2206
|
Friday, March 26, 2021, 12:22 |
Adam Newsome | Crane | Development | | | Aux Hoist Pendant Upgrade | The crane pendant for the auxiliary hoist
was upgraded to a FLEX EX2 style pendant
by Canco Cranes. The installation work was |
|
2636
|
Tuesday, July 09, 2024, 16:14 |
Carla Babcock | ITE | Repair | | | Attempts to reduce ITE:EL trips from HV sparks | ITE:EL has been tripping off due to HV
sparks. Usually this also trips ITE:Q1/2.
These are sitting in side-by-side racks. |
8x |
1939
|
Monday, June 10, 2019, 18:12 |
Carla Babcock | Conditioning Station | Maintenance | TM4 | No target | Attempt to push bias > 56kV | Monday, June 10, 2019, 16:59 : TM4 back
up to BIAS / EL = 56.1kV / 29.5kV
Monday, June 10, 2019, 17:14 : After |
|
2431
|
Friday, April 14, 2023, 10:01 |
Adam Newsome | Assembly/Bench Test | Repair | | | Assaying Turntable Repair | The spent target assaying turntable was
repaired. It was tested today with a load
exceeding the maximum it would need to handle |
|
1838
|
Friday, December 07, 2018, 10:37 |
chad fisher | North Hot-Cell | Repair | | | Ariel connector test | Completed testing of connectors for Ariel
using the north hot cell.
Video can be found on docushare; |
|
1056
|
Tuesday, September 01, 2015, 06:25 |
David Wang | Conditioning Station | Standard Operation | TM2 | ZrC | Argon venting TM2 at CS | Argon venting TM2 at CS. |
|
2437
|
Wednesday, May 03, 2023, 13:22 |
David Wang | ITE | Standard Operation | | | Argon vented ITE station. | Argon vented ITE station. ITEVV1S and ITGT
SV3 were closed after venting. |
|
218
|
Monday, December 03, 2012, 19:34 |
Grant Minor | ITE | Standard Operation | TM4 | LpUCx | Argon supply opened for ITE vent | Around 7pm tonight I opened the main valve
approximately 1.5 turns on the Argon bottle
used for venting ITE, located in the ISAC |
  |
26
|
Thursday, September 01, 2011, 09:11 |
Don Jackson | ITW | Standard Operation | TM1 | UCx#2 | Argon Venting West Station | West target station is setup to use argon
for tank venting. There is 1200 PSI
remaining on argon bottle in electrical room. |
|
368
|
Monday, May 27, 2013, 16:36 |
Bevan Moss | Conditioning Station | Standard Operation | TM4 | Ta#40 | Argon Venting Started | Argon venting has started. It will
be left to vent over night. |
|
1981
|
Tuesday, September 10, 2019, 08:25 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx27 | Argan vent TCS. | TCS is argon vented. TM4 is disconnected
at TCS. |
|
886
|
Wednesday, April 15, 2015, 09:01 |
Anders Mjos | Conditioning Station | Development | | | Archiver variables added by Controls |
|
|
1314
|
Wednesday, August 10, 2016, 12:18 |
chad fisher | South Hot-Cell | Maintenance | | | Anteroom clearing | Black "radio active" materials
cabinet has been emptied, items bagged and
removed from the anteroom. Cabinet itself |
|
1306
|
Friday, August 05, 2016, 13:50 |
chad fisher | South Hot-Cell | Maintenance | | | Anteroom clean out | Some items have been removed from the anteroom
in preparation for painting. Items have been
placed on plastic in the south hot cell service |
|
1308
|
Monday, August 08, 2016, 11:24 |
chad fisher | South Hot-Cell | Maintenance | | | Anteroom Clean-up - Waveguide | The wave guide from TM3 has been surveyed,
swiped and removed from the anteroom and
transported to rad waste for disposal. The |
|
1330
|
Wednesday, August 24, 2016, 09:19 |
chad fisher | South Hot-Cell | Maintenance | | | Anteroom Clean -up paint prep | Remaining items from anteroom have been
bagged and removed (save the boot boxes,
1 garbage can and 1 coverall garbage can). |
|
441
|
Wednesday, September 04, 2013, 12:21 |
Bevan Moss | South Hot-Cell | Repair | TM3 | | Ante-room work | September 3rd
David Wang and myself lowered the
leak testing cart into the Ante room and |
|
1104
|
Thursday, October 15, 2015, 14:17 |
chad fisher | South Hot-Cell | Repair | TM2 | | Anode Connector Install and adjustment | The TM2 containment box was removed this
morning for installation of the 9 pin connector...connection.
The 9 pin connector copper tube connection |
|
2820
|
Friday, June 20, 2025, 10:46 |
Jason Zhang | Safe Module Parking | Maintenance | | | Annual electrical and mechanical inspection of Safe Module Parking | An annual electrical
and mechanical inspection was performed on |
|
2462
|
Wednesday, June 21, 2023, 14:39 |
Adam Newsome | Safe Module Parking | Maintenance | | | Annual electrical and mechanical inspection of Safe Module Parking | An annual electrical and mechanical inspection
was performed on the SMP today by Adam Newsome,
Travis Cave, Eric Lahe, Maico Dalla Valle, |
  |