  ID Date Author Categorydown Type Module Target/Number Subject Text Attachments
  1966   Friday, August 16, 2019, 08:51 David WangConditioning StationRepairTM4 TM4 waterlines helium pressure test at TCS.LD base leak rate, 0.0Xe-9atm.cc/sec. Helium
pressure, 70psi. 5 minutes each circuit.
No response on all water line except containment
  
  1967   Friday, August 16, 2019, 08:52 David WangConditioning StationStandard OperationTM4 TM4 is moved from TCS to SW silo.TM4 is moved from TCS to SW silo this morning.
The move is good. 
  
  1980   Monday, September 09, 2019, 06:38 David WangConditioning StationStandard OperationTM4UCx27HS and window line leak check.TM4 HS and window line are helium pressure
checked at TCS. 70 psi helium 5 minutes.
No response @1.2XE-8 atm.cc/sec. They are
  
  1981   Tuesday, September 10, 2019, 08:25 David WangConditioning StationStandard OperationTM4UCx27Argan vent TCS.TCS is argon vented. TM4 is disconnected
at TCS. 
  
  1996   Tuesday, October 01, 2019, 16:30 Anders MjosConditioning StationStandard OperationTM2Ta#58Conditioning of Ta#58Tuesday, October 01, 2019, 15:15: Started
roughing.
Tuesday, October 01, 2019, 16:30:
  
  2000   Friday, October 04, 2019, 16:43 David WangConditioning StationStandard OperationTM2 TM2 has been connected at TCS.TM2 has been connected at TCS this morning.
helium pressure test on Tm2 HS line is done.
No leak. 
  
  2019   Thursday, October 31, 2019, 08:49 Anders MjosConditioning StationRepair  Water leak on non-active cooling water circuitYesterday a leak was discovered in the
ISAC-I experimental hall. The leak appears
to be at the connection between the evaporator
  
  2025   Thursday, November 07, 2019, 08:56 David WangConditioning StationStandard OperationTM2SiC#38TM2 in TCS.Helium pressure leak check on TM2 HS line
at TCS is done. No leak. Also, Helium are
sprayed to gas line adapter and fittings.
  
  2026   Thursday, November 07, 2019, 10:39 Anders MjosConditioning StationStandard OperationTM2SiC#38Conditioing SiC#38Thursday, November 07, 2019, 10:35: Tested
source to 30 A on TGHT, TBHT and COIL. ANODE
at 100 V.
 SiC#38_ANODE_bias_2019-11-07.PNG 
  2032   Wednesday, November 27, 2019, 13:46 David WangConditioning StationStandard OperationTM2SiC 38# febiadTM2 SiC #38 disconnection checklist.TM2 was disconnected in ITE yesterday.  SiC_#_38_febiad_disconnection_checklist.pdf 
  2044   Thursday, January 09, 2020, 13:49 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved from the south
west silo to the conditioning station.
  
  2045   Thursday, January 09, 2020, 14:14 David WangConditioning StationStandard OperationTM3 Start of TCS roughing pump for TM3.I started TCS roughing pump. TM3 TP1 and
TP2 will be started tomorrow morning. 
  
  2048   Tuesday, January 14, 2020, 10:12 David WangConditioning StationStandard OperationTM3 Helium spray leak check on TCS.Using a long pole with a probe to spray
helium on TCS vacuum seals and joints which
are installed in  TCS service pit. No
  
  2049   Tuesday, January 14, 2020, 10:19 David WangConditioning StationStandard OperationTM3 TCS vacuum system is switched off. TM3 TP1 and TP2 work  fine in past
4 days. During operation, The current draw
on pumps were 0.7A to 0.8 A. TM3 will be
  
  2050   Thursday, January 16, 2020, 09:37 Travis CaveConditioning StationStandard OperationTM3no targetModule move TM#3 has been moved from the conditioning
station to the centre east silo.
  
  2060   Wednesday, February 05, 2020, 10:49 David WangConditioning StationStandard OperationTM4 Remove of TM4 from SHC to TCS.TM4 has been moved from SHC to TCS. No
target on module. The move is successful.
  
  2061   Wednesday, February 05, 2020, 10:54 David WangConditioning StationStandard OperationTM4 Roughing out TM4 at TCS.TCS MP1 is started to rough out TM4 and
TCS. TCS and TM4 will be under roughing only
today and tomorrow. No plan to start TCS
  
  2066   Friday, February 14, 2020, 11:25 Travis CaveConditioning StationStandard OperationTM4Dummy TargetModule move TM#4 with dummy target has been moved
from the south hot cell to the conditioning
station.
  
  2067   Friday, February 14, 2020, 14:06 David WangConditioning StationStandard OperationTM4 TCS vacuum system and water sytem are switched on.All turbo pumps are started.     
  2070   Wednesday, February 26, 2020, 08:45 David WangConditioning StationStandard OperationTM4 Remove of TM4 from TCS to SW siloTM4 has been moved from TCS to SW silo.
The move is fine. 
  