Logbooks Lab Maintenance Evaporator_1 Evaporator_2 Laser cutter Target Production Test-Stand RH-ISAC RH-Cyclotron RH-Meson Hall RH-Beamlines RH-ARIEL
  RH-ISAC, Page 136 of 136  Not logged in ELOG logo
New entries since:Wed Dec 31 16:00:00 1969
Entry  Thursday, June 30, 2011, 16:04, Pierre Bricault, Conditioning Station, Repair, TM1, , TM1 status 

Friday June 24 2011

The target module has been moved to the Conditioning Station (CS)

Pumping overnight

Saturday June 25 2011

Pressure Service Cap (SC) 3E-6 T

Pressure Containment Box (CB) 6.6E-6 T

High voltage test to 40 kV, unfortunately, the pressure is not great so we stop at 40 kV

Pressure at the end of the day: 1650H was, P SC 2.6E-6T

P CB 6.6E-6 T

Sunday June 26 2011

Pressure P SC 1.6E-6T

P CB 6.6E-6 T

It seems we have a leak. The pressure does not drop in the CB over one day.

Today June 27 2011

 Pressure P SC 1.2E-6T

P CB 6.6E-6 T

We leak check the target module and found two leaks, one on the ground electrode and one on the mounting plate cooling circuit.

This is a new one. We had test this line three times before and it was ok.

Action for tomorrow.

After CS vent, 

Move TM1 to SHC

Survey 

Connect LD to Mounting plate cooling circuit

Open Side panel and leak check.

Meeting at 0830H

ELOG V2.9.2-2455