Entry  Thursday, February 18, 2021, 12:59, David Wang, Assembly/Bench Test, Maintenance, , , TM3 source tray and old resin can storage in lower cyclotron basement 
TM3 old source tray, old target hall high active water resin tank, and  old 2A window RH clamp are transferred from TH to cyclotron lower vault
basement 10 and 10A location for storage. They are placed beside and in front of old TM1 and TM2 source tray boxes which stored there in 2018.  
Entry  Tuesday, February 23, 2021, 09:00, David Wang, Assembly/Bench Test, Maintenance, , , target staion vacuum pumps inspection. 
Edi and I inspected roughing pump ITM MP1, primary backup pump ITHMP1, and secondary backup pump ITHMP2. We checked oil level and color on all pumps. 
Refilled lubricant to ITMMP1. ITHMP1 and MP2 oil level is fine. ITH MP1 oil color is darker than MP2. But, both them are ok still. Shielding block has
been restored after the job.
Entry  Monday, April 12, 2021, 13:47, Anders Mjos, Assembly/Bench Test, Repair, TM4, , Steerer wiring TM4_Steerers_electric_check.pdf
Travis assembled and tested the steerer wires March 31st (see attached)
Entry  Monday, October 03, 2022, 14:28, Keith C Ng, Assembly/Bench Test, Maintenance, , , ITA2826 rev E assembly 
A fully built steerer sub assembly ITA2826 revision E was boxed and sealed and put on rack storage in ISAC B2 South Hot Cell area. It is contained in
a blue bin and green tag. 
Entry  Tuesday, February 14, 2023, 11:36, David Wang, Assembly/Bench Test, Repair, , , Turbo pump BVs o-ring replacement.  
Five of used  internal leaked  TP BVs are serviced and repaired. Internal plunge  o-ring and case o-ring are replaced on all five BVs.
Leak checked valves after  . They are ok to be used as spare parts.  The are active parts stored in TH now. 
Entry  Friday, April 14, 2023, 10:01, Adam Newsome, Assembly/Bench Test, Repair, , , Assaying Turntable Repair 
The spent target assaying turntable was repaired. It was tested today with a load exceeding the maximum it would need to handle during rotation (100
kg). It works as expected and is ready for operation. 
Entry  Tuesday, June 20, 2023, 12:37, Adam Newsome, Assembly/Bench Test, Development, , , Modifications to wire ropes for pails within existing F-308s 6x
Based on a request from CNL (attached), modifications were made to the wire ropes protruding through the tops of F-308s to add a crimped loop which acts
as a lifting feature. Tests were performed (report attached) on 10 sample units to validate the strength of these loops, since each loop could not be tested
in-situ once the pails were already packed in F-308s. CNL has reviewed and approved the test report.
Entry  Wednesday, March 13, 2024, 11:12, Keith C Ng, Assembly/Bench Test, Repair, TM3, , optics tray for tm3 20240313_optics_tray_alignment_notes.pdf
Alignment notes attached for the optics tray for the refurbished tm3 with the new service and source tray.
 
*Note: Drive screw bracket sheared off during alignment check with source tray. The drive bracket was replaced. The optics tray was re checked.
Entry  Thursday, November 21, 2024, 14:11, Frank Song, 5 Shielding Blocks, Standard Operation, TM4, UCx#46, shielding blocks transfer 
 Shielding blocks have been moved from ITE to ITW and MAA is secured.
Entry  Monday, December 09, 2024, 13:10, Frank Song, 5 Shielding Blocks, Standard Operation, TM3, UCx#47, shielding blocks transfer 
 5 Shielding Blocks have been transferred from ITW to ITE. MAA is secured after moving.
Entry  Friday, January 03, 2025, 12:34, Frank Song, 5 Shielding Blocks, Maintenance, , UCx#47, shielding blocks moving 
 Five shielding blocks are moved from ITE to storage area ( one of them is sitting on B2 as limit of room) for target stations maintenance in 2025
winter shut down .