
  2370   Monday, October 03, 2022, 09:42 Frank SongITEStandard OperationTM4Sic#44module disconnection

 TM4 with SiC@44 was disconnected in ITE.

Attachment 1: TM4_with_SiC#44_disconnected_in_ITE.png
TM4_with_SiC#44_disconnected_in_ITE.png
  2388   Tuesday, November 22, 2022, 09:44 Frank SongITEStandard OperationTM4C#4module disconnection

TM4 with C#4 was disconnected in ITE

Attachment 1: TM4_with_C#4_disconnected_in_ITE.png
TM4_with_C#4_disconnected_in_ITE.png
  2455   Tuesday, June 13, 2023, 09:55 Frank SongITEStandard OperationTM4TiC#5module disconnection

 TM4 with TiC#5 was disconnected in ITE and moved to NHC.

Attachment 1: TM4_with_TiC#5_(FEBIAD)disconnected_in_ITE_20230613.pdf
TM4_with_TiC#5_(FEBIAD)disconnected_in_ITE_20230613.pdf TM4_with_TiC#5_(FEBIAD)disconnected_in_ITE_20230613.pdf TM4_with_TiC#5_(FEBIAD)disconnected_in_ITE_20230613.pdf
  2479   Friday, August 25, 2023, 07:22 Frank SongITWRepairTM2Nb#10module disconnection

 TM2 with target Nb#10 was disconnected in ITW yesterday for beam production issue investigation.

Attachment 1: TM2_with_Nb#10_disconnection_at_ITW_2023-08-24.pdf
TM2_with_Nb#10_disconnection_at_ITW_2023-08-24.pdf TM2_with_Nb#10_disconnection_at_ITW_2023-08-24.pdf TM2_with_Nb#10_disconnection_at_ITW_2023-08-24.pdf
  2483   Tuesday, August 29, 2023, 09:33 Frank SongITEStandard OperationTM4UCx#42module disconnection

 TM4 with spent target UCx#42 was disconnected in ITE and has been remote moved to NHC this morning.

Attachment 1: TM4_with_UCx42_Disconnection_in_ITE_2023-08-29.pdf
TM4_with_UCx42_Disconnection_in_ITE_2023-08-29.pdf TM4_with_UCx42_Disconnection_in_ITE_2023-08-29.pdf TM4_with_UCx42_Disconnection_in_ITE_2023-08-29.pdf
  2490   Tuesday, October 03, 2023, 07:56 Frank SongITWStandard OperationTM2Nb#11module disconnection

 TM2 with target Nb#11 has been disconneted in ITW. The HS line was purged with Nitrogen in station. 

Attachment 1: TM2_with_Nb#11_Disconnection_in_ITW_2023-10-03.pdf
TM2_with_Nb#11_Disconnection_in_ITW_2023-10-03.pdf TM2_with_Nb#11_Disconnection_in_ITW_2023-10-03.pdf TM2_with_Nb#11_Disconnection_in_ITW_2023-10-03.pdf
  2499   Tuesday, November 07, 2023, 13:55 Frank SongITEStandard OperationTM4Ta#65module disconnection

TM4 with spent target Ta#65 was disconnected in ITE and moved to SHC.

Attachment 1: TM4_with_Spent_Target_Ta#65_disconnection_in_ITE_2023-11-07.pdf
TM4_with_Spent_Target_Ta#65_disconnection_in_ITE_2023-11-07.pdf TM4_with_Spent_Target_Ta#65_disconnection_in_ITE_2023-11-07.pdf TM4_with_Spent_Target_Ta#65_disconnection_in_ITE_2023-11-07.pdf
  2528   Monday, January 22, 2024, 14:12 Frank SongITEStandard OperationTM4UCx#43module disconnection

 TM4 with spent target UCx#43 was disconnected in ITE and is ready moved to SHC. see attachment pls.

