113
|
Friday, May 25, 2012, 10:48 |
Travis Cave | Spent Target Vault | Standard Operation | | | Moving the spent targets to mini storage. | Five targets were moved to the mini storage
today in preparation for transfer of the
targets to the F308s later next week. The |
|
112
|
Tuesday, May 22, 2012, 15:19 |
David Wang | ITE | Standard Operation | TM4 | sic 27 | TM4 in ITE under pumping |
Normal
0
|
|
111
|
Tuesday, May 22, 2012, 12:36 |
David Wang | ITE | Standard Operation | TM4 | sic 27 | TM4 connection in ITE | All TM4 connections in ITE is done. The
station and TM4 is under roughing now. |
|
110
|
Tuesday, May 22, 2012, 10:50 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#27 | module moved | Module has been moved from conditioning
station to the east target station. Move
went well. |
|
109
|
Tuesday, May 22, 2012, 10:00 |
David Wang | Conditioning Station | Standard Operation | TM4 | sic 27 | helium pressure test on heat shield circuit | I did a helium pressure test on heat shield
circuit. The leak detector is concected to
the TM4 primary vacuum system.The IG1 is |
|
108
|
Tuesday, May 22, 2012, 08:33 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | SiC#27 | Electrical check | Electrical check of TM#4 with SiC#27 under
vacuum at that conditioning station. See
attached PDF for details. |
|
107
|
Friday, May 18, 2012, 08:37 |
David Wang | South Hot-Cell | Standard Operation | TM4 | sic 27 | leak check on heat shield circuit | Chad and I leak checked the heat shield
circuit after sic 27 target installed.
It took 20minutes to pump down |
|
106
|
Friday, May 18, 2012, 08:29 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#27 | Electrical check | TM#4 with SiC#27 has had its electrical
check. See attached PDF for details. |
|
105
|
Friday, May 18, 2012, 08:17 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | SiC#27 | SiC#27 Installed | SiC#27 has been installed onto TM4. Fit
was very good. All electrical connections
double checked with mirror. |
|
104
|
Thursday, May 17, 2012, 14:08 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move | TM#4 has been moved from the north east
silo to the south hot cell for target installation.
No problems with the move. |
|
103
|
Wednesday, May 16, 2012, 10:35 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#26 | Spent target move | SiC #26 was moved from the south hot cell
into storage today. The target was is in
pail # 94 and was placed in slot 1B in the |
|
102
|
Tuesday, May 15, 2012, 14:29 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | no target | module move | TM#4 moved from the south hot cell to the
north east storage silo. No issues with the
move. |
|
101
|
Tuesday, May 15, 2012, 12:14 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | SiC#26 | SiC#26 removal TM4 degredation | SiC#26 was removed from target module #4
this morning. Target shows the now standard
arc marks on the 9 pin connector housing...pictures |
19x |
100
|
Tuesday, May 15, 2012, 11:45 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | SiC#26 | Electrical check | Results of the electrical check of TM#4
with SiC#26 attached post beam. |
|
99
|
Monday, May 14, 2012, 12:37 |
Travis Cave | ITE | Standard Operation | TM4 | SiC#26 | module move | TM#4 with SiC #26 was moved from the East
Station to the South Hot Cell. Bevan was
at the helm of the PLC. There was no issue |
|
98
|
Tuesday, May 08, 2012, 10:28 |
David Wang | ITE | Standard Operation | TM4 | | Disconnected TM4 in ITE. | I disconnected TM4 in ITE. The heat shield
water circuit is purged. I closed the
water supply to ITE.Now, the water system |
|
97
|
Wednesday, May 02, 2012, 11:27 |
David Wang | ITW | Standard Operation | TM1 | | ITW is ready for taking proton beam. | I moved 5 shielding blocks from ITE
to ITW . I checked all ITW water
signals strength and frequency in electrical |
|
96
|
Thursday, April 26, 2012, 13:01 |
David Wang | ITE | Repair | TM4 | | Replaced TM4 EE water flow wheel in ITE. | Due to weak magnetic field on TM4 EE water
flow wheel, we have two times intermittent
water signal on this circuit this morning. |
|
95
|
Thursday, April 26, 2012, 09:23 |
David Wang | ITE | Repair | TM4 | | changed flow wheel on ITE TM4 contaiment box water circuit | The the magnetic field on ITE TM4 flow
wheel was gone yesterday.So there is
no water signal on this circuit. The water |
|
94
|
Tuesday, April 24, 2012, 10:38 |
David Wang | Conditioning Station | Standard Operation | TM1 | LP SIS Nb6 | TM1 heat shield circuit leak check with Nb5 |
Normal
0
|
|