2714
|
Friday, November 08, 2024, 10:39 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#9 | Spent Target Move | TiC#9 was placed in Pail 299 in spot
8A of the vault and was 92.1mSv/hr when removed
from the south hot cell. See attached pdf |
|
2716
|
Friday, November 08, 2024, 10:54 |
Aaron Tam | South Hot-Cell | Standard Operation | | TiC#9 | TiC#9 Pail Loading into Pail#299 | Nov. 8, 2024 - Aaron Tam
Tong cable snapped when attempting
to remove multipin connector bracket |
|
2718
|
Monday, November 18, 2024, 12:18 |
Aaron Tam | South Hot-Cell | Repair | | | SHC West Manipulator Repair | November 14, 2024 - Aaron Tam w/
Chad Fisher
Following ID: |
|
2724
|
Thursday, November 28, 2024, 16:13 |
Aaron Tam | South Hot-Cell | Standard Operation | | TiC#9 Parasitics | TiC#9 Parasitics Leak Check and removal from hotcell | November 27th, 2024 - Aaron Tam with
Farran & David
Parasitic Assembly Leak Check (Aaron, |
    |
2732
|
Wednesday, December 04, 2024, 14:30 |
Aaron Tam | South Hot-Cell | Standard Operation | | Ta#68 | Ta#68 PIE | Abstract:
This target has seen some irregular
beam patterns |
32x |
2733
|
Thursday, December 05, 2024, 11:43 |
Aaron Tam | South Hot-Cell | Standard Operation | | Ta#68 | Pail loading - Ta#68 & Others into Pail#300 | December 5, 2024 - Aaron Tam w/ help from
Chad, Peter and Adam at the Crane
Hot Cell Prep: |
    |
2734
|
Thursday, December 05, 2024, 12:00 |
Adam Newsome | Spent Target Vault | Standard Operation | | Ta#68 | Spent target move - Ta#68 in Pail 300 | Ta#68 spent target was moved in Pail 300
to storage vault location 5A. The dose rate
measured at the South Hot Cell was 429 mSv/h |
|
2736
|
Wednesday, December 18, 2024, 12:18 |
Adam Newsome | Spent Target Vault | Standard Operation | | | Five Pails Transferred from Main Vault to Mini Vault | Five pails were transferred from main vault
to mini vault. Note that there was already
one pail in the mini vault, so at present |
|
2737
|
Wednesday, December 18, 2024, 14:17 |
Adam Newsome | Pail Handling Tool | Maintenance | | | Pail Handling Tool - Inspection | An informal inspection of the main Pail
Handling Tool was performed today as the
final one for the year. Note that the main |
|
2738
|
Friday, January 03, 2025, 09:59 |
Adam Newsome | Facilities | Standard Operation | | | Safety Walkaround complete - ISAC Hot Cells, Target Hall | A safety walkaround was completed for the
ISAC Hot Cells and Target Hall Areas.
The resulting spreadsheet can be |
|
2740
|
Friday, January 03, 2025, 12:34 |
Frank Song | 5 Shielding Blocks | Maintenance | | UCx#47 | shielding blocks moving | Five shielding blocks are moved from
ITE to storage area ( one of them is sitting
on B2 as limit of room) for target stations |
|
2744
|
Thursday, January 09, 2025, 11:08 |
David Wang | Facilities | Maintenance | | | ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readings | ITH:MP1 is deteriorating by watching on
ITH:CG1 and CG2 readings and investigation
in pit. A fault 17644 has been issued. this |
|
2746
|
Monday, January 13, 2025, 10:02 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#46 | Spent Target Move | UC#46 was placed in pail# 301 in spot 1B and
was 26.3mSv/hr when removed from the SHC.
See attached PDF for vault
|
|
2749
|
Thursday, January 16, 2025, 10:03 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#47 | Spent Target Move | The spent UC#47 was moved from the
south hot cell to the spent target vault
placed in pail #302 in spot 1C of the vault, |
|
2751
|
Monday, January 20, 2025, 11:33 |
Adam Newsome | Waste Package/Ship | Standard Operation | | | F-308 flask loading - six flasks loaded | Today (2025-01-20), six flasks were loaded
in preparation for shipment with the following
targets: C#4, TiC#5, Ta#64,Ta#62, Nb#10, |
|
2752
|
Tuesday, January 21, 2025, 10:46 |
David Wang | ITE/ITW | Standard Operation | | | ITW/ITE pit general annual cleaning up. | ITW/ITE pit general annual cleaning up
were done. all concrete floor and TM equipment
surface are vacuum cleaned. HV cage |
|
2753
|
Wednesday, January 22, 2025, 10:29 |
Frank Song | Faraday Cage | Maintenance | | | Annual clean up for ITE/ITW Faraday cages | David and I cleaned both cages in
ISAC1 electric room, all done. |
|
2754
|
Monday, January 27, 2025, 08:27 |
om David Wang | South Hot-Cell | Maintenance | | parasite target | Transfer parasite target from SHC to NHC. | A parasite target has been transferred
from SHC to NHC. It is a job to reduce SHC
field for coming SHC entry job. The transfer |
|
2756
|
Wednesday, January 29, 2025, 09:06 |
David Wang | ITE/ITW | Standard Operation | | | ITE and ITW water system paddle wheels and coils on flow sensors have been replaced | ITE and ITW water system paddle wheels
and coils on all flow sensors in pits have
been replaced. It's a SAS job. |
|
2757
|
Wednesday, January 29, 2025, 11:10 |
chad fisher | South Hot-Cell | Standard Operation | | | Pre-entry field Check | Fields in the hot cell were checked using
a pole monitor. Field approximately in the
area someone would stand to repair manip. |
|