2357
|
Thursday, August 18, 2022, 10:13 |
Travis Cave | Spent Target Vault | Standard Operation | | Ta#64 | Spent Target Move | The spent Ta#64 target in the north
hot cell has been packaged and placed in
the spent target vault. Pail#273 spot #5C |
|
2360
|
Tuesday, August 23, 2022, 11:33 |
Carla Babcock | ITE | Repair | | | ITE:ANODE swapped with TCS:ANODE | ITE:ANODE supply reading strange currents
- 17mA with the power supply on and no voltage.
Checked anode circuit from electrical room: |
|
2366
|
Wednesday, September 14, 2022, 13:45 |
Adam Newsome | Spent Target Vault | Development | | | Storage Vault: cable replaced and e-chain upgrade | The motor cable for the storage vault was
replaced as the old one was showing signs
of wear. The U-track that the old cable ran |
|
2367
|
Thursday, September 15, 2022, 11:25 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#38 | Spent Target Move | The spent target UC#38 was packed
into pail #274 and placed in spot 1A of the
vault. It was 33.3mSv/hr when removed from |
|
2368
|
Wednesday, September 28, 2022, 12:58 |
Matthew Gareau | North Hot-Cell | Repair | | | Chad repaired the right operator side manipulator | On 26/Sept/2022
Chad disassembled the right operator
side manipulator, and noticed that gears |
|
2369
|
Wednesday, September 28, 2022, 13:15 |
Matthew Gareau | North Hot-Cell | Maintenance | | | topped up the NHC window oil through the oil expansion tank | Myself and Maico were able to top up the
NHC window oil.
The oil was filled through the expansion |
|
2371
|
Monday, October 03, 2022, 14:28 |
Keith C Ng | Assembly/Bench Test | Maintenance | | | ITA2826 rev E assembly | A fully built steerer sub assembly ITA2826
revision E was boxed and sealed and put on
rack storage in ISAC B2 South Hot Cell area. |
|
2375
|
Friday, October 07, 2022, 14:46 |
Adam Newsome | South Hot-Cell | Development | | | Addition of lift table to E-stop circuit | A modification was made to integrate the
hot cell's lift table into the E-stop circuit.
See work permit I2022-10-07-1 |
|
2377
|
Thursday, October 13, 2022, 09:32 |
Travis Cave | Spent Target Vault | Standard Operation | | SiC#44 | Spent Target Move | Spent target move done. The SiC#44
was moved from the north hot cell to the
spent target vault. It was placed in pail#275 |
|
2380
|
Wednesday, October 19, 2022, 12:04 |
Carla Babcock | Conditioning Station | Repair | | | TCS:TBHT taken as replacement for ITE:TBHT | During the last ITE run with the SiC#44
target, the ITE:TBHT controls card was fried
twice. The first time we put in our spare, |
|
2384
|
Thursday, November 03, 2022, 10:08 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#39 | Spent Target Move | The spent UC#39 target (pail #276)
was removed from the north hot cell and place
in the spent target vault (spot 4B) it was |
|
2386
|
Thursday, November 03, 2022, 16:41 |
Carla Babcock | North Hot-Cell | Standard Operation | | UCx#39 | Post irradiation inspection UCx#39 | Did the PIE on UCx#39-IGLIS on Thursday
Nov. 2 2022, couple pictures uploaded to
docushare. Did not remove the target, just |
|
2398
|
Friday, December 16, 2022, 16:35 |
Adam Newsome | Spent Target Vault | Standard Operation | | | Pails measured, moved to mini-storage vault | The following five pails were moved to
the mini-storage vault today under work permit
I2022-12-16-1: |
|
2399
|
Friday, December 16, 2022, 16:39 |
Adam Newsome | Crane | Standard Operation | | | Crane powered off for holidays | [edit 2023-01-03] The crane was powered
back on this morning - there do not appear
to be any faults and it seems that the crane |
|
2400
|
Friday, January 06, 2023, 09:41 |
Adam Newsome | Spent Target Vault | Standard Operation | | | Pails moved to mini-storage vault | The following three pails were moved from
the main storage vault to the mini-storage
vault: |
|
2404
|
Wednesday, January 11, 2023, 11:34 |
Travis Cave | Spent Target Vault | Standard Operation | | UC#40 | Spent Target Move | UC#40 was moved from the north hot
cell to the spent target vault. It was placed
in pail #278 put in spot 1B and was 15.6 |
|
2406
|
Tuesday, January 24, 2023, 07:21 |
David Wang | ITW | Maintenance | | | ITW pit general clean up. | ITW was cleaned with vacuum
canister in Jan 10th. HV cage inside
and blue nylon insulators were wiped. |
|
2407
|
Tuesday, January 24, 2023, 07:26 |
David Wang | Conditioning Station | Standard Operation | | | TH floor moping and garbage collelctions. | Plant group and us finished TH floor
mopping and garbage collections last Wednesday.
Th moping head had 800 count after using. |
|
2411
|
Friday, January 27, 2023, 07:11 |
David Wang | Crane | Standard Operation | | | Target hall Crane annual inspection has beend done. | Tom Kauss inspected target hall crane yesterday.
The crane works fine. Tom has this inspection
record in his file. The inspection tag has |
|
2412
|
Friday, January 27, 2023, 07:15 |
David Wang | Crane | Standard Operation | | | Target hall Crane annual inspection has beend done. | Tom Kauss finished TH crane annual
inspection yesterday. The crane woks fine.
Tom has this inspection record in his file. |
|