ID Date Author Category Type Moduledown Target/Number Subject Text Attachments
  2714   Friday, November 08, 2024, 10:39 Travis CaveSpent Target VaultStandard Operation TiC#9Spent Target Move TiC#9 was placed in Pail 299 in spot
8A of the vault and was 92.1mSv/hr when removed
from the south hot cell. See attached pdf
 Target_Index_2024-11-08.pdf 
  2716   Friday, November 08, 2024, 10:54 Aaron TamSouth Hot-CellStandard Operation TiC#9TiC#9 Pail Loading into Pail#299 Nov. 8, 2024 - Aaron Tam 
Tong cable snapped when attempting
to remove multipin connector bracket 
  
  2718   Monday, November 18, 2024, 12:18 Aaron TamSouth Hot-CellRepair  SHC West Manipulator Repair  November 14, 2024 - Aaron Tam w/
Chad Fisher 
Following ID:
  
  2724   Thursday, November 28, 2024, 16:13 Aaron TamSouth Hot-CellStandard Operation TiC#9 ParasiticsTiC#9 Parasitics Leak Check and removal from hotcell November 27th, 2024 - Aaron Tam with
Farran & David 
Parasitic Assembly Leak Check (Aaron,
 Leak_Test.jpgDissassembly.jpgSeal_Seat.jpgPEEK_seal.jpgPEEK_Seal_Closer_look.jpg 
  2732   Wednesday, December 04, 2024, 14:30 Aaron TamSouth Hot-CellStandard Operation Ta#68Ta#68 PIE Abstract:
This target has seen some irregular
beam patterns 
 32x 
  2733   Thursday, December 05, 2024, 11:43 Aaron TamSouth Hot-CellStandard Operation Ta#68 Pail loading - Ta#68 & Others into Pail#300December 5, 2024 - Aaron Tam w/ help from
Chad, Peter and Adam at the Crane  
Hot Cell Prep:
 Pail_Landing.jpgLoaded_Pail.jpgParasitic_Lid_that_was_missed.jpgLocation_of_all_parasitic_type_targets_and_fasteners.jpgParastics_and_Target_stuff_that_went_inside_this_pail.jpg 
  2734   Thursday, December 05, 2024, 12:00 Adam NewsomeSpent Target VaultStandard Operation Ta#68Spent target move - Ta#68 in Pail 300Ta#68 spent target was moved in Pail 300
to storage vault location 5A. The dose rate
measured at the South Hot Cell was 429 mSv/h
 Storage_Vault_Contents_2024-12-05.pdf 
  2736   Wednesday, December 18, 2024, 12:18 Adam NewsomeSpent Target VaultStandard Operation  Five Pails Transferred from Main Vault to Mini VaultFive pails were transferred from main vault
to mini vault. Note that there was already
one pail in the mini vault, so at present
 MiniVault_2024-12-18.pdf 
  2737   Wednesday, December 18, 2024, 14:17 Adam NewsomePail Handling ToolMaintenance  Pail Handling Tool - InspectionAn informal inspection of the main Pail
Handling Tool was performed today as the
final one for the year. Note that the main
 ISAC_Pail_Handling_Tool_Inspection_Record_-_2024.pdf 
  2738   Friday, January 03, 2025, 09:59 Adam NewsomeFacilitiesStandard Operation  Safety Walkaround complete - ISAC Hot Cells, Target HallA safety walkaround was completed for the
ISAC Hot Cells and Target Hall Areas.
The resulting spreadsheet can be
  
  2740   Friday, January 03, 2025, 12:34 Frank Song5 Shielding BlocksMaintenance UCx#47shielding blocks moving Five shielding blocks are moved from
ITE to storage area ( one of them is sitting
on B2 as limit of room) for target stations
  
  2744   Thursday, January 09, 2025, 11:08 David WangFacilitiesMaintenance  ITH:MP1 is deteriorating by watching on ITH:CG1 and CG2 readingsITH:MP1 is deteriorating by watching on
ITH:CG1 and CG2 readings and investigation
in pit. A fault 17644 has been issued. this
  
  2746   Monday, January 13, 2025, 10:02 Travis CaveSpent Target VaultStandard Operation UC#46Spent Target MoveUC#46 was placed in pail# 301 in spot 1B and
was 26.3mSv/hr when removed from the SHC.
See attached PDF for vault 
 Target_Index_2025-01-13.pdf 
  2749   Thursday, January 16, 2025, 10:03 Travis CaveSpent Target VaultStandard Operation UC#47Spent Target Move The spent UC#47 was moved from the
south hot cell to the spent target vault
placed in pail #302 in spot 1C of the vault,
 Target_Index_2025-01-16.pdf 
  2751   Monday, January 20, 2025, 11:33 Adam NewsomeWaste Package/ShipStandard Operation   F-308 flask loading - six flasks loaded Today (2025-01-20), six flasks were loaded
in preparation for   shipment with the following
targets: C#4, TiC#5, Ta#64,Ta#62, Nb#10,
 Target_Index_2025-01-20.xlsm 
  2752   Tuesday, January 21, 2025, 10:46 David WangITE/ITWStandard Operation  ITW/ITE pit general annual cleaning up.ITW/ITE pit general annual cleaning up
were done. all concrete floor and TM equipment
surface are vacuum  cleaned. HV cage
  
  2753   Wednesday, January 22, 2025, 10:29 Frank SongFaraday CageMaintenance  Annual clean up for ITE/ITW Faraday cages  David and I cleaned both cages in
ISAC1 electric room, all done.
  
  2754   Monday, January 27, 2025, 08:27 om David WangSouth Hot-CellMaintenance parasite targetTransfer parasite target from SHC to NHC.A parasite target has been transferred
from SHC to NHC. It is a job to reduce SHC
field for coming SHC entry job. The transfer
  
  2756   Wednesday, January 29, 2025, 09:06 David WangITE/ITWStandard Operation  ITE and ITW water system paddle wheels and coils on flow sensors have been replacedITE and ITW water system paddle wheels
and coils on all flow sensors in pits have
been replaced. It's a SAS job. 
  
  2757   Wednesday, January 29, 2025, 11:10 chad fisherSouth Hot-CellStandard Operation  Pre-entry field CheckFields in the hot cell were checked using
a pole monitor. Field approximately in the
area someone would stand to repair manip.
 Image_(1).jpg 