2634
|
Friday, July 05, 2024, 14:13 |
Adam Newsome | Waste Package/Ship | Standard Operation | | | F-308 flask loading - five flasks loaded | Today (2024-07-05), five flasks were loaded
in preparation for shipment with the following
targets: SiC#43 (Pail 272), SiC#44 (Pail |
|
|
2636
|
Tuesday, July 09, 2024, 16:14 |
Carla Babcock | ITE | Repair | | | Attempts to reduce ITE:EL trips from HV sparks | ITE:EL has been tripping off due to HV
sparks. Usually this also trips ITE:Q1/2.
These are sitting in side-by-side racks. |
8x |
|
2637
|
Wednesday, July 10, 2024, 09:55 |
Adam Newsome | Safe Module Parking | Maintenance | | | Annual electrical and mechanical inspection of Safe Module Parking | An annual electrical and mechanical inspection
was performed on the SMP today by Adam
Newsome, Travis Cave, Riley Sykes, Maico |
|
|
2638
|
Wednesday, July 10, 2024, 10:44 |
Riley Sykes | South Hot-Cell | Maintenance | | | Spring idler install | New spring idlers were installed
onto rotational chain drive for SHC roof.
Operation ran smoothly in both directions |
|
|
2639
|
Friday, July 12, 2024, 08:51 |
Riley Sykes | Safe Module Parking | Maintenance | | | SMP chain guard | SS washers were added to all slotted
holes on SMP chainguard cover plate |
|
|
2643
|
Wednesday, July 17, 2024, 15:06 |
Adam Newsome | Facilities | Standard Operation | | | Safety Walkaround Complete - SHC/NHC Area | A safety walkaround for July 2024 was completed
for the B2 level by A. Newsome. No deficiencies
to report. |
|
|
2644
|
Thursday, July 18, 2024, 11:22 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#45 | Spent Target Move | The UC#45 target was moved from the
south hot cell to the spent target vault.
It was place in Pail#292 spot 1A of the vault, |
|
|
2645
|
Wednesday, July 24, 2024, 10:10 |
Frank Song | ITE/ITW/Storage Area | Standard Operation | | | shielding blocks transfer | 5 shielding blocks have been transferred
from ITE to ITW. MAA is secured again after
moving. |
|
|
2659
|
Wednesday, August 14, 2024, 11:29 |
Aaron Tam | Waste Package/Ship | Standard Operation | | SiC#46 | Target Disposal and visual check | SiC#46 loaded into pail 293 successfully
along with other hotcell waste
Upon visual inspection of the target, |
|
|
2660
|
Friday, August 16, 2024, 08:47 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#46 | Spent Target Move | SiC#46 (pail 293) was placed in the
vault (spot 3B) on Wednesday the 14th
of August. It was 111 mSv/hr when removed |
|
|
2667
|
Tuesday, August 20, 2024, 11:36 |
Carla Babcock | South Hot-Cell | Standard Operation | | TiC#7 | TiC#7 PIE | TiC#7 failed after two weeks of operations
- measurements in the electrical room indicated
that the negative side of the CHT was broken |
|
|
2668
|
Tuesday, August 20, 2024, 11:53 |
Carla Babcock | South Hot-Cell | Standard Operation | | Nb#10 | Nb#10 PIE | Nb#10 never worked online - repeller had
no effect on the beam and one of the RF wires
was touching HVC. Max 60pA was seen on the |
|
|
2669
|
Wednesday, August 21, 2024, 10:53 |
Travis Cave | Spent Target Vault | Standard Operation | | TiC#7 | Spent Target Move | TIC#7 was placed in pail #294 and
then moved from the south hot cell to the
spent target vault spot 4B. It was 82.3mSv/hr |
|
|
2670
|
Monday, August 26, 2024, 09:57 |
Travis Cave | Spent Target Vault | Standard Operation | | Nb#10 | Spent Target Move | Nb#10 was placed in pail#295 and
moved from the south hot cell to the spent
target vault, spot 4A, it was 230uSv/hr when |
|
|
2673
|
Thursday, September 05, 2024, 12:50 |
Adam Newsome | Crane | Maintenance | | | Overhead crane: up/down hoist delayed start issue | D. Wang reports that recently the overhead
crane has been exhibiting a delayed start
(approx. 1 min) when operating in local mode. |
|
|
2675
|
Friday, September 06, 2024, 14:28 |
Aaron Tam | South Hot-Cell | Standard Operation | | Ta#68(Spare) | Ta#68(Spare) removed from TM4 and into Anteroom | September 5, 2024 -AT
Plastic and clean target
tray added to SHC
TM4 |
|
|
2679
|
Wednesday, September 11, 2024, 13:38 |
Adam Newsome | North Hot-Cell | Repair | | | Spare Manipulator - Y-axis motion not functioning | Update 2024-09-12:
C. Fisher confirms this is actually normal
behaviour. The Y-axis motion is inhibited |
|
|
2680
|
Thursday, September 12, 2024, 14:12 |
Adam Newsome | Waste Package/Ship | Development | | SiC#44 | Failed waste emplacement at CNL: Flask #22, Pail 275 (SiC#44) | On 2024-09-12, CNL reported difficulty
with lowering Pail 275 from F-308 flask #22
into their tile hole. The four other pails |
|
|
2681
|
Monday, September 16, 2024, 08:23 |
chad fisher | North Hot-Cell | Repair | | | Model N Remote end #9352 reapir | On Friday, September 6, 2024 Model 'N'
remote arm #9352 was removed from the NHC
right side installed position to investigate |
|
|
2682
|
Monday, September 16, 2024, 08:48 |
chad fisher | Manipulator Maintenance | Maintenance | | | CRL Technicain Manipulator Maitenance Trip | Over the course of September 9th - September
13, 2024 a CRL manipulator technician carried
out the following manipulator maintenance: |
|