  ID Date Authordown Category Type Module Target/Number Subject
  1494   Thursday, April 13, 2017, 10:32 chad fisherSouth Hot-CellRepairTM3 TM3 Lower Service Tray Video Inspection

A video inspection of the lower service tray was performed this morning. Camera was inserted upwards into the service tray/service chase from the containment box. One potential spark mark was identified as well as epoxy not flush with insulator. Fiberglass does not extend into service tray/chase much and does not look, from initial inspection that it will be too difficult to remove.

Video can be found in docushare Document-142295

  1504   Wednesday, April 26, 2017, 08:28 chad fisherSouth Hot-CellRepairTM3 TM3 progress and manipulators

containment box was re-installed onto TM3 on Monday, Left manipulator may be showing signs of eminent handle or tong cable failure.

  1507   Wednesday, April 26, 2017, 13:35 chad fisherSouth Hot-CellRepairTM3 TM3 containment box removed

the containment box has been removed from TM3.

  1515   Monday, May 01, 2017, 08:53 chad fisherSouth Hot-CellRepairTM3 Fiberglass removal

Fiberglass, capton tape and tie straps have been removed from TM3.

  1536   Tuesday, May 16, 2017, 13:23 chad fisherSouth Hot-CellStandard OperationTM4UC#20UC#20 Installed

UCx#19 has been removed from TM4 and UCx#20 installed.

UCx#19 still had water in it at pressure and sprayed when the VCR was undone. It was quickly re-tightened but not before significant water pooled beside the main Mykroy standoff and table. Contacted Anders would suggested to soak it up with some wipes and continue, which I did.

New target fasteners including high current. High current fasteners torqued to 130 in lbs.

  1550   Tuesday, June 06, 2017, 13:42 chad fisherSouth Hot-CellStandard OperationTM2SiC#36Ta#51 removed SiC#36 installed

This afternoon Ta#51 was removed from TM2 and SiC#36 installed.

All new fasteners used. High current fasteners torqued to 130 in lbs.

 

 

  1555   Friday, June 09, 2017, 11:21 chad fisherNorth Hot-CellMaintenance  Model 'N' Slave Removal Through Roof

Isaac and Chad disengaged the slave end of the manipulator and performed a slave removal through the slave removal roof hatch. This is part of investigation into a 'Z' motion tape that is "rubbing" on its drum on the master side of the manipulator during manual 'Z' retraction of 'Z' extension.

This also was the first test of the concept of removing the manipulator slave through the manipulator hatch that was built into the roof.

The lifting bail on the slave end of the manipulator was not centered to the hatch as per design but this did not compromise the procedure at all and the procedure otherwise followed the design intent.

Pictures can be located on Docushare  http://documants.triumf.ca/docushare/dsweb/View/Collection-20157

 

 

  1562   Thursday, June 22, 2017, 11:10 chad fisherSouth Hot-CellMaintenance  In cell airline

The in cell airline has preemptively been replaced. The hose was, as far as I know the original.

  1566   Monday, June 26, 2017, 11:47 chad fisherSouth Hot-CellStandard OperationTM4Ta#52UC#20 Removed Ta#52 installed

UC#20 has been removed from TM4 and put in a bucket back-filled with argon. Ta#52 has been installed onto TM4 with new fasteners. High current torqued to 130 in lbs.

  1603   Monday, August 28, 2017, 12:07 chad fisherSouth Hot-CellStandard OperationTM4UCx#21Ta#52 removed UCx#21 installed

Ta#52 has been removed from TM$ and UCx#21 installed with new mounting and high current hardware. High current fasteners torqued to 130 in lbs.

  1617   Tuesday, September 19, 2017, 10:40 chad fisherSouth Hot-CellMaintenance  South East Manipulator Maintenence

Entered hot cell to preform replacement of slave tong cable. Existing cable shows no signs of wear so it has been re-installed. A spare tong cable has been loaded into a spare tong while in the hot cell in preparation for next time this cable needs to be replaced.

  1619   Wednesday, September 20, 2017, 13:38 chad fisherSouth Hot-CellRepairTM2 TM2 Insulator replacement

Broken insulators ITD0053 and ITD0054 have been uninstalled from TM2.

Attachment 1: 20170920_132813.jpg
20170920_132813.jpg
Attachment 2: 20170920_132820.jpg
20170920_132820.jpg
Attachment 3: 20170920_133244.jpg
20170920_133244.jpg
  1621   Thursday, September 21, 2017, 12:07 chad fisherSouth Hot-CellRepairTM2 Insulator Replacement

Insulators ITD0053 and 54 have been replaced. All fasteners torqued to 56 in lbs.

 

  1625   Friday, September 22, 2017, 14:15 chad fisherSouth Hot-CellRepairTM2 TM2 containment box off

TM2 containment box has been removed. Found a piece of capton tape or tubing under table (see picture).

Attachment 1: 20170922_140546.jpg
20170922_140546.jpg
Attachment 2: 20170922_140927.jpg
20170922_140927.jpg
  1627   Wednesday, September 27, 2017, 08:00 chad fisherSouth Hot-CellStandard OperationTM2Ta#54Ta#54 installed

Containment box has been replaced onto TM2, interior of containment box vacuumed, and Ta#54 installed with new fasteners (high current torqued to 130 in lbs).

  1720   Wednesday, May 23, 2018, 10:40 chad fisherSouth Hot-CellRepairTM4 Optics Tray Removal

The optics tray has been removed from TM4.

 

 

Attachment 1: 20180523_103405.jpg
20180523_103405.jpg
Attachment 2: 20180523_103435.jpg
20180523_103435.jpg
Attachment 3: 20180523_103440.jpg
20180523_103440.jpg
  1728   Thursday, May 31, 2018, 14:22 chad fisherSouth Hot-CellRepairTM4 Loop and beam shield

Tray with loop and beam shield has been inserted into the hot cell to be installed on TM4 .

  1729   Monday, June 04, 2018, 13:27 chad fisherSouth Hot-CellRepairTM4 Window Loop and Shield

The tray with window waterline loop and EF Shield has been installed into TM4.

Attachment 1: jhgf.jpg
jhgf.jpg
  1733   Friday, June 08, 2018, 11:36 chad fisherSouth Hot-CellRepairTM2 TM2 Source Tray Removal Progress

The containment box has been removed from TM2, the Enzel lens and steerers disconnected and optics tray removal has commenced.

Attachment 1: TM2_06082018.jpg
TM2_06082018.jpg
  1735   Monday, June 11, 2018, 11:30 chad fisherSouth Hot-CellRepairTM2 TM2 containment box on

Tm2 containment box has been re-installed onto TM2.