2635
|
Monday, July 08, 2024, 10:40 |
David Wang | Conditioning Station | Standard Operation | TM4 | TiC#7 | TM4 has been moved from SHC to TCS. | TM4 has been moved from SHC to TCS. The
move is successfully. |
|
2665
|
Monday, August 19, 2024, 09:32 |
David Wang | Conditioning Station | Standard Operation | TM4 | Ta#68 | TM4 has been moved from SHC to TCS. | TM4 has been moved from SHC to TCS. The
move is successful. |
|
2678
|
Wednesday, September 11, 2024, 07:59 |
David Wang | Conditioning Station | Standard Operation | TM4 | TiC#9 | TM4 has been moved from SHC to TCS. | TM4 has been moved from SHC to TCS. The
move is smooth. |
|
2694
|
Friday, September 27, 2024, 07:29 |
David Wang | Conditioning Station | Repair | | | TCS water system resistivity analyzer has been repaired. | TCS water system resistivity analyzer has
been repaired. Two diodes and one capacitor
on PS board were broken. They were replaced. |
|
2708
|
Thursday, October 24, 2024, 10:37 |
David Wang | Conditioning Station | Standard Operation | | | TCS water system functionnal test. | TCS water system has been started for functional
test. System parameters including pressure,
all temperature sensors, flow rate sensors, |
|
2722
|
Tuesday, November 26, 2024, 13:54 |
Adam Newsome | Conditioning Station | Standard Operation | TM3 | | TM3 move - SHC to TCS | TM3 was moved from SHC to TCS with UCx#47.
The move was smooth. |
|
2750
|
Thursday, January 16, 2025, 14:21 |
David Wang | Conditioning Station | Standard Operation | TM3 | No target | TM3 electrical check at TCS under good vacuum | A
complete TM3 electrical check at TCS under
good vacuum has been done. Pin 14 to 60KV |
 |
2755
|
Tuesday, January 28, 2025, 11:47 |
David Wang | Conditioning Station | Standard Operation | TM3 | No target | Tm3 has been moved from TCS to silo. | Tm3 has been moved from TCS to silo.
The move is successful. |
|
2770
|
Friday, February 14, 2025, 11:35 |
David Wang | Conditioning Station | Standard Operation | TM2 | | TM2 TP1/TP2 and TCS TP1S have been started at TCS. | TM2 TP1/TP2 and TCS:TP1S have been started
at TCS. The starting time and operation of
turbo pumps are ok. TM2 had been stored in |
|
2771
|
Tuesday, February 18, 2025, 10:41 |
David Wang | Conditioning Station | Standard Operation | TM3 | No target | TM2 at TCS annual electrical check and water lines helium pressure check . | TM2
has been moved to TCS and under good vacuum.
TP1/2 work fine. Electrical check: |
|
2774
|
Thursday, February 20, 2025, 11:10 |
David Wang | Conditioning Station | Standard Operation | TM2 | No target | TM2 has been moved from TCS to west-south silo. | TM2 has been moved from TCS to west-south
silo. Travis and I did the job. The move
is successful. |
|
2786
|
Thursday, March 20, 2025, 13:10 |
David Wang | Conditioning Station | Standard Operation | | | TCS water system filters annual replacement has been done. | TCS water system filters annual replacement
has been done. Plant group Dan Tower finished
the job and updated the inspection tags . |
|
917
|
Tuesday, May 26, 2015, 11:49 |
Grant Minor | Assembly/Bench Test | Repair | TM2 | | TM2 New Source Tray - Braze & Solder Report - 22 May 2015 | Hello,
For reference, I have attached a list |
6x |
933
|
Thursday, June 04, 2015, 07:44 |
Dan McDonald | Assembly/Bench Test | Development | TM2 | | Movement of TM2 source tray to alignment area in ISAC | Once the test stand was vented and all
lines purged Anders Mjos and myself jigged
up the water blocks and proceeded to remove |
|
934
|
Thursday, June 04, 2015, 08:27 |
chad fisher | Assembly/Bench Test | Repair | TM2 | | TM2 Source Tray C-seal removal and inspection | Source tray for TM2 has been moved to the
alignment area by Dan and co.
This morning Dan removed the c-seals |
    |
935
|
Monday, June 08, 2015, 14:40 |
chad fisher | Assembly/Bench Test | Repair | TM2 | | TM2 Source Tray Final Alignment Check | Final Alignment checks of the TM2 source
tray took place today.
Mater Jig: Front - 0,0 Back - 0 left, |
|
936
|
Tuesday, June 09, 2015, 09:49 |
chad fisher | Assembly/Bench Test | Repair | TM2 | | TM2 Source Tray Final Alignment Check | Final alignment continued this morning.
Steerers have been aligned to 0.001
low, 0.000 left/right wrt master jig. |
|
937
|
Tuesday, June 09, 2015, 14:36 |
chad fisher | Assembly/Bench Test | Repair | TM2 | | TM2 Source Tray Final Inspection | Final inspection took place with Pierre,
Grant, Friedhelm and Anders present.
Two action items were raised: |
    |
941
|
Wednesday, June 10, 2015, 16:49 |
Grant Minor | Assembly/Bench Test | Repair | TM2 | | TM2 New Source Tray - *HOLD* on installation into Hot Cell until HV approval | Don Jackson brought to my attention some
potential HV minimum spark gap issues
with the source tray cooling lines. |
  |
942
|
Thursday, June 11, 2015, 13:11 |
chad fisher | Assembly/Bench Test | Repair | TM2 | | Measurements beyween ground Plane and HV TM2 Source tary | I've taken measurements between HV and
ground circuit on TM2 source tray as instructed.
At their closest points: |
|