  154   Tuesday, July 31, 2012, 12:50 David WangSouth Hot-CellStandard OperationTM1UC xTM1 heat shield circuit leak check with UC x targetChad and i did a leak check on TM1heat
shield with UCx target on.The circuit are
pumped  down to the bottom leak rate
  
  153   Tuesday, July 31, 2012, 12:24 chad fisherSouth Hot-CellStandard OperationTM1UCx#4UCx#4 InstalledStarting at 11:00 am and finishing at 12:10
Ucx#4 previous target was removed and UCx#4
installed and leak checked on TM1.
  
  152   Tuesday, July 31, 2012, 10:50 Travis CaveSouth Hot-CellStandard OperationTM1Ta#38module moveTM#1 with Ta#38 has been moved from the
west target station to the south hot cell,
no problems with the move.
  
  151   Tuesday, July 31, 2012, 09:52 David WangITWStandard OperationTM1Ta38TM1 disconnected in ITWI disconnected TM1 in ITW.  Heat shield
line has been purged .
  
  150   Thursday, July 26, 2012, 08:33 David WangITEStandard OperationTM4 I moved 5 shielding blocks from ITW to ITE thisTuesday morning .  All water interlock checks for ITE
had been done. The ITE water signals  strength
and frequency(Espcially on MSP circuit) had
  
  149   Wednesday, July 18, 2012, 16:49 Grant MinorSouth Hot-CellDevelopment  South Hot Cell Ventilation Alarm TripToday (Wednesday July 18th) at around 4:15
pm I was taking a small tour  group from
VECC into the Target Hall.  In the process
  
  148   Wednesday, July 18, 2012, 16:49 Grant MinorSouth Hot-CellDevelopment  South Hot Cell Ventilation Alarm TripToday (Wednesday July 18th) at around 4:15
pm I was taking a small tour  group from
VECC into the Target Hall.  In the process
  
  147   Monday, July 16, 2012, 11:55 Bevan MossCraneRepair  Crane has stopped working

    

       
            
  
  146   Friday, July 13, 2012, 16:33 Bevan MossCraneRepair  Crane has stopped workingIn the AM today David and I used the crane
to raise the ground plate sheet metal into
place. This afternoon when I attempted to
  
  145   Monday, July 09, 2012, 16:08 David WangITEStandard OperationTM4UO#3ITM4 in ITE connected and pumping down
 

 Normal
  0

 
   
  
  144   Monday, July 09, 2012, 10:51 Travis CaveITEStandard OperationTM4UO#3module moveTM#4 with UO#3 from the conditioning station
to the east target station. Move went well.
  
  143   Friday, July 06, 2012, 14:38 David WangConditioning StationStandard OperationTM4UO#3TM4 UO#3 target heat shield helium pressure check is done.Connected leak detector to TM4 and CS vacuum
system. The vacuum readings  on TM4 and CS:PNG4
3.6 xE-6 Torr, IG1 2.3xE-6torr, IG4(diagnostic
  
  142   Friday, July 06, 2012, 11:34 Travis CaveSpent Target VaultStandard Operation SiC#27Spent target moveSiC#27 has been moved from the south hot
cell to the spent target vault. Target was
placed in pail #96, placed in slot 3A, the
 Vault_Storage_July_6_2012.pdf 
  141   Friday, July 06, 2012, 09:24 Travis CaveConditioning StationStandard OperationTM4UO#3Electrical checkElectrical check of the target was done
at the conditioning station under vacuum,
see attached file for details.
 TM#4_UO#3_elec_check_under_vac.PDF 
  140   Wednesday, July 04, 2012, 14:16 Travis CaveConditioning StationStandard OperationTM4UO#3module moveTM#4 with UO#3 moved from the south hot
cell to the conditioning station. The fields
of the module at the hot cell was 74.4 mSv/hr.
  
  139   Wednesday, July 04, 2012, 13:18 David WangConditioning StationStandard OperationTM4uo#3leak check on heat shield circuit

    
        

           
  
  
  138   Wednesday, July 04, 2012, 11:33 Travis CaveSouth Hot-CellStandard OperationTM4UO#3Electrical checkElectrical check of TM#4 with  UO#3
attached at the south hot cell see attached
PDF for full results. It has been noted that
 TM#4_UO#3_elec_check.PDF 
  137   Tuesday, July 03, 2012, 12:26 Travis CaveSouth Hot-CellStandard OperationTM4SiC#27module moveTM#4 with SiC#27 moved from the east station
to the south hot cell. Fields at East MAA
were 127mSv/hr and the fields at the south
  
  136   Tuesday, July 03, 2012, 10:50 David WangITEStandard OperationTM4 Disconnected TM4 in ITE.I disconnected TM4 in ITE this morning.
The window circuit and heat shield circuit
had been purged. The general field inside
  
  135   Tuesday, June 26, 2012, 14:10 David WangSouth Hot-CellRepairTM3 TM3 heat shield and window circuits leak check is done.Chad and i did a leak check on TM3 heat
shield and window circuits.Both circuits
are pumped easily down to the bottom leak
  