Attachment 1: TM4_with_UCx43_disconnected_in_ITE_2024-01-22.pdf
TM4_with_UCx43_disconnected_in_ITE_2024-01-22.pdf TM4_with_UCx43_disconnected_in_ITE_2024-01-22.pdf TM4_with_UCx43_disconnected_in_ITE_2024-01-22.pdf
  2610   Friday, June 14, 2024, 11:18 Frank SongITEStandard OperationTM3UCx#44module disconnection

 TM3 with target UCx#44 was disconnected in ITE. 

Attachment 1: TM3_with_UCx#44_disconnection_in_ITE_2024-06-14.pdf
TM3_with_UCx#44_disconnection_in_ITE_2024-06-14.pdf TM3_with_UCx#44_disconnection_in_ITE_2024-06-14.pdf TM3_with_UCx#44_disconnection_in_ITE_2024-06-14.pdf
  2631   Thursday, July 04, 2024, 11:45 Frank SongITWStandard OperationTM4UCx#45module disconnection

TM4 with spent target UCx#45 was disconnected in ITW and moved to SHC.

 TM4 move from ITW to SHC is smooth.

Attachment 1: TM4_with_Spent_Target_UCx#45_disconnection_in_ITW_2024-07-04.pdf
TM4_with_Spent_Target_UCx#45_disconnection_in_ITW_2024-07-04.pdf TM4_with_Spent_Target_UCx#45_disconnection_in_ITW_2024-07-04.pdf TM4_with_Spent_Target_UCx#45_disconnection_in_ITW_2024-07-04.pdf
  2646   Tuesday, August 06, 2024, 09:16 Frank SongITEStandard OperationTM3SiC#46module disconnection

 TM3 with spent target SiC#46 was disconnected in ITE and ready to move to TCS soon.

Attachment 1: TM3_with_SiC#46_disconnection_in_ITE_2024-08-0106.pdf
TM3_with_SiC#46_disconnection_in_ITE_2024-08-0106.pdf TM3_with_SiC#46_disconnection_in_ITE_2024-08-0106.pdf TM3_with_SiC#46_disconnection_in_ITE_2024-08-0106.pdf
  2649   Friday, August 09, 2024, 08:11 Frank SongITWStandard OperationTM4TiC#7module disconnection

 TM4 with spent target TiC#7 (dead) was disconnected in ITW and ready to move to TCS.

Attachment 1: TM4_with_spent_TiC#7_disconnection_in_ITW_20240809.pdf
TM4_with_spent_TiC#7_disconnection_in_ITW_20240809.pdf TM4_with_spent_TiC#7_disconnection_in_ITW_20240809.pdf TM4_with_spent_TiC#7_disconnection_in_ITW_20240809.pdf
  2671   Tuesday, August 27, 2024, 13:30 Frank SongITWMaintenanceTM3TiC#8module disconnection

 TM3 is disconnected and all water lines are purged/refilled with 50psi Nitrogen. Pls see pics attached with.

Attachment 1: TM3_with_TiC#8_disconnection_in_ITW_2024-08-27.pdf
TM3_with_TiC#8_disconnection_in_ITW_2024-08-27.pdf TM3_with_TiC#8_disconnection_in_ITW_2024-08-27.pdf TM3_with_TiC#8_disconnection_in_ITW_2024-08-27.pdf
  2695   Tuesday, October 01, 2024, 09:16 Frank SongITEStandard OperationTM2Ta#67module disconnection

 TM2 with spent target Ta#67 was disconnected in ITE. see attachment pls.

Attachment 1: TM2_with_spent_target_Ta#67_disconnection_in_ITE_2024-10-01.pdf
TM2_with_spent_target_Ta#67_disconnection_in_ITE_2024-10-01.pdf TM2_with_spent_target_Ta#67_disconnection_in_ITE_2024-10-01.pdf TM2_with_spent_target_Ta#67_disconnection_in_ITE_2024-10-01.pdf
ELOG V2.9.2-2455