1053
|
Wednesday, August 26, 2015, 14:52 |
David Wang | Conditioning Station | Standard Operation | TM2 | ZrC | Helium pressure test on TM2 HS and window lines at CS | LD base LR 0.0xE-9 atm.cc/sec , 80 psi
helium 2 minutes on HS and window circuits.
No leak. Also, the reinstalled(after rewiring |
|
1056
|
Tuesday, September 01, 2015, 06:25 |
David Wang | Conditioning Station | Standard Operation | TM2 | ZrC | Argon venting TM2 at CS | Argon venting TM2 at CS. |
|
1063
|
Tuesday, September 08, 2015, 10:11 |
David Wang | ITW | Standard Operation | TM2 | ZrC | 5 Shielding blocks have been transferred from ITE to ITW. | Maico and Dan moved 5 shielding blocks
from ITE to ITW. The ITW is configured to
take proton beam. |
|
388
|
Thursday, June 27, 2013, 14:21 |
chad fisher | South Hot-Cell | Standard Operation | TM1 | Ucx#6 | Ucx#6 installed Ta#39? rewmoved | Ucx#6 was installed on TM1 on Wednesday.
Ta#39 was removed. |
|
2117
|
Friday, July 03, 2020, 08:46 |
chad fisher | South Hot-Cell | Standard Operation | TM4 | UcX#30 | UCx#30 installed onto tm4 | UCx#30 has been installed onto TM4 with
new high current fasteners torqued to 130
in lbs. |
|
138
|
Wednesday, July 04, 2012, 11:33 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UO#3 | Electrical check | Electrical check of TM#4 with UO#3
attached at the south hot cell see attached
PDF for full results. It has been noted that |
|
140
|
Wednesday, July 04, 2012, 14:16 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UO#3 | module move | TM#4 with UO#3 moved from the south hot
cell to the conditioning station. The fields
of the module at the hot cell was 74.4 mSv/hr. |
|
141
|
Friday, July 06, 2012, 09:24 |
Travis Cave | Conditioning Station | Standard Operation | TM4 | UO#3 | Electrical check | Electrical check of the target was done
at the conditioning station under vacuum,
see attached file for details. |
|
143
|
Friday, July 06, 2012, 14:38 |
David Wang | Conditioning Station | Standard Operation | TM4 | UO#3 | TM4 UO#3 target heat shield helium pressure check is done. | Connected leak detector to TM4 and CS vacuum
system. The vacuum readings on TM4 and CS:PNG4
3.6 xE-6 Torr, IG1 2.3xE-6torr, IG4(diagnostic |
|
144
|
Monday, July 09, 2012, 10:51 |
Travis Cave | ITE | Standard Operation | TM4 | UO#3 | module move | TM#4 with UO#3 from the conditioning station
to the east target station. Move went well. |
|
145
|
Monday, July 09, 2012, 16:08 |
David Wang | ITE | Standard Operation | TM4 | UO#3 | ITM4 in ITE connected and pumping down |
Normal
0
|
|
167
|
Tuesday, September 04, 2012, 11:11 |
Travis Cave | South Hot-Cell | Standard Operation | TM4 | UO#3 | module move | TM#4 with UO#3 has been moved from the
east target station to the south hot cell
for a target exchange. The move went well. |
|
173
|
Friday, September 07, 2012, 09:47 |
Travis Cave | Spent Target Vault | Standard Operation | | UO#3 | Spent target move | The spent UO#3 was moved from the south
hot cell to the storage vault. It was in
pail 98 and placed in spot 1A of the vault, |
|
2403
|
Tuesday, January 10, 2023, 10:15 |
Frank Song | Safe Module Parking | Standard Operation | TM2 | UCx40 removed | TM2 electrical check with no target attached on SW silo | TM2 with no target on SW silo be
electrical checked right after module moving. |
|
2238
|
Wednesday, August 04, 2021, 17:24 |
David Wang | North Hot-Cell | Standard Operation | TM2 | UCx34# | UCX 34# on TM2 electical check and HS leak check at NHC. | The job is done with Matt at NHC. All TGHT
and TBHT bolts are torque wrench tight in
NHC. HS leak check result is good. |
|
1980
|
Monday, September 09, 2019, 06:38 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx27 | HS and window line leak check. | TM4 HS and window line are helium pressure
checked at TCS. 70 psi helium 5 minutes.
No response @1.2XE-8 atm.cc/sec. They are |
|
1981
|
Tuesday, September 10, 2019, 08:25 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx27 | Argan vent TCS. | TCS is argon vented. TM4 is disconnected
at TCS. |
|
1778
|
Friday, September 07, 2018, 10:47 |
David Wang | ITE | Repair | TM4 | UCx24 | TM4 TP2 replacement | TM4 TP2 could not be started after
module was connected back to ITE on Sep 04th.
It was replaced with a new pump on Sep 05th. |
|
1788
|
Friday, September 21, 2018, 10:06 |
David Wang | ITW | Standard Operation | TM2 | UCx23 | TM2 was disconnected in ITW. | TM2 was disconnected in ITW this Tuesday.
See attachment for checklist. |
|
1309
|
Tuesday, August 09, 2016, 07:15 |
David Wang | Conditioning Station | Standard Operation | TM4 | UCx17 | TM4 has been disconnected at TCS | I stopped TCS water pumps this morning
. The argon venting for TCS is in processing. |
